Pradhan Mantri Gram Sadak Yojana Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Manpower Supply
Eprocure
Opening Date16 Jul 2018
Closing Date1 Aug 2018
Tender Amount₹ 19,84,35,647 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(II) In area of thorny jungles

8.25

-

-

... More
S H : SETTING OUT

-

-

-

... More
Construction of reference pillars as per Fig 1600.1 (b) as per drawing and techinical specification Clause1602.1

40

-

-

... More
Construction of back pillars as per Fig 1600.1 (c) as per drawing and techinical specification Clause1602.3

15

-

-

... More
DPR preparation , Trace Cutting i/c Survey & Investigation for Hilly Areas. Sub mountainous area with cross slope between 10% to 25%

22

-

-

... More
SH: EARTHWORK IN ROAD FC { Formation cutting }

-

-

-

... More
Excavationof earth work in kinds of soil in Hilly Area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per Technical Specification Clause 1603.1

436018.09

-

-

... More
SH : EARTHEN DRAIN

-

-

-

... More
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1

13031.4

-

-

... More
Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

8687.6

-

-

... More
SH: STRUCTURE

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Upto 3 mtr depth

-

-

-

... More
(i) Ordinary soil upto 3m depth

13016.82

-

-

... More
(ii) Ordinary rock (Not requiring blasting) upto 3m

11394.88

-

-

... More
(iii). 3 mtr to 6 mtr depth

555.12

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 i) Nominal mix 1:3:6

126.19

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 Nominal mix 1:2.5:5

1213.88

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 1st sort ) In 1:4 cement mortar

2746.9

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:4 cement mortar

5095.84

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 With Granular material

2135.4

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614,709, 1204.3.7

2268

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. For design mix RCC M 20

275.53

-

-

... More
Providingand laying reinforced cement concrete in superstructure as per drawing and technical specifications clause 800,1205.4 and 1205.5 (RCC M25)

394.39

-

-

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

48.67

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 (RCC grade M20)

1319.37

-

-

... More
Drainage spouts complete as per drawing and technical specification clause 1209.

28

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204. For height upto 5 m. (RCC Grade M20)

18.79

-

-

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

75.93

-

-

... More
Providing and laying of an elastometri slab expansion joint complete as per approved drawing and approved specification to be installed by manufacture/supplier or their authorised representative ensuring compliance to the manufacture's.

24

-

-

... More
Providing and laying wire created boulder structures boulder size 22.5 cm to 45 cm having 25 kg average weight for each i/c dumping/laying in S.W.G. Wire mesh of 10 cm x 10 cm (woven diagonally) 4mm dia i/c packing with small size stone spalls and carrying of boulders from a lead of 50 mtr and lift up to 1.5 mtr i/c lying properly the mesh by cutting the mouth and hoisting of wire where felt necessary as per direction of Engineer-in-Charge technical specifications Clause 1301. ( Based on SDB Rural Road Chapter-14, Item No.14.2)

340.2

-

-

... More
S H : SIGN BOARD & ROAD FURNITURE

-

-

-

... More
I. Kilometre Stone

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703

-

-

-

... More
i. 5th Kilometre Stone (precast)

4

-

-

... More
ii. Ordinary Kilometer Stone (Precast)

19

-

-

... More
II. Traffic Signs

-

-

-

... More
Providing and fixing of typical PMGSY Citizen information sign board with logo as per MORD specifications and attached drawing. Two M.S plates/boards of 1.6 mm thick, duly welded with MS flat iron cleat 50 mm x 5o mm size on edges. Top and botttom plate will welded to 2 nos. 75 mm tubes posts duly embedded in cement concrete M-15 grade blocks of 600 x 600 x750 cm below ground level . All MS will be stove enameled on both sides. Lettering and printing arrows, boarder etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and clour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1. The rate inclusive of all material, fitting and fixing at site etc.

2

-

-

... More
Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone,approch transition zone,working zone and terminal transition zone with a minimum distance of 2-3 from the edge of the carriage way. the bottom edge of the lowest sign plate to be not less than 2m above the road level,fixed on600mmx699mmx6mm angle iron post, founded and installed as per approved design and drawings,removed and disposed of after completion of construction work,all as per IRC:SP:55-2001.

-

-

-

... More
a. Road ahead closed.

1

-

-

... More
b. Men at work.

1

-

-

... More
c. Slow

1

-

-

... More
d. Diversion.

1

-

-

... More
e. Stop.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.