Pradhan Mantri Gram Sadak Yojana Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Pradhan Mantri Gram Sadak Yojana - PMGSY Tender

Works
Civil And Construction
Eprocure
Opening Date26 Jul 2018
Closing Date25 Aug 2018
Tender Amount₹ 65,53,59,000 
Notes
Download

Costs

Summary

Lower Subansiri District to Tali Block HQ

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of reference pillars as per Fig.1600.1(b) as per drawing and Technical Specification Clause 1602.1

300

-

-

... More
Construction of Job pillars as per Fig.1600.1(d) as per drawing and Technical Specification Clause 1602.4

209

-

-

... More
SH: Earthwork in Road formation Cutting

-

-

-

... More
Excavation in soil in Hilly area by mechinical means including cutting and trimiming of sides slope and disposing of excavated earth with a lift upto 1.50mtr and a lead upto 20mtr as per drawing and technical specification cluase 1603.1.

1042193.88

-

-

... More
Excavation in ordinary rock using mechanical means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

213424.82

-

-

... More
Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2.

109732.31

-

-

... More
(SH : EARTHEN SIDE DRAIN)

-

-

-

... More
Excavation in soil in Hilly Area by manual means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1

11763.02

-

-

... More
Excavation in ordinary rock using manual means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.

3535.62

-

-

... More
Excavation in hilly areas in hard rock requiring blasting, by mechanical means, lift upto 1.5 m and disposal of excavated rock upto a lead of 20 m as per Clause 1603.2.

2807.81

-

-

... More
SH:- C.D. Structure(Slab Culvert 1.50 mtr.Span=148 Nos,2.00mtr.Span=61Nos,4.00mtr.Span=23 Nos,6.00mtr.Span=8 Nos and 10.00mtr.Span = 4 Nos.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side

11501.08

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side

14365.68

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 Nominal mix 1:3.6

2436.12

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:4 cement mortar

11562.1

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:5 cement mortar

7039.28

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 With Granular material

3324.71

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing

10006

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C grade M 20 For design mix RCC M 20

2164.29

-

-

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

2520.44

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. R.C.C M 25

388.08

-

-

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

4.5

-

-

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209

6

-

-

... More
Providing and laying of an elastomeric slab seal expansion joint complete as per approved drawing and approved specifications to be installed by manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer’s instruction

12

-

-

... More
Providing and laying of compression seal joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and formed into the j

12

-

-

... More
Supplying, fitting and fixing tar paper bearings on the top of the abutment cap as directed by the Engineer-in-Charge (Concrete face should be abraded by chipping and grinding and properly cleaned before application of tar paper).

7.2

-

-

... More
Construction of R.C.C ralling of M 25 grade in cast-in-situ with 20 mm moninal size aggregate, true to line and grade, tolerance of vertical ralling post not to exceed 1 in 500, centre-to centre spacing between vertical posts not to exceed 2000 mm as per

20

-

-

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

248.57

-

-

... More
Cost of transportation of planks, equipments and personal effects to the site of work and back as per the mobilisation.

4

-

-

... More
Boring/ drilling holes at the abutments, anchor block in river banks through all kind of soil and rock upto depth of 20 m from the ground level ( 50 mm dia ).

4

-

-

... More
Collection of soil sample and conducting on selection, selected soil and rock samples to natural moisture contents particles size, distribution of liquid and plastic limit, bulk and dry density of confined and specific gravity on soil samples, moisture ab

4

-

-

... More
Compilation of laboratory test result including preparation and submission of report

1

-

-

... More
SH: PROTECTIVE STRUCTURE ( Breast Wall 1.80mtr.ht. = 1050 mtr. and Retaining Wall 4.00mtr.ht. = 1150 mtr. )

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side

2412

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side

4370

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Coursed Rubble masonry ( 2nd sort ) In 1:6 cement mortar

5096.65

-

-

... More
Providing and laying dry rubble flooring complete as per drawing and technical specifications Clauses 1303.3

3968.1

-

-

... More
SH: ROAD FURNITURE,TRAFFIC SIGNS AND MISCELLANEOUS ITEMS

-

-

-

... More
Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703. (i) 5th kilimetre Stone(Precast)

12

-

-

... More
(ii) Ordinary Kilometer Stone (Precast)

60

-

-

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

1

-

-

... More
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3 fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below ground level as per drawings and Technical Specification Clause 801.

12

-

-

... More
Providing and fixing of typical PMGSY Citizen information sign board with logo as per MORD specifications and attached drawing. Two M.S plates/boards of 1.6 mm thick, duly welded with MS flat iron cleat 50 mm x 5o mm size on edges. Top and botttom plate will welded to 2 nos. 75 mm tubes posts duly embedded in cement concrete M-15 grade blocks of 600 x 600 x750 cm below ground level . All MS will be stove enameled on both sides. Lettering and printing arrows, boarder etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and clour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1. The rate inclusive of all material, fitting and fixing at site etc.

1

-

-

... More
Provision and fixing of traffic signs for limited period at suitable locations in construction zone comprising of warning zone,approch transition zone,working zone and terminal transition zone with a minimum distance of 2-3 from the edge of the carriage way. the bottom edge of the lowest sign plate to be not less than 2m above the road level,fixed on600mmx699mmx6mm angle iron post, founded and installed as per approved design and drawings,removed and disposed of after completion of construction work,all as per IRC:SP:55-2001. (a) Road ahead closed.

2

-

-

... More
(b) Stop

2

-

-

... More
C/o Single Lane 40.00 mtr. Span Bailey Bridge over River Herin

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side and bottom and backfilling in trenches with excavated suitable material. b) Upto 9 m depth

308

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

26.9

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

618

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204.

6.86

-

-

... More
Providing weepholes in stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

76

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in foundation complet as per drawing and techanical specification Clauses 1000,&1202

1.51

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in substructure complete as per drawing and techanical specification Clauses 1002,1005,1010&1202

1.49

-

-

... More
Manufacturing and supplying of all components of GRSE Portable Steel Deck Bailey Bridge for DSR Construction,extrawide (Carriageway width 4.25 m) bridge, suitable upto class 40 R loading as per IRC:6, complete with steel decking, End posts, Base plates, Bearing etc. but excluding the cost of fitting, fitting & erection.

1

-

-

... More
Fitting, fixing and erection/launching of standard bailey bridge complete as per technical specification clause

80.85

-

-

... More
Cost of transportation of plants, equipments and personal effects to the site of work and back as per the mobilisation.

1

-

-

... More
Boring/ drilling holes at the abutments, anchor block in river banks through all kind of soil and rock upto depth of 20 m from the ground level ( 50 mm dia ).1 bore in each abutment point @ 5.00 M Deep

12

-

-

... More
Collection of soil sample and conducting on selection, selected soil and rock samples to natural moisture contents particles size, distribution of liquid and plastic limit, bulk and dry density of confined and specific gravity on soil samples, moisture absorption cost, unit weight, ceriazial compressive strength test etc. complete.

2

-

-

... More
Compilation of laboratory test result including preparation and submission of report

1

-

-

... More
C/o Single Lane 40.00 mtr. Span Bailey Bridge over River Pai.

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side and bottom and backfilling in trenches with excavated suitable material. b) Upto 9 m depth

308

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

26.9

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

618

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204.

6.86

-

-

... More
Providing weepholes in stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

76

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in foundation complet as per drawing and techanical specification Clauses 1000,&1202

1.51

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in substructure complete as per drawing and techanical specification Clauses 1002,1005,1010&1202

1.49

-

-

... More
Manufacturing and supplying of all components of GRSE Portable Steel Deck Bailey Bridge for DSR Construction,extrawide (Carriageway width 4.25 m) bridge, suitable upto class 40 R loading as per IRC:6, complete with steel decking, End posts, Base plates, Bearing etc. but excluding the cost of fitting, fitting & erection.

1

-

-

... More
Fitting, fixing and erection/launching of standard bailey bridge complete as per technical specification clause

80.85

-

-

... More
Cost of transportation of plants, equipments and personal effects to the site of work and back as per the mobilisation.

1

-

-

... More
Boring/ drilling holes at the abutments, anchor block in river banks through all kind of soil and rock upto depth of 20 m from the ground level ( 50 mm dia ).1 bore in each abutment point @ 5.00 M Deep

12

-

-

... More
Collection of soil sample and conducting on selection, selected soil and rock samples to natural moisture contents particles size, distribution of liquid and plastic limit, bulk and dry density of confined and specific gravity on soil samples, moisture absorption cost, unit weight, ceriazial compressive strength test etc. complete.

2

-

-

... More
Compilation of laboratory test result including preparation and submission of report

1

-

-

... More
C/o Single Lane 50.00 mtr. Span Bailey Bridge over River Salu

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side and bottom and backfilling in trenches with excavated suitable material. b) Upto 9 m depth

1865.67

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

167.65

-

-

... More
Providing concrete for plain/reinforeced concreete in open foundation complete as per drawings and techanical specification clause 802,803,1202,1203 (PCC grade M 20 1:2:4)

1089.8

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204.For height upto 5 m R.C.C. grade M 25

18.5

-

-

... More
Providing weepholes in stone masonary, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

296

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in foundation complet as per drawing and techanical specification Clauses 1000,&1202

5.91

-

-

... More
Supplying, fitting and placing with HYSD bar reinforcment (Fe 415) in substructure complete as per drawing and techanical specification Clauses 1002,1005,1010&1202

3.81

-

-

... More
Manufacturing and supplying of all components of GRSE Portable Steel Deck Bailey Bridge for DSR Construction,extrawide (Carriageway width 4.25 m) bridge, suitable upto class 40 R loading as per IRC:6, complete with steel decking, End posts, Base plates, Bearing etc. but excluding the cost of fitting, fitting & erection.

1

-

-

... More
Fitting, fixing and erection/launching of standard bailey bridge complete as per technical specification clause

99

-

-

... More
Cost of transportation of plants, equipments and personal effects to the site of work and back as per the mobilisation.

1

-

-

... More
Boring/ drilling holes at the abutments, anchor block in river banks through all kind of soil and rock upto depth of 20 m from the ground level ( 50 mm dia ).1 bore in each abutment point @ 5.00 M Deep

12

-

-

... More
Collection of soil sample and conducting on selection, selected soil and rock samples to natural moisture contents particles size, distribution of liquid and plastic limit, bulk and dry density of confined and specific gravity on soil samples, moisture absorption cost, unit weight, ceriazial compressive strength test etc. complete.

2

-

-

... More
Compilation of laboratory test result including preparation and submission of report

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.