Tender Amount₹ 5,09,91,000 
Notes
Download

Costs

Summary

C/o Rcc Bridge With Bug Girder Span 1x55m Over Drum River

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
II) Ordinary rock (not requiring blasting)Upto 3 m depth

282.28

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6

10.01

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25

109.19

-

-

... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)

11.2

-

-

... More
Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed.

100

-

-

... More
Sub-structure

-

-

-

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m IV) RCC Grade M25

242.81

-

-

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/JINDAL/SHYAM STEEL)

15.75

-

-

... More
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

424

-

-

... More
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications

424

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

100

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 I) Granular material

366.66

-

-

... More
Super-structure

-

-

-

... More
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications Clause 1205.6 Steel section

130.79

-

-

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 R.C.C. Grade M 30

99.63

-

-

... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)

13.72

-

-

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

127

-

-

... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawing and standerd specifications to be installed by the manufacturer,s instructions for installation.

12.1

-

-

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209

24

-

-

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 (i) Nominal mix (1:2.5:5)

5.63

-

-

... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211

11.25

-

-

... More
Protection Works :

-

-

-

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

287.72

-

-

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 I) Stone/Boulder

99.04

-

-

... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302

49.52

-

-

... More
River Traning Works :

-

-

-

... More
Providing and laying boulder of size 22.5 cm to 45 cm having 25 kg average weight for each i/c dumping/laying in PVC coated double twisted wire mesh container i/c packing with small size stone spalls and carrying of boulders from a lead of 50 mtr and lift up to 1.5 mtr i/c lying properly where felt necessary as per direction of Engineer-in-Charge .

-

-

-

... More
(i) Size = 1 m x 1 m x 1 m =1 cum

100

-

-

... More
(iii) Size = 2 m x 1 m x 1m = 2 cum

100

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material

30.1

-

-

... More
Dismantling of Existing Cause way

-

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

-

-

-

... More
(ii) By Mechanical Means (A) Cement Concrete

33.6

-

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structures comprising of brick masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (B) Cement mortar

36

-

-

... More
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. (C) Above 900 mm dia Hume pipe

60

-

-

... More
Dismantling of Cement Concrete Pavements as per Technical Specification Clause 202.

50.4

-

-

... More
Retaining Wall

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material Ordinary soil Upto 3 m depth

132.16

-

-

... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6

33.6

-

-

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204 Random rubble masonry In cement mortar (1:5)

232.96

-

-

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular material

116.99

-

-

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

55

-

-

... More
Embankment

-

-

-

... More
Constrction of embankment with approved materials obtained from borrows pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slop and compacting to meet requirement of table 300.1 and 300.2 with lead upto 1000m as per Technic

3364.98

-

-

... More
Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits with lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 300.2 with lead upto 1000

189

-

-

-

-

-

... More
Granular Sub-base with Well Graded Material (Table 400.1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. (i) For Grading I Material

91.13

-

-

... More
Cement Treated Base

-

-

-

... More
Providing, laying and spreading soil on a prepared sub-grade, pulverising, adding the designed quantity of cement to the spread soil, mixing in place with rotavator, grading with the motor grader and compacting with the road roller at OMC to achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Technical Specification Clause 404.

70.31

-

-

... More
Prime Coat

-

-

-

... More
Prime Coat ( i ) Low porosity Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.20 kg/sqm using mechanical means as per Technical Specification Clause 502

563

-

-

... More
Track Coat

-

-

-

... More
Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503

563

-

-

... More
M.S.S.

-

-

-

... More
Mix seal surfacing with 5% waste plastic Providing, laying and rolling of close-graded premix surfacing material of 25 mm thickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm (Type-B) aggregates using penetration grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and wheel 8-10 kN static roller and finishing to required level and grades as per Technica Specification Clause 509

563

-

-

... More
Logo & Informatory Board

-

-

-

... More
Providing and Fixing PMGSY Logo Board at starting point Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cmx25cmx90cm below G.L. & 15cm x 15cm x 260cm above G.L.), (Size of board 1x 85cm x 85cm x 7.5cm) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.

1

-

-

... More
Providing and Fixing Title information Board of PMGSY Project (RCC) Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cm x 25cm x 90cm below G.L. & 15cm x 15cm x 245cm above G.L.), (Size of board 2 x 90cm x 80cm x 7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.

2

-

-

... More
ConfirmitySS I & Load Test

-

-

-

... More
(i) Conduct of Bore Hole Testing, as per IS:54:2000 sinking of 150 mm dia Bore Hole into the Sub Surface and conduct of all necessary tests and submission of report with recommendation in three copies.

1

-

-

... More
(iv) Conduct of acceptance load testing of completed bridge before opening to the traffic.

1

-

-

... More
Routine Maintenance

-

-

-

... More
First Year

-

-

-

... More
Second Year

-

-

-

... More
Third Year

-

-

-

... More
Fourth Year

-

-

-

... More
Fifth Year

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.