Pradhan Mantri Gram Sadak Yojana Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Pradhan Mantri Gram Sadak Yojana - PMGSY Tender
Civil And Construction
Bridge Construction
Eprocure
Opening Date23 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 5,18,69,000
Costs
EMD
₹ 10,37,000Document Cost
₹ 15,000Tender Fee
Refer Documents
Summary
Construction Of Rcc Bridge With Bug Girder Span 2 X 30.00m Over Siney River Branch 2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEAR_136385_1Bid Award Id
ViewTender No
AR1501246125BTender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
II) Ordinary rock (not requiring blasting)
389.73
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 10 Nominal mix 1:3:6
18.88
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 R.C.C. grade M 25
253.33
-
-
... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
23.97
-
-
... More
Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed.
144
-
-
... More
Sub-structure
-
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
For height upto 5 m
IV) RCC Grade M25
328.53
-
-
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/JINDAL/SHY
29.18
-
-
... More
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
600
-
-
... More
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications
600
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
100
-
-
... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
I) Granular material
213.66
-
-
... More
Super-structure
-
-
-
... More
Providing steel R.S.Js/built-up steel sections including cutting, welding/rivetting, hoisting, fixing in position for composite girders with shear connectors complete with painting as per drawing and technical specifications Clause 1205.6
Steel section
111.22
-
-
... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
R.C.C. Grade M 30
116.58
-
-
... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
11.22
-
-
... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
25.33
-
-
... More
Providing fitting and fixing mild steel railing complete as per drawing and technical specifications Clause 1208.2
138.2
-
-
... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawing and standerd specifications to be installed by the manufacturer,s instructions for installation.
24.15
-
-
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209
26
-
-
... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211
(i) Nominal mix (1:2.5:5)
5.63
-
-
... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
11.25
-
-
... More
Protection Works :
-
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25
311.4
-
-
... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
I) Stone/Boulder
186.38
-
-
... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
93.2
-
-
... More
Approach Road :
-
-
-
... More
Constrction of embankment with approved materials obtained from borrows pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slop and compacting to meet requirement of table 300.1 and 300.2 with lead upto 1000m as per Technic
685.27
-
-
... More
Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits with lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table 300.1 & 300.2 with lead upto 1000
27.8
-
-
... More
Granular Sub-base with Well Graded Material (Table 400.1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rot
32.63
-
-
... More
Gravel/Soil-Aggregate Base (Table 400.2) Grading A
65.25
-
-
... More
WBM Grading 3
48.94
-
-
... More
Prime Coat
(i) Low porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical
652.5
-
-
... More
Tack Coat
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.20 to 0.25 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.
652.5
-
-
... More
20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade/modified bitumen) Binder
652.5
-
-
... More
Seal Coat
652.5
-
-
... More
Providing and Fixing PMGSY Logo Board at starting point
Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cmx25cmx90cm below G.L. & 15cm x 15cm x 260cm above G.L.), (Size of bo
1
-
-
... More
Providing and Fixing Title information Board of PMGSY Project (RCC)
Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cm x 25cm x 90cm below G.L. & 15cm x 1
2
-
-
... More
Retaining Wall : 5.00m
-
-
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of side
455.95
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 10
Nominal mix 1:3:6
88.32
-
-
... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Random rubble masonry
In cement mortar (1:5)
791.57
-
-
... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Granular material
403.62
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing
186
-
-
... More
Tests
-
-
-
... More
Conduct of Bore Hole Testing as per IRC:54:2000, sinking of 150 mm dia Bore Hole into the suub surface and conduct of all necessary tests and submission of report with recommendation in three copies.
1
-
-
... More
Conduct of acceptance load testing of completed bridge before opening to the traffic.
1
-
-
... More
Routine Maintenance
-
-
-
... More
First Year
-
-
-
... More
Second Year
-
-
-
... More
Third Year
-
-
-
... More
Fourth Year
-
-
-
... More
Fifth Year
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements