Bridge Construction
Eprocure
Opening Date6 Sep 2024
Closing Date23 Sep 2024
Tender AmountRefer Documents
Costs
EMD
₹ 3,14,000Document Cost
₹ 15,000Tender Fee
Refer Documents
Summary
Co Rcc Bridge Span 1x16.50m At Chainage 19700.0m Over Rukso River.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEAR_136226_1Bid Award Id
ViewTender No
AR0701MRL07ETender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
The EE/PIU, RWD, Poma Yupia, Papum Pare District, Arunachal Pradesh on Behalf of HE Governor of Arunachal Pradesh invites the item rate bids in electronic tendering system for construction of bridge under PMGSY.
Standard Bidding Documents of the tender.
BOQ Items
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 10
Nominal mix 1:3:6
12.25
-
-
... More
Supplying, fitting and placing TMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
14.62
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
R.C.C. grade M 25
134.69
-
-
... More
Providing and inserting dowels bars of 25 mm dia (TMT) to a depth of 500 mm anchored in the hard rock by grouting with cement slurry, as per specification and making good all complete as directed.
100
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
For height upto 5 m
IV) RCC Grade M25
301.19
-
-
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/JINDAL/SHYAM STEEL)
19.91
-
-
... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
54054
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
120
-
-
... More
SH: SUPERSTRUCTURE
-
-
-
... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
19.46
-
-
... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5. III. RCC. Grade M 30.
80.77
-
-
... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
9.65
-
-
... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawing and standerd specifications to be installed by the manufacturer,s instructions for installation.
16.9
-
-
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209
16
-
-
... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
46.3
-
-
... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211
(i) Nominal mix (1:2.5:5)
6.12
-
-
... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
12.24
-
-
... More
SH: PROTECTION WORK
-
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
47.08
-
-
... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
I) Stone/Boulder
25.84
-
-
... More
SH: Approach road
-
-
-
... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
12.92
-
-
... More
Constrction of embankment with approved materials obtained from borrows pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slop and compacting to meet requirement of table 300.1 and 300.2 with lead upto 1000m as per Technical Specification Clause 301.5
164.86
-
-
... More
Constrction of embankment with approved materials obtained from borrows pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slop and compacting to meet requirement of table 300.1 and 300.2 with lead upto 1000m as per Technical Specification Clause 301.5
20.82
-
-
... More
Granular Sub-base with Well Graded Material (Table 400.1)
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
(i) For Grading I Material
9.74
-
-
... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
12.32
-
-
... More
Providing and Fixing PMGSY Logo Board at starting point
Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cmx25cmx90cm below G.L. & 15cm x 15cm x 260cm above G.L.), (Size of board 1x 85cm x 85cm x 7.5cm) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
1
-
-
... More
Providing and Fixing Title information Board of PMGSY Project (RCC)
Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cm x 25cm x 90cm below G.L. & 15cm x 15cm x 245cm above G.L.), (Size of board 2 x 90cm x 80cm x 7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
2
-
-
... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701
309.99
-
-
... More
Total Routine Maintenance Cost
-
-
-
... More
First Year
-
-
-
... More
Second Year
-
-
-
... More
Third Year
-
-
-
... More
Fourth Year
-
-
-
... More
Fifth Year
-
-
-
... More
Construction Cost without GST
-
-
-
... More