Civil And Construction
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date23 Sep 2024
Closing Date7 Oct 2024
Tender Amount₹ 2,44,60,000
Costs
EMD
₹ 4,89,200Document Cost
₹ 15,000Tender Fee
Refer Documents
Summary
Construction Of Rcc Bridge Span 1 X 24.75 M At Chainage 1845.00 M Over Phai Nala
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CEAR_136371_1Bid Award Id
ViewTender No
AR05066334ATender Authority
Pradhan Mantri Gram Sadak Yojana ViewPurchaser Address
-Website
http://http://omms.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm)
272
-
-
... More
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test.
450
-
-
... More
Levelling course for Pile cap
11.99
-
-
... More
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification
P.C.C grade M 25
(I) Using Concrete Mixer
165.36
-
-
... More
Supplying, fitting and placingTMT bar reinforcement in foundation complete as per
drawings and technical specifications Clauses 1000 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
45.3
-
-
... More
Sub-structure
-
-
-
... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204
For height upto 5 m
IV) RCC Grade M25
79.96
-
-
... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/JINDAL/SHYAM STEEL)
9.81
-
-
... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
106920
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
100
-
-
... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
I) Granular material
234.6
-
-
... More
Super-structure
-
-
-
... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
R.C.C. Grade M 30
125.95
-
-
... More
Supplying, fitting, and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202. (The steel to be used should be from primary producer like TATA/SAIL/ESSER STEEL/ JINDAL/SHYAM STEEL)
20.48
-
-
... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3
14.29
-
-
... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3
66.2
-
-
... More
Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawing and standerd specifications to be installed by the manufacturer,s instructions for installation.
16.9
-
-
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209
12
-
-
... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211
(i) Nominal mix (1:2.5:5)
6.8
-
-
... More
Reinforced Cement Concrete M 25 grade approach slab including reinforcement and formwork complete as per drawing and technical specifications Clauses 800 and 1211
13.59
-
-
... More
Protection Works :
-
-
-
... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301
141.49
-
-
... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302
I) Stone/Boulder
50.04
-
-
... More
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specifications Clause 1302
30.02
-
-
... More
Approach Road :
-
-
-
... More
Constrction of embankment with approved materials obtained from borrows pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slop and compacting to meet requirement of table 300.1 and 300.2 with lead upto 1000m as per Technic
2565.63
-
-
... More
Providing and Fixing PMGSY Logo Board at starting point
Providing and fixing of typical PMGSY Logo board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cmx25cmx90cm below G.L. & 15cm x 15cm x 260cm above G.L.), (Size of board 1x 85cm x 85cm x 7.5cm) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
1
-
-
... More
Providing and Fixing Title information Board of PMGSY Project (RCC)
Providing and fixing of typical PMGSY Citizen information sign board as per MORD specifications and drawing of cast-in-situ RCC, (Size of RCC post 25cm x 25cm x 90cm below G.L. & 15cm x 15cm x 245cm above G.L.), (Size of board 2 x 90cm x 80cm x 7.5cm, ) incl.earth work, finishing with 15mm pluster 1:4 and neat cement punning, applying priming coat, painting and lettering with appropiate colour with required shade of approved quality ready mix paint.
2
-
-
... More
Retaining Wall : 5.00 M
-
-
-
... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material
Ordinary soil
Upto 3 m depth
49.56
-
-
... More
Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
P.C.C grade M 10
Nominal mix 1:3:6 Wall Base
12.6
-
-
... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Random rubble masonry
In cement mortar (1:5)
87.36
-
-
... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8
Granular material
43.87
-
-
... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
22
-
-
... More
Miscellaneous Items (Conformity SSI ,Pile Integrity Test & Load Test ) :
-
-
-
... More
(i) Conduct of Bore Hole Testing, as per IS:54:2000 sinking of 150 mm dia Bore Hole into the Sub Surface and conduct of all necessary tests and submission of report with recommendation in three copies.
0.5
-
-
... More
(iii) Pile Integrity Test (PIT) as per IRC:78:2014 using Low Strain Integrity Testing Method for Both banks and Mid Piers.
2
-
-
... More
(iv) Conduct of acceptance load testing of completed bridge before opening to the traffic.
1
-
-
... More
Routine Maintenance
-
-
-
... More
First Year
-
-
-
... More
Second Year
-
-
-
... More
Third Year
-
-
-
... More
Fourth Year
-
-
-
... More
Fifth Year
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements