North Eastern Electric Power Corporation Limited Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

North Eastern Electric Power Corporation Limited - NEEPCO Tender

Works
Civil And Construction
Machinery and Tools
Eprocure
Opening Date1 Dec 2023
Closing Date25 Nov 2024
Tender Amount₹ 1,42,73,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
1.1.2 Dewatering of underground construction sites including all plants, materials, labour, installation, operation, power supply, maintenance and removal of pumping equipment from site

350000

-

-

... More
1.1.3 Construction of Temporray Ring Bund Complete in all respect with all plant, materials, labour, all lead & lifts, etc. as per technical specifications, drawings and as directed by Engineer-in-Charge

-

-

-

... More
1.1.3.1 Clay/Earth/Random Fill

15000

-

-

... More
2. SURFACE EXCAVATION AND BACKFILL

-

-

-

... More
2.1 Surface excavation including loading, transport, all lift and lead up to 3.0 km from the excavation area/working site, unloading at disposal sites or stockpiles and maintenance of the disposal sites or stockpiles. Construction of haul roads (if any) and its maintenance. Complete in all respect as per technical specification, drawings and as directed by Engineer- in-Charge.

-

-

-

... More
2.1.1 Diversion Tunnel

-

-

-

... More
2.1.1.1 Clearing of excavation areas, disposal areas and stockpiles

8993

-

-

... More
2.1.1.2 Excavation in soil including stripping of top soil

33177

-

-

... More
2.1.1.3 Excavation in soft and disintegrated rock

50000

-

-

... More
2.1.1.4 Excavation in hard rock

-

-

-

... More
(a) Drilling and blasting

27411

-

-

... More
(b) Line-drilling

1000

-

-

... More
2.1.2 Cost of Haulage including loading & unloading of excavated materials For all types of Tracks beyond initial lead of 3.00km (Lead = 2 km)

11059

-

-

... More
2.1.3 Backfilling

-

-

-

... More
(a) Random backfill

3567

-

-

... More
(b) Selected backfill

250

-

-

... More
(c) Free-draining backfill

300

-

-

... More
(d) Sand-gravel backfill

100

-

-

... More
2.1.4.1 Providing and laying Pitching complete as per drawings and technical specifications at locations as directed by the Engineer-in-Charge Stone/ Boulders

600

-

-

... More
2.1.4.2 Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawings and technical specification. Boulders laid without wire crates

200

-

-

... More
3. UNDERGROUND EXCAVATION

-

-

-

... More
3.1 Underground excavation of Diversion Tunnel including excavation by drill and blast, mechanical, manual or conventional methods; including all survey and setting-out, all lifts, transportation and unloading at disposal sites upto 3.0 km from the nearest portal and including maintenance of the disposal sites or stockpiles. Construction of haul roads (if any) and its maintenance. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.

-

-

-

... More
3.1.1 Diversion Tunnel including handling of excavated materials upto 3.0 km from the nearest portal

-

-

-

... More
(a) Excavation in class 2

50727

-

-

... More
(b) Excavation in class 3

103979

-

-

... More
(c) Excavation in class 4

9382

-

-

... More
(d) Excavation in class 5

10228

-

-

... More
3.1.2 Loading, transport including all lift and lead upto 3.0 km and unloading of accepted geological overbreak of Diversion Tunnel at disposal areas or stockpiles

25103

-

-

... More
3.1.3 Cost of Haulage including loading & unloading of excavated materials Katcha Track beyond initial lead of 3.00km (Lead = 2 km)

19942

-

-

... More
4. ROCK SUPPORT

-

-

-

... More
4.1 Rock support for underground excavation of Diversion Tunnel including all plants, materials and labour. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge.

-

-

-

... More
4.1.1 Shotcrete M25 including admixtures in underground works with articulated wet type shotcrete machine to the theoretical thickness as shown on the drawings or as directed by the Engineer-in-charge

-

-

-

... More
(a) Without Steel Fibre Reinforcement

486

-

-

... More
(b) With Steel Fibre Reinforcement

3064

-

-

... More
4.1.2 Supply and fixing in position Precast R.C.C. laggings

393

-

-

... More
4.1.3 Supply and installation of resin/cement grouted rock bolts of any size and length in underground excavations, as shown on the drawings or as directed by the Engineer-in- charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect

-

-

-

... More
(a) 25mm dia

58026

-

-

... More
(b) 32mm dia

100

-

-

... More
4.1.4 Supply and installation of Swellex Type rock bolts of any size and length in underground excavations, as shown on the drawings or as directed by the Engineer-in-charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect 25 mm dia

3060

-

-

... More
4.1.5 Fabrication and erection of Steel ribs as permanent support as per the drawings or as directed by the Engineer-in-charge including all plants, materials, labour and accessories. Complete in all respect

294

-

-

... More
4.1.6 Supply and providing of Forepoling with grouted anchor bars, length, dia, spacing and overlap to be determined on site by the Engineer-in-charge including all plants, materials and labour. Complete in all respect

58

-

-

... More
4.1.7 Providing & fixing high tensile seamless pipe casing (minimum 21m long) of dia. 76-139mm & thickness 6-10mm, driven into medium using symmetrix drilling system (or equivalent) using sacrificial drill bits with all materials, accessories, equipments-machineries and labour ect. as per technical specification, drawings and as directed by Engineer-in-Charge complete in all respect.

58

-

-

... More
4.1.8 Providing steel canopy support in underground excavation (HRT) including supplying , fabrication and installation at site with all materials, accessories, equipments-machineries and labour ect. as per technical specification, drawings and as directed by Engineer-in- Charge complete in all respect.

50

-

-

... More
4.1.9 Welded Wire Mesh

39126

-

-

... More
5. SLOPE PROTECTION

-

-

-

... More
5.1 Slope protection in surface excavation including all plants, materials and labour. Complete in all respect as per technical specification, drawings and as directed by Engineer-in-Charge

-

-

-

... More
5.1.1 Rip-Rap

-

-

-

... More
5.1.1.1 Bedding

500

-

-

... More
5.1.1.2 Rip-Rap

250

-

-

... More
5.1.2 Rock Paving

-

-

-

... More
5.1.2.1 Dry rock paving

500

-

-

... More
5.1.2.2 Rock paving in mortar

500

-

-

... More
5.1.3 Gabions

738

-

-

... More
5.1.4 Masonary walls

1000

-

-

... More
5.1.5 Supply and installation of resin/cement grouted rock bolts of ø 25 mm, length = variable in surface excavations, as shown on the drawings or as directed by the Engineer-in-charge, including all plants, materials and labour required for drilling, cleaning, installing, grouting and testing of the bolts. Complete in all respect

6104

-

-

... More
5.1.6 Shotcrete M25 including admixtures in open excavation with dry type/articulated wet type shotcrete machine to the theoretical thickness as shown on the drawings or as directed by the Engineer-in-charge

-

-

-

... More
5.1.6.1 Without Steel Fibre Reinforcement

500

-

-

... More
5.1.6.2 With Steel Fibre Reinforcement

488

-

-

... More
5.1.7 Wire mesh

-

-

-

... More
5.1.7.1 Chain link fabric/Welded wire mesh

-

-

-

... More
(a) Welded Wire Mesh

3500

-

-

... More
5.1.8 Supply and Installation of Grouted Anchor Bars of any size and length alongwith all plants, materials and labour required or drilling, cleaning, installing and grouting. Complete in all respect

-

-

-

... More
5.1.8.1 25 mm dia

500

-

-

... More
5.1.8.2 32mm dia

500

-

-

... More
6. CONCRETE

-

-

-

... More
6.1 Complete in all respect with all plants, materials, formwork, scaffoldings, staging, labour, all lead and lift etc. as per technical specification, drawings and as directed by Engineer-in- Charge.

-

-

-

... More
6.1.1 Plain/reinforced cement concrete in Inlet & Outlet Structures, etc.

-

-

-

... More
6.1.1.1 M15-40

7

-

-

... More
6.1.1.2 M20-40

10605

-

-

... More
6.1.1.3 Concrete block for launching apron (M 15-40)

164

-

-

... More
6.1.1.3.1 Second stage concrete in blockout including formwork

-

-

-

... More
6.1.1.4 M25-20

168

-

-

... More
6.1.1.5 M-15 in backfill, foundation & earth retaining structures

500

-

-

... More
6.1..2 Plain/reinforced cement concrete in Diverson Tunnel

-

-

-

... More
6.1.2.1 Cement concrete of M25 grade in Diversion Tunnel lining including formwork

22242

-

-

... More
6.1.2.2 Backfilling upto pay line with M20 concrete

760

-

-

... More
6.1.2.3 Backfilling of accepted geological overbreak (upto 7% of pay line) with M20 concrete for Diversion Tunnel

25103

-

-

... More
7. STEEL FOR REINFORCEMENT

-

-

-

... More
7.1 Complete in all respect with all plants, materials, labour, all lead and lift etc. as per technical specification, drawings and as directed by Engineer-in-Charge.

-

-

-

... More
7.1.1 Mild Steel Reinforcement

50

-

-

... More
7.1.2 High yield strength deformed reinforcement

-

-

-

... More
7.1.2.1 Diversion Tunnel

100

-

-

... More
7.1.2.2 Inlet & Outlet Structures

1750

-

-

... More
8. DRILLING

-

-

-

... More
8.1 Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by Engineer-in-Charge.

-

-

-

... More
8.1.1 Percussion drilling

-

-

-

... More
8.1.1.1 Diversion Tunnel

-

-

-

... More
(a) Drill holes up to ø 48 mm, length 10 - 30 m

16428

-

-

... More
8.1.2 Rotary drilling

-

-

-

... More
8.1.2.1 Diversion Tunnel

-

-

-

... More
8.1.2.1.1 Drill holes up to ø 76/80 mm, length 30 m

10925

-

-

... More
8.1.3 Installation of pipes

-

-

-

... More
8.1.3.1 Supply and installation of PVC pipes of 76mm dia (plain or slotted) including fittings and accessories

10925

-

-

... More
8.1.4 Drilling for Pre- Grouting

-

-

-

... More
8.1.4.1 Drill holes up to ø 45 mm upto 10mm long for Pre-Grouting with Cement

1000

-

-

... More
8.1.4.2 Drill Holes up to 57mm upto 30m long for Pre-Grouting with Colloidal Silica

1000

-

-

... More
9. GROUTING

-

-

-

... More
9.1 Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by Engineer-in-Charge.

-

-

-

... More
9.1.1 Contact grouting, grouting pressure = 2 to 5 kg/cm2

-

-

-

... More
9.1.1.1 Contact grouting behind tunnel liner (concrete or steel)

3680

-

-

... More
9.1.2 Consolidation and curtain grouting (grouting pressure = 2 to 20 kg/cm2)

-

-

-

... More
9.1.2.1 Diversion Tunnel, Inlet, Outlet, Portal and in any other areas as directed by the Engineer-in Charge

-

-

-

... More
(a) Single - stage grouting

5000

-

-

... More
(b) Multiple - stage grouting, descending

10000

-

-

... More
(c) Multiple - stage grouting, ascending

10520

-

-

... More
(d) sand to be used in sand-cement grouting

500

-

-

... More
(e) Pre-grouting with Cement

1000

-

-

... More
(f) Pre-grouting with Colloidal Silica

4000

-

-

... More
9.1.3 Water pressure testing

-

-

-

... More
9.1.3.1 Simple water pressure tests

100

-

-

... More
9.1.3.2 Comprehensive water pressure tests

100

-

-

... More
10. INSTRUMENTATIONS AND MONITORING

-

-

-

... More
10.1 Tape extensometer station

100

-

-

... More
10.2 Optical convergence measurement station

100

-

-

... More
11. MISCELLENEOUS STEEL SECTIONS

-

-

-

... More
11.1 Supply, fittings & fixings of metal works in all structure. Complete in all respect with all plants, materials and labour as per technical specification, drawings and as directed by the Engineer-in-Charge

-

-

-

... More
11.1.1 Supply & Installation of Steel Pipes

-

-

-

... More
11.1.1.1 75 mm dia.

50

-

-

... More
11.1.1.2 100 mm dia.

50

-

-

... More
11.1.1.3 200 mm dia.

50

-

-

... More
11.1.1.4 300 mm dia.

50

-

-

... More
11.1.2 Miscelleneous Steel Sections

10

-

-

... More
11.1.3 Ladders & Climbing Iren

50

-

-

... More
11.1.4 Erection Hooks

500

-

-

... More
11.1.5 Steel Anchoring

500

-

-

... More
11.1.6 Supply & installation of Non Return Valve in Diversion Tunnel

10

-

-

... More
12. HYDRO-MECHANICAL WORKS

-

-

-

... More
12.1 Design, supply, manufacture, inspection, shop assembly, painting, transportation, site storage & site erection, testing & commissioning including all labor, tools, tackles, plant & material of 4100 mm x 10400 mm fixed wheel type Diversion Tunnel Gate complete with accessories like wheels, guide Rollers, seals, lifting lugs and embedded parts including sill beam, seal seats, guides, tracks, etc. in accordance with technical specifications, drawing and as per instruction of the Engineer-In-Charge.

4

-

-

... More
12.1.1 Gate Leaf: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour tools, tackles, plant & machineries, etc.

-

-

-

... More
12.1.2 Embedded Parts: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour tools, tackles, plant & machineries, etc.

-

-

-

... More
12.2 Steel Lining upstream & downstream of gate groove including groove lining including all necessary embedment and stiffeners complete as per specifications and drawings to the satisfaction of Engineer-in-Charge:

38.5

-

-

... More
12.2.1 Break-up: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including insurance 5. Cost of erection including cost of labour, tools, tackles, plant & machineries, etc.

-

-

-

... More
12.3 Design, manufacture, inspection, shop assembly, painting, transportation, site storage & site erection, testing & commissioning including all labor, tools, tackles, plant & material of electrically operated rope drum hoists suitable for operation of diversion tunnel gate of size 4100 mm x 10400 mm under conditions specified in technical specification complete with all accessories including local control panels, trestles and hoist bridge in accordance with the specifications and drawings to the satisfaction of Engineer-In-Charge.

4

-

-

... More
12.3.1 Break-up: 1. Cost of Design & Drawings 2. Material Cost 3. Fabrication Cost including painting 4. Transportation Cost including Insurance 5. Cost of erection including cost of labour, tools, tackles, plant & machineries, etc.

-

-

-

... More
12.4 Design, manufacturer & supply at site of the spare parts as per list given in the technical specification

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.