North Eastern Electric Power Corporation Limited Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

North Eastern Electric Power Corporation Limited - NEEPCO Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Oct 2024
Closing Date29 Nov 2024
Tender Amount₹ 13,08,94,164 
Notes
Download

Costs

Summary

Construction Of Approach Road From Tato-manigong Road (ch. 00.00 Km)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(A).In area of light jungle

4.91

-

-

... More
(B). In area of thorny jungle

3.27

-

-

... More
Land Slide Clearance in soil Clearance of land slides in soil and ordinary rock by a Hydraulic Excavator including loding in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m.

4800

-

-

... More
Excavation

-

-

-

... More
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)

42013.99

-

-

... More
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting,trimming of slopes, stacking serviceable material for measurements within a lead of 100 m and disposal of unserviceable material with all lift and lead upto 1000 metres).

42013.99

-

-

... More
Excavation in Hard Rock (controlled blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading, stacking serviceable material for measurements within a lead of 100 m and disposal of cut road with in all lifts and leads upto 1000 metres )

56018.65

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)

-

-

-

... More
(i) Ordinary soil

-

-

-

... More
(B). Mechanical Means (Depth upto 3 m)

1102.25

-

-

... More
(ii) Ordinary rock (not requiring blasting)

-

-

-

... More
(B). Mechanical Means

2571.92

-

-

... More
Structures

-

-

-

... More
Dry rubble Flooring

431.61

-

-

... More
Sand Filling in Foundation Trenches as per Drawing & Technical Specification

115.77

-

-

... More
PCC 1:3:6 in Foundation including PCC below Pipe Culverts (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.) including necessary formwork, loading, unloading & transportation

262.1

-

-

... More
Plain/Reinforced cement concrete in open foundation complete including shuttering, loading, unloading & transportation, etc as per drawing and technical specifications

-

-

-

... More
(A). PCC Grade M15

163.68

-

-

... More
(B) RCC Grade M20 Using concrete mixer

258.3

-

-

... More
(C) PCC Grade M25

258.55

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications (incl. cutting, bending, shifting to site, tying and placing in position, loading, unloading, transportation, etc.)

50.92

-

-

... More
Gabian Structure for Retaining Earth (Providing and construction of a gabain structure for retaining earth with segments of wire crates of size as shown in construction drawings or as per site requirements, made from 4 mm galvanised steel wire @ 32 kg per 10 sqm having minimum tensile strength of 300 Mpa conforming to IS:280 and galvanizing coating conforming to IS:4826, woven into mesh with double twist, mesh size not exceeding 100 x 100 mm, filled with boulders with least dimension of 200 mm, all loose ends to be tied with 4 mm galvanised steel wire) including loading, unloading, transportation, etc.

3000

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications including loading, unloading & transportation, etc.. (A) Random Rubble Masonry

205.8

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications including loading, unloading, transportation, etc.

1670

-

-

... More
Providing & laying Plum Concrete with composition 60 % Boulder (max Size limited to 1/3 of section width or 450 mm whichever is less) and 40 % Cement Concrete (1:2:4 with 20mm down aggregate) including shuttering, compacting & curing complete as per drawing and technical specification including loading, unloading, transportation, etc.

3442.5

-

-

... More
Placing approved materials behind retaining wall, abutment, wing wall and return wall complete as per drawing and Technical specification including loading, unloading, transportation, etc using material obtained from excavation in road, drain, structures etc to meet requirement of table 300-2.

375

-

-

... More
Placing filter material over specified thickness behind retaining wall, abutment, wing wall and return wall complete as per drawing and Technical specification including loading, unloading, transportation, etc.

150

-

-

... More
Providing bamboo palisading of bamboo size- 75 mm to 100 mm dia, closely packed driven at least 60 cm below ground and 100 cm above ground on average including loading, unloading, transportation, fitting, fixing with jati or bethua bamboo kamies horizontally two rows with coir string etc. complete.

320

-

-

... More
Laying Reinforced Cement Concrete Pipe NP2/ prestressed concrete pipe on first class bedding in single row . (Laying Reinforced cement concrete pipe NP2/prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets including loading, unloading, transportation, etc.(a) 1000 mm dia

106.4

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications including loading, unloading, transportation, etc.

2037.61

-

-

... More
Neat cement punning including loading, unloading, transportation, etc.

1957.61

-

-

... More
Road Surfacing

-

-

-

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) including loading, unloading, transportation, etc.

1748.74

-

-

... More
Preparation and Surface Treatment of formation. (Preparation and surface treatment of formation by removing mud and slurry, watering to the extent needed to maintain the desired moisture content, trimming to the required line, grade, profile and rolling with 8-10 tonne smooth wheeled roller, complete as per clause 310.)

21049.6

-

-

... More
Granular Sub-Base with Well Graded Material (Table:- 400-1)

-

-

-

... More
B. By Mix in Place Method (Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) including loading, unloading, transportation, etc.

-

-

-

... More
i) for grading- I Material

3252.16

-

-

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.) including loading, unloading, transportation, etc.

3187.8

-

-

... More
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) including loading, unloading, transportation, etc.

-

-

-

... More
(ii) Ordinary Kilometer stone (Precast)

4

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.