NHPC Limited Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
NHPC Limited - NHPC Tender
Civil And Construction
Excavation
Eprocure
Opening Date17 Sep 2024
Closing Date25 Oct 2024
Tender Amount₹ 41,08,294
Costs
EMD
₹ 82,000Document Cost
₹ 590Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_NHPC_826331_1Tender No
NH/KHEP/PNC/NIT/2024/219Tender Authority
NHPC Limited ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Exploratory drifting work of RDR-2 extension of 55m (40plus15)m length (1.8 M X 2.1M) size at Right bank of Kamala river at Kamala HE Project, Tamen, Arunachal Pradesh
Exploratory drifting work of RDR-2 extension of 55m (40plus15)m length (1.8 M X 2.1M) size at Right bank of Kamala river at Kamala HE Project, Tamen, Arunachal Pradesh
Exploratory drifting work of RDR-2 extension of 55m (40plus15)m length (1.8 M X 2.1M) size at Right bank of Kamala river at Kamala HE Project, Tamen, Arunachal Pradesh
BOQ Items
Making Approach Path and Cutting of Steps in hilley terrain including cost of labour and T&P complete for 1.5 m wide path
2.5
-
-
Earth work in excavationin foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30cm size, lift upto 1.50 m amd stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
2.16
-
-
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth.
0.54
-
-
Random rubble masonry with hard stone in foundations and plinth in cement mortar 1 : 6 (1 cement : 6 fine sand) including levelling up with cement concrete 1 : 6 : 12 (1 cement :6 coarse sand : 12 stone aggregate 20 mm nominal size) at plinth level.
0.97
-
-
Extra for random rubble masonry with hard stone in superstructure above plinth level and upto floor two level including levelling up with cement concrete1:6:12(1cement :6coarsesand: 12 stone aggregate/shingle 20 mm nominal size) at window sills, ceiling level and the like.( cost of superstructure including cost of foundation and plinth)
2.76
-
-
Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.
0.72
-
-
Centring and shuttering including strutting proping etc. and removal of form work for Columns,pillars and piers.
4
-
-
Centring and shuttering including strutting,propping etc and removal of form work for Suspended floors, roofs, landings shelves and their supports, balconies and chjjas (3.5 m height).
3
-
-
Reinforcement cement concrete work in columns, pillars, piers,abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1: 3 (1 cement :3fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.
0.14
-
-
Reinforcement cement concrete work in columns, pillars, piers,abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1: 3 (1 cement :3fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement.
0.8
-
-
Reinforced cement concrete in suspended floors, roofs, landings and balconies upto floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand} of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
0.6
-
-
Reinforcement of RCC work including bending, binding and placing in position complete.
154
-
-
Removing mixed earth or rock slips including clearing the site within a lead of 50 m and upto 1.50 m lift.
Details of cost for 1 Cu.m
10
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements