Ministry Of Road Transport And Highways Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Ministry Of Road Transport And Highways - MORTH Tender
Eprocure
Opening Date5 Nov 2018
Closing Date4 Dec 2018
Tender Amount₹ 13,41,47,786 This is an estimated amount, exact amount may vary.
Costs
EMD
₹ 29,32,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Improvement Of Kanubari-rimpong Road (19 Km) (ph I- Km 0.00 To Km 3.00 ) Under Crf Scheme In Arunachal Pradesh.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_MoRTH_402854_1Bid Award Id
ViewTender No
KBD/DB-08/CRF/Agreement/18-19Tender Authority
Ministry Of Road Transport And Highways ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
SH:- EARTH WORK ( WIDENING) - 3 Km
-
-
-
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
57186.79
-
-
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
32167.57
-
-
[SH : 2.00 m span RCC slab culvert ] - 11 Nos.
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I) Ordinary soil
A) Manual Means
i) upto 3 m depth
3002.07
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
A) PCC Grade M15
441.65
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
B) PCC Grade M20
p) Height upto 5m
72.6
-
-
Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M25
C) Using Concrete Mixer
p)Height upto 5m
95.04
-
-
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
12.32
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
a) Square Rubble Coursed rubble masonry ( first sort )
1418.56
-
-
b)Random Rubble Masonry
394.24
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular material
443.08
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
396
-
-
(SH:- Retaining Wall 75.00 mtr. Length & 3.00 mtr. Height)
-
-
-
Excavation for structures ( Earth work in excavation of foundation of structures as per drawing and technically specification, including setting out, construction of shoing and bracing, removal of stumps and other deletenious matter, dressing of sides and bottom and backfilling with approved material)
I) Ordinary Soil
A) Manual means
ii) 3 mtr to 6 mtr depth
319.24
-
-
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
26.12
-
-
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.
A)Random Rubble Masonry
371.44
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
A) Granualar material
31.88
-
-
(Breast Wall for 53.00 mtr Length & 3 mtr. Height) for 1 m unit length
-
-
-
Excavation for structures ( Earth work in excavation of foundation of structures as per drawing and technically specification, including setting out, construction of shoing and bracing, removal of stumps and other deletenious matter, dressing of sides and bottom and backfilling with approved material)
I) Ordinary Soil
B) Mechanical means
i)Depth upto 3 m (with de-watering)
158.6
-
-
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
12.72
-
-
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.
B) Random Rubble Masonry
209.88
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
A) Granualar material
22.52
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (A) PCC Grade M 15
p) Height upto 5 m
20.99
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1 V:20 H towards drawing foce. Complete as per drawing and Technical
62
-
-
Pavement work (GSBC) - 3 Km
-
-
-
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
31500
-
-
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
31500
-
-
Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-I Material
3150
-
-
Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-II Material
3150
-
-
Pavement work (WMM ) - 3 Km
-
-
-
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
7875
-
-
Pavement work ( DBM ) - 3 Km
-
-
-
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
31500
-
-
Providing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
31500
-
-
Providing and laying Dense Graded Bituminous Macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects. For Grading II (19 mm nominal size)
1575
-
-
Pavement Work ( BC ) - 3 Km
-
-
-
Providing and laying Bituminous Concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects for Grading-II(10 mm nominal size)
787.5
-
-
Details of Cost for 3000 mtr length - C.C.Drain
-
-
-
Earth work in excavation of foundation of as per the drawing and technical specification, including setting out, construction of shoring and bracing, removal of slumps and other deletarious matter, dressing of sides and bottom and backfilling with approved material
I) Orinary Soil
A) Mannual Means (upto 3 m depth)
2100
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
450
-
-
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications (A)PCC Grade M15
900
-
-
Road Furniture work - 3 Km
-
-
-
Direction and Place Identification Signs upto 0.9 sqm Size Board. Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawing
18.22
-
-
Direction and Place Identification Signs with size more than 0.9 sqm size Board. Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing
6.84
-
-
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control
1170
-
-
Kilometre Stone Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc 1)5th kilometre stone (precast)
1
-
-
2)Ordinary kilometer stone (precast)
2
-
-
Metal Beam Crash Barrier Type - A, "W" : Metal Beam Crash Barrier Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 1.8 m high, 1.1 m below ground/road level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per clause 810
30
-
-
Road Markers/Road Stud with Lense Reflector Providing and fixing of road stud 100x 100 mm, die-cast in aluminium, resistant to corrosive effect of salt and grit, fitted with lense reflectors, installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth of 60 mm and bedded in a suitable bituminous grout or epoxy mortar, all as per BS 873 part 4:1973
900
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements