Indo Tibetan Border Police Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Indo Tibetan Border Police - ITBP Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date6 Nov 2020
Closing Date25 Nov 2020
Tender AmountRefer Documents
Costs
EMD
₹ 18,045Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2020_ITBP_595394_1Bid Award Id
ViewTender No
SHQLKB/ENGR/MANCHUKA-685Tender Authority
Indo Tibetan Border Police ViewPurchaser Address
-Website
http://https://www.itbpolice.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
13.58
4003
294.83
... More
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
3.34
56886
17032
... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.Foundations, footings, bases of columns, etc. for mass concrete.
33.89
28173
831.31
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars.
393.82
85065
216
... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement with 1:2:4(1 Cement :2 coarse sand : 4graded stone aggregate 20mm nominal size)
1.18
20097
17032
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
1.43
24355
17032
... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Lintels, beams, plinth beams, girders, bressumers and cantilevers.
17.7
14714
831.31
... More
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete. Columns, Pillars, Piers, Abutments, Posts and Struts.
24.84
20649
831.31
... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level Mild steel and Medium Tensile steel bars.
307.13
66340
216
... More
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with : Cement mortar 1:6 (1 cement : 6 coarse sand)
5.64
51814
9187
... More
Brick work with common burnt clay F.P.S (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in .
13.09
292862
22373
... More
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position- with First class local wood . First class local wood
1.23
100203
81466
... More
Providing corrugated G.S. sheet roofing including vertical/curved surface fixed with polymer coated J or L hooks,bolts and nuts 8mm diameter with bitumen and G.I limpet washers or with G.I limpet washers filled with white lead,including a coat of approved steel primer and two coats of approved paint on overlapping of sheets complete excluding the cost of purlins,rafters and trusses and including cutting to size and shape wherever required
73.1
75722
1035.87
... More
Providing ridges or hips of width 60 cm overall width 60 cm overall width plain G.S sheet fixed with polymer coated J or L hooks,bolts and nuts 8mm dia G.I limpet and bitumen washer complete: Ridges plain (500-600mm)
8.6
6711
780.46
... More
Providing and applying plastering on walls 12 mm thick of mix
83.7
34650
414
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements