Indian Army Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Indian Army - OSCC Tender
Civil And Construction
Civil Works Others
Real Estate Service
Eprocure
Opening Date14 Nov 2024
Closing Date27 Nov 2024
Tender Amount₹ 30,00,000
Costs
EMD
₹ 60,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ARMY_683987_1Tender No
522/OP SAD/2024/MKT SHEDTender Authority
Indian Army ViewPurchaser Address
-Website
http://https://www.indianarmy.nic.in/home
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Reinforced concrete work in foundations, footings, bases of mass concrete excluding cost of centering, shuttering and columns etc and reinforcement in : (a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20mm nominal size).
0.15
-
-
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3 (1 cement : 3 fine sand) of thickness not exceeding 6mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. (a)M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20mm nominal size).
0.6
-
-
Reinforced cement concrete work in lintels, beams and bresumers upto floor two level including finishing and plastering the exposed surface with cement mortar 1:3 (1 Cement : 3 fine sand) of thickness not exceeding 6mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. (a)M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20mm nominal size).
1.92
-
-
Centering and shuttering including strutting, propping etc and removal of form work for :
(a) Foundation, footings, bases of columns etc and mass concrete.
1.2
-
-
(b) Walls (any thickness) including attached pilasters, buttresses, plinth and string course etc.
22.4
-
-
(c) Column, pillars, posts and struts etc.
16.8
-
-
Reinforcement of RCC work including bending, binding and placing in position complete (a) Cold Twisted bars.
207.89
-
-
Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.
8
-
-
Half brick masonry (with best available local bricks) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth.
20
-
-
15mm cement plaster 1:3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
80
-
-
Providing best available local wood (Class – B II) work in frames of false celling, partitions and trusses etc, sawn and put up in position.
110.9
-
-
Providing corrugated GI sheet roofing fixed with galvanized iron J or L hooks, bolts & nuts 8mm dia with bitumen and GI Limpet washers or with GI limpet washers filled purlins, rafters and trusses with white lead complete, excluding the cost of (a) 0.63mm thick GI sheet.
48.6
-
-
Providing ridges or hips 60cm overall in plain GI sheet fixed with galvanized iron J or L hooks, bolts and nuts 8mm dia GI limpet and bitumen washers complete. (a) 0.63mm thick GI sheet.
9
-
-
25mm thick cement concrete flooring 1:2:4 (1 Cement : 2 coarse sand : 4 graded stone aggregate 12.5mm nominal size) finished with a floating coat of neat cement.
32
-
-
Providing and fixing of Perselono tiles (Johnson brand) in floor of 25mm thick cement mortar 1:3 joined with near cement slurry mixed with pigment to match the shade of tiles complete.
32
-
-
Finishing walls with water proofing cement paint of approved brand and manufacture and required shade on new work (three or more coats) to give an even shade.
6
-
-
Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work including priming coat of whiting to given and even shade.
80
-
-
Applying priming coat with ready mixed primer of approved brand and manufacture on steel work.
2.1
-
-
Steel work riveted or bolted in built up sections, trusses and framed work including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.
0.1
-
-
Painting one or more coats with superior quality ready mixed paint for steel work of approved brand and manufacture in all shades on new work to give an even shade.
2.1
-
-
Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade.
17
-
-
Carrying of cement, CGI sheet, M-S Rod from Silapathar to Yingkiong by Truck from a distance of 228 Km. I). Surfaced road.
2
-
-
Carrying of cement, CGI sheet, M-S Rod from Yingkiong to work site by Truck from a distance of 250 KM.II) Katcha Road.
2
-
-
Carrying of river bed material from quarry to work site by mechanical means (Truck) by covering distance of 68 Km.
(a) Sand
3.04
-
-
(b) Aggregate
3.2
-
-
Water Supply and Saitation
1
-
-
Provision for Electrification Installation @ 12.5% of Main Building
1
-
-
Adding 6% GST on
1
-
-
Add 1.5% Contingency
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%