Department Of Town Planning And Urban Local Bodies Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Department Of Town Planning And Urban Local Bodies Tender

Eprocure
Opening Date29 Sep 2020
Closing Date5 Oct 2020
Tender Amount₹ 19,52,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out,construction of shoring and bracing, removal of stumps and otherdeleterious matter, dressing of sides and bottom, backfilling the excavationearth to the extent required and utilising the remaining earth locally for road work.) A. Manual l Means (Depth upto 3 m)

40

-

-

... More
Granular Sub-base with Close Graded Material (Table:- 400-1)-APlant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ) (i) For grading- I Material 150mm thick, Drainage layer

90

-

-

... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with days, mixed in a batching plant, transported to site, laid with a paver with+B13 electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)

90

-

-

... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed,plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383,maximum size of coarse aggregate not exceeding 25 mm, mixed in abatching and mixing plant as per approved mix design, transported to site,laid with a fixed form or slip form paver, spread, compacted and finished ina continuous operation including provision of contraction, expansion,construction and longitudinal joints, joint filler, separation membrane,sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixturesas approved, curing compound, finishing to lines and grades as per drawing)

60

-

-

... More
Centring and shuttering including strutting proping etc. and removal of form work for:( a) Foundations and plinth.

48

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.