Department Of Hydro Power Development Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Department Of Hydro Power Development Tender
Civil And Construction
Eprocure
Opening Date25 Aug 2023
Closing Date18 Sep 2023
Tender AmountRefer Documents
Costs
EMD
₹ 96,822Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HPDAP_1373_1Tender No
AHPD/HPD/W-10/2023-24/448-52Tender Authority
Department Of Hydro Power Development ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
H.R.
516.33
-
-
... More
Earth work in excavation in foundation trenches not exceding 1.50M width or 10Sqm on plan or drains not exceeding 1.50M in width or 10SqM on Plan including dressing of sides and ramming of bottoms, lift upto 1.5M including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50M. 1.03a : HS
179.52
-
-
... More
O.R.
114.24
-
-
... More
H.R.
32.64
-
-
... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth
40.8
-
-
... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
76.8
-
-
... More
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses,plinth and string course, fillets etc from top of foundation up to floor two level including finishingand plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) ofthickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring,shuttering and reinforcement in a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
120
-
-
... More
Centring and shuttering including strutting, propping etc and removal of
form work for : 1.07a : Foundation, footings, bases of columns
etc. and mass concrete.
96
-
-
... More
Walls (any thickness) including attached pilasters, buttresses, plinth and string
courses etc.
1209.6
-
-
... More
Reinforcement of RCC work including bending, binding and placing in position
complete.Cold twisted bars.
14.1
-
-
... More
Providing and Supplying of Expansion
joints
27.6
-
-
... More
Spillway Channel 2.01Excavation in Soil with Dozer with lead upto
100 metres in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
739.2
-
-
... More
Excavation in Hard Rock (requiring blasting)
with disposal upto 1000 metres by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres
316.8
-
-
... More
Earth work in excavation in foundation and
trenches in soils containing 50% or more shingle or small size boulders upto 30 cm size, lift upto1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50 m.
105.6
-
-
... More
Re-filling excavated earth in foundations and
plinth etc. in 15 cm layer including ramming and watering etc. complete.
25.87
-
-
... More
Providing and laying cement concrete1:3:6 (1 cement : 3 coarses and : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: 2.05a) Foundations and plinth
15.84
-
-
... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering
and reinforcement in : 2.06a M20 (1 cement : 1.5 coarse sand : 3 stone
aggregate 20 mm nominal size).
31.68
-
-
... More
Reinforced cement concrete in walls (any
thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation upto floor two leve lincluding finishing and plastering then exposed surfaces with cement mortar 1:3 (1cement:3 finesand) of thickness not exceeding 6mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : 2.07a M20 (1 cement : 1.5 corase sand : 3 stone
aggregate 20 mm nominal size)
42.24
-
-
... More
Reinforcement of RCC work including
bending, binding and placing in position complete. 2.08a /TMT steel
3.85
-
-
... More
Centring and shuttering including strutting,
propping etc and removal of form work for : 2.09a Foundation, footings, bases of columns etc.and mass concrete.
52.8
-
-
... More
Walls (any thickness) including attached
pilasters, buttresses, plinth and string courses etc.
422.4
-
-
... More
Tail Race Channel 3.01 Earth work in excavation in foundation
and trenches in soils containing 50% or more shingle or small size boulders upto 30 cm size, lift upto1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed
within a lead of 50 m.
71.61
-
-
... More
Providing and laying cement concrete1:3:6 (1 cement : 3 coarses and : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: 3.02a a) Foundations and plinth
5.27
-
-
... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering
and reinforcement in : 3.3a M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).
8.68
-
-
... More
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation upto floor two leve lincluding finishing and plastering then exposed surfaces with cement mortar 1:3 (1cement:3 finesand) of thickness not exceeding 6mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in : 3.04a M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)
12.4
-
-
... More
Reinforcement of RCC work including bending, binding and placing in position
complete. 3.05 a) Tar/TMT Steel
1.17
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for : 3.06a)Foundation, footings, bases of
columns etc. and mass concrete.
18
-
-
... More
b) Walls (any thickness) including attached pilasters, buttresses, plinth
and string courses etc.
124
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements