Department Of Hydro Power Development Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Department Of Hydro Power Development Tender

Works
Eprocure
Opening Date5 Dec 2024
Closing Date11 Dec 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
b) Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness): (i) By Manual Means in area of thorny jungle

0.97

-

-

... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres)

12096

-

-

... More
Earth work in excavation in foundation trenches not exceeding 1.50 m width or 10 Sq.m. on plan or drains not exceeding 1.50 m in width or 10 Sq.m. on plan including dressing of sides and ramming of bottoms, lift upto 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
i) Ordinary Soil: a) Manual Means (Depth upto 3 m)

74.78

-

-

... More
ii) Ordinary Rock (not requiring blasting): a) Manual Means (Depth upto 3 m)

149.56

-

-

... More
iii) Hard Rock requiring blasting: a) Manual Means

523.44

-

-

... More
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth

90.29

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

461.67

-

-

... More
Centring and shuttering including strutting propping etc. and removal of form work for:

-

-

-

... More
a) Foundation, footings, bases of columns etc. and mass concrete.

1062.66

-

-

... More
Reinforcement for RCC work including bending binding and placing in position complete. a) Tar/TMT steel

24908.72

-

-

... More
SH-2: Forebay Tank

-

-

-

... More
Jungle clearance:

-

-

-

... More
a) Clearing Grass and Removal of Rubbish

0.17

-

-

... More
b) Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness): (i) By Manual Means in area of thorny jungle

0.17

-

-

... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres).

6003

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work).

-

-

-

... More
i) Ordinary Soil: a) Manual Means (Depth upto 3 m)

87.42

-

-

... More
ii) Ordinary Rock (not requiring blasting): a) Manual Means (Depth upto 3 m)

174.83

-

-

... More
iii) Hard Rock requiring blasting: a) Manual Means

611.92

-

-

... More
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth

30.9

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size).

28.56

-

-

... More
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses,plinth and string course, fillets etc from top of foundation up to floor two level including finishingand plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) ofthickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring,shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size).

40.95

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for :

-

-

-

... More
a) Foundation, footings, bases of columns etc. and mass concrete.

11.4

-

-

... More
d) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

409.5

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete: a) Tar/TMT steel

9581.79

-

-

... More
SH-3: Spillway Channel

-

-

-

... More
Jungle clearance:

-

-

-

... More
a) Clearing Grass and Removal of Rubbish

0.24

-

-

... More
b) Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness): (i) By Manual Means in area of thorny jungle

0.24

-

-

... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres).

3600

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)

-

-

-

... More
i) Ordinary Soil: a) Manual Means (Depth upto 3 m)

23.04

-

-

... More
ii) Ordinary Rock (not requiring blasting): a) Manual Means (Depth upto 3 m)

46.08

-

-

... More
iii) Hard Rock requiring blasting: a) Manual Means

161.28

-

-

... More
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth

28.8

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

23.4

-

-

... More
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses,plinth and string course, fillets etc from top of foundation up to floor two level including finishingand plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) ofthickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring,shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

32.4

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for :

-

-

-

... More
a) Foundation, footings, bases of columns etc. and mass concrete.

36

-

-

... More
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

432

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete: a) Tar/TMT steel

4896.78

-

-

... More
SH-4: Power House

-

-

-

... More
Jungle clearance:

-

-

-

... More
a) Clearing Grass and Removal of Rubbish

0.18

-

-

... More
b) Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness): (i) By Manual Means in area of thorny jungle

0.18

-

-

... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres).

6428.63

-

-

... More
Earth work in excavation in foundation trenches not exceeding 1.50 m width or 10 Sq.m. on plan or drains not exceeding 1.50 m in width or 10 Sq.m. on plan including dressing of sides and ramming of bottoms, lift upto 1.50 m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.

-

-

-

... More
i) Ordinary Soil: a) Manual Means (Depth upto 3 m)

33.51

-

-

... More
ii) Ordinary Rock (not requiring blasting): a) Manual Means (Depth upto 3 m)

67.02

-

-

... More
iii) Hard Rock requiring blasting: a) Manual Means

234.57

-

-

... More
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth.

63.1

-

-

... More
Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth.

75.15

-

-

... More
Providing and laying damp proof course 50 mm thick with cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 stone aggregate 20 mm nominal size).

545.64

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

24.07

-

-

... More
Reinforcement cement concrete work in columns, pillars, piers, abutments, post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).

2.97

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for :

-

-

-

... More
a) Foundation, footings, bases of columns etc. and mass concrete.

258.84

-

-

... More
b) Column, pillars, posts and struts etc.

39.6

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete: a) Tar/TMT steel

4201.68

-

-

... More
Filling in plinth with sand under floors including watering,ramming,consolidating and dressing complete.

281.25

-

-

... More
Cement concrete flooring 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) finished with a floating coat of neat cement: a) 40 mm thick.

56.25

-

-

... More
25 mm thick wooden plank walling butt jointed with wooden beading 50 x 25 mm including supplying and fixing with necessary nails, screws etc complete.

210.08

-

-

... More
Providing approved best available local wood (Class - B II) work in frames of doors, windows clerestory windows and other frames, wrought framed and fixed in position.

1143.93

-

-

... More
Providing and fixing panelled, glazed or panelled and glazed shutters for doors, windows and clerestory windows including aluminium butt hinges with necessary screws.

-

-

-

... More
a) 38mm thick best available local wood class - B I.

13.92

-

-

... More
Providing corrugated G.I.sheet roofing fixed with galvanised iron J or L hooks, bolts & nuts 8 mm dia with bitumen and G.I. limpet washers or with G.I. limpet washers filled with white lead complete, excluding the cost of purlins, rafters and trusses: a) 0.80 mm thick GI sheet.

688.5

-

-

... More
Providing ridges or hips 60 cm overall in plain G.I. sheet fixed with galvanised iron J or L hooks, bolts and nuts 8 mm dia. G.I. limpet and bitumen washers complete: b) 0.80 mm thick GI sheet.

61

-

-

... More
Providing and fixing 20 mm thick wooden planks ceiling (frame work for base to be paid separately) with M.S. screws: a) Timber Plank Class - A IV.

375

-

-

... More
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint: c) In Flats up to 10 mm in thickness.

2.03

-

-

... More
Providing and fixing bolts above 300 mm in length including nuts and washers complete.

1.5

-

-

... More
Providing and fixing MS grills of required pattern in wooden frames of windows etc with MS flat, square or round bars with round headed bolts and nuts or by screws: b) Ornamental grill.

228

-

-

... More
12 mm cement plaster 1 : 4 (1cement : 4 fine sand).

48

-

-

... More
White washing with lime on new work ( two or more coats) to give an even shade.

48

-

-

... More
Applying priming coat with ready mixed pink primer of approved brand and manufacture on wood work complete.

554.68

-

-

... More
Painting two or more coats (excluding priming coat) with superior ready mixed paint for wood work of approved brand and manufacture in all shades on new work to give an even shade.

554.68

-

-

... More
Painting one coat with oil type wood preservative of approved brand and manufacture on old work.

554.68

-

-

... More
Making plinth protection 50 mm thick of cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 stone aggregate using 20 mm nominal size) over 75 mm bed of stone ballast 40 mm nominal size well rammed and consolidated and grouted with fine sand including finsihing the top smooth.

75.24

-

-

... More
Construction of cement concrete drain 15 cm wide and 15 cm deep in cement concrete 1 : 3 : 6 (1 cement : 3 sand : 6 hard graded stone chips or shingle 40 mm and down gauge) 8 cm thick on sides and bottom and plastering and all exposed surfaces with 12 mm thick cement mortar 1 : 3 (1 cement : 3 coarse sand) including shuttering complete.

83.6

-

-

... More
Providing and fixing MS sliding door bolts, bright finished or and black enamelled with nuts and screws etc complete.

-

-

-

... More
a) 300 x 16 mm

2

-

-

... More
Providing and fixing MS tower bolts (barrel type) with necessary screws etc complete.

-

-

-

... More
b) 200 x 10 mm

6

-

-

... More
c) 150 x 10 mm

6

-

-

... More
Providing and fixing MS handles with necessary screws etc complete.

-

-

-

... More
a) 125 mm

2

-

-

... More
b) 100 mm

6

-

-

... More
Steel work in built up tubular trusses including cutting, hoisting,fixing in position and applying a prime coat of approved steel primer welded and bolted including special shaped washers etc complete ( welding to be paid separately).

3740

-

-

... More
Extra fo brick work with best available local bricks in superstructure above plinth level and up to floor two level.

681.16

-

-

... More
SH-5: Tail Race Channel

-

-

-

... More
Jungle clearance:

-

-

-

... More
a) Clearing Grass and Removal of Rubbish

0.08

-

-

... More
b) Clearing and Grubbing Road Land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness): (i) By Manual Means in area of thorny jungle

0.08

-

-

... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres (Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres).

1376

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work)

-

-

-

... More
i) Ordinary Soil: a) Manual Means (Depth upto 3 m)

11.44

-

-

... More
ii) Ordinary Rock (not requiring blasting): a) Manual Means (Depth upto 3 m)

22.88

-

-

... More
iii) Hard Rock requiring blasting: a) Manual Means

80.08

-

-

... More
Providing and laying cement concrete 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth.

15.6

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

15.6

-

-

... More
Reinforced cement concrete in walls (any thickness) including attached pilasters, buttresses,plinth and string course, fillets etc from top of foundation up to floor two level including finishingand plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) ofthickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring,shuttering and reinforcement in : a) M20 (1 cement : 1.5 corase sand : 3 stone aggregate 20 mm nominal size)

166.4

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for :

-

-

-

... More
a) Foundation, footings, bases of columns etc. and mass concrete.

24

-

-

... More
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

256

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete: a) Tar/TMT steel

1238.79

-

-

... More
SH-6: Cartage of Engineering Materials

-

-

-

... More
Cartage of Engineering materials such as cement, steel etc. by means of mechanical transportation upto project site including loading & unloading.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.