Department Of Hydro Power Development Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Department Of Hydro Power Development - HPDAP Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 May 2023
Closing Date16 May 2023
Tender AmountRefer Documents
Costs
EMD
₹ 2,46,000Document Cost
₹ 1,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_HPDAP_1262_1Tender No
BHPD-II/Tender-01/2023-24/41Tender Authority
Department Of Hydro Power Development ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
b) Ordinary Rock
483.84
-
-
... More
c) Hard Rock requiring blasting
1451.52
-
-
... More
Earth work inexcavation in foundation trenches not exceeding 1.5m in width or 10 sqm on plan or drains not exceeding 1.5m in width or 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m.
-
-
-
... More
a) Hard Soil
136.54
-
-
... More
b) Ordinary Rock
136.54
-
-
... More
c) Hard Rock requiring blasting
409.63
-
-
... More
Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in foundation and plinth.
80
-
-
... More
Reinforced cement concrete work in foundations, footings, bases of columns etc. and mass concrete excluding the cost of centring,shuttering and reinforcement in:-
-
-
-
... More
a) 1 :11/2:3
45
-
-
... More
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :
-
-
-
... More
a) 1 : 1.5 : 3 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)
123
-
-
... More
Centring and shuttering including strutting propping etc. and removal of form work for,
-
-
-
... More
a) Foundation, footings
100
-
-
... More
b) Walls etc.
1250
-
-
... More
Reinforcement for RCC work including bending binding and placing in position complete.
-
-
-
... More
a) Cold twisted bars.
6720
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements