Bharat Sanchar Nigam Limited Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Bharat Sanchar Nigam Limited - BSNL Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date15 Feb 2022
Closing Date22 Feb 2022
Tender Amount₹ 12,22,008 
Notes
Download

Costs

Summary

C/o 21 M Marr Tower And Chain Link Fencing For Mini Link

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :

-

-

-

... More
1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

1.8

-

-

... More
1:5:10 (1 cement : 5 coarse sand(zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources)

1

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

35

-

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

6.7

-

-

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.

-

-

-

... More
Thermo-Mechanically Treated bars of grade Fe-500D or more.

350

-

-

... More
Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand).

30

-

-

... More
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).

-

-

-

... More
All works upto plinth level

12.9

-

-

... More
All works above plinth level upto floor V level

0.6

-

-

... More
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.

-

-

-

... More
In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works.

89

-

-

... More
Painting with synthetic enamel paint of approved brand and manufacture to give an even shade :

-

-

-

... More
Two or more coats on new work.

10

-

-

... More
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.

-

-

-

... More
Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix)

12

-

-

... More
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.

222

-

-

... More
Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-in-charge.

-

-

-

... More
Made of G.I. wire of dia 4 mm

85

-

-

... More
Carriage of tower materials by mechanical transport including sorting of materials as requirement for the tower as per direction of Engineer-in- Charge within 50 km from concerned store to site of work ( note;- weight of tower including templates and anchor bolts approximately 650.00 kgs)

-

-

-

... More
Upto 50 km

3

-

-

... More
Painting with High gloss synthetic enamel paint of approved brand and manufacture to give an even shade for 21 m MARR tower (weight about 0.650MT). a) Two or more coats .

2

-

-

... More
Dismantling of MAAR tower upto 15 m height, placing of all members and nut bolts in countable position as per direction of Engineer in charge.

3

-

-

... More
Erection of 21 m MARR twin tower including assembling, lifting and fixing in position with the help of nuts and bolts or as directed by Engineer in Charge keeping the verticalty of the erected tower on all sides within +25 mm taking all precautions against the damage accidents, obtaining necessary insurance against all risks etc. complete as per direction of Engineer in -Charge.( Note: Tower materials in parts will be supplied by the department free of cost and shall be available within 50 km leads ).

2

-

-

... More
Extra carrying charges for lifting construction materials from the stacking place which is the last motorable point to the working site by manual labour etc complete as per direction of Engineer-in- Charge. ( Note;- Rate for 300 m lead of 100 m with vertical lift)

-

-

-

... More
Cement

122

-

-

... More
Steel

665

-

-

... More
Aggregate and sand

14

-

-

... More
Tower Materials 0.650MT ( Approximately)

3

-

-

... More
GI Chain link fencing

85

-

-

... More
Water

6660

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.