Yogi Vemana University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Yogi Vemana University Tender

Building Construction
Opening Date30 Sep 2020
Closing Date19 Oct 2020
Tender Amount₹ 48,46,430 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402). Lintels (UPTO 3.66 m) Second Floor

2.27

-

27170

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Roof Beams (UPTO 3.66 m) Second Floor.

12.95

-

130704

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 125mm thick un supported height up to 3.66 m Second Floor

300

-

364200

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 150mm thick un supported height up to 3.66 m Second Floor

12.6

-

17224

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Staircase Waist Slabs 175mm thick un supported height up to 3.66 m Third Floor

7.4

-

11773

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for 0.6m wide Chajja to Second Floor.

60.3

-

31356

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 225mm x 100mm x 60mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504) for Second Floor.

60.4

-

507239

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 225mm x 100mm x 60mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504) for Third Floor.

36.25

-

317731

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 225mm x 100mm x 70mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509) for Second Floor.

119

-

125783

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126) for Second Floor.

11

-

687588

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Ornamental ceiling plastering 12mm thick single coat in CM (1:6) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for Second Floor.

340

-

131920

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for Second Floor.

645

-

314760

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for Third Floor.

295

-

156055

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work .(SS 901,903 & 904 for Second Floor.

460

-

231380

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work .(SS 901,903 & 904 for Third Floor.

330

-

179190

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Reinforced cement concrete (1:5:10) proportion (Cement: fine aggregates: coarse aggregate) using 40mm size (SS5) hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including centering using Casurina Ballies , Bamboos , Wooden Reapers , Runners , Wood Posts , Wall Plates etc., shuttering, machine mixing, laying concrete, lifting concrete manually , curing etc., and overheads & contractors profit complete as per drawings but excluding cost of steel and it's fabrication charges for finished item of work (APSS NO. 402 & 403) for Third Floor to Dummy Columns.

4.5

-

43164

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) for Second Floor.

480

-

838080

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing skirting to internal walls to 10 cm height with 8mm thick mirror polished granite tiles length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete including seigniorage charges etc., complete for finished item of work.(APSS No.701 &707) for First Floor.

350

-

61250

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing 16 mm to 18 mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges, cost of base coat and overheads & contractors profit complete for finished item of work for treads to Second Floor(S.S.701 & special)

10.1

-

51985

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing 16 mm to 18 mm thick high polished granite stone slabs other than black and regular colours (i.e. of shades like paradiso / bala flower / copper silk / laka red / lavender blue) with borders and design as per the pattern approved by the Engineer-in-Charge of length not less than 2.43 mts set over base coat of cement mortar (1:5) , 12mm thick using screened sand over CC bed already laid or RCC roof slab including neat grey cement slurry of honey like consistency spread @ 3.3 Kg per sqm and jointed neatly with white cement paste mixed with pigment of matching shade to full depth including cost and conveyance of all materials like cement , sand , water , granite slabs etc., to work site and all operational, incidental labour & lift charges, half rounding the edges of treads , polishing charges, cost of base coat and overheads & contractors profit complete for finished item of work for risers to Second Floor(S.S.701 & special)

4.25

-

15028

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328).

30

-

8160

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work but excluding conveyance of materials in all floors for Third Floor.

1150

-

44850

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply & application of one coat deco orient base & two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc.,and overheads & contractors profit complete for finished item of work in all floors in Third Floor.

645

-

105780

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc.and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.

36

-

6804

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing and fixing door frames fabricated from sections made of Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) nd profile size of 105 x 60 mm conforming to IS 4351 - 2003 including pretreatment, Galvanized as per IS:277, zinc phosphating finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powder coating paint thickness 60 ? 65 microns(Dry film thickness)Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and double shutter doors Mild Steel Hallow single rebate general purpose door frames

152

-

106856

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of doors shutter as per approved drawings and Flush door shutters, solid bond wood block board type withcommercial ply on both faces.: 35 mmthick conforming to IS:2202 single shutter including cost and conveyance to site of Door frame, flush shutter including supply and fixing of ISI marked aluminium fixtures , 1 No. aldrop 300mm x 16 mm dia, 2 No tower bolt of 300 mm x 12 mm dia at top, 2 Nos. 150mm long handles, 1 Nos heavy duty door stopper and 1 No rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including complete for finished item of work as per APSS 1001 & 1002 for All Floors

18.45

-

49483

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for glazed shutters, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch including overheads and contractor profit etc., complete for finished item of work for Double shutter window 1200x1800 with fixed fan light of 500mm at top all floors.

17.5

-

107083

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for 50mm thick Racks to Second Floor.

72

-

36432

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Reinforced Cement Concrete M 20 design mix using 12mm size hard granite machine crushed graded metal (Coarse aggregate) ( consisting of nominal size metal 60% of 13.20/12.50mm , 20% of 10mm and 20% of 6mm ) from approved quarry, using a minimum quantity of 350 kgs. of cement per 1 cum of concrete using WEIGH BATCHER / MIXER including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, water etc., to site and cost of seigniorage charges on all materials including steel centering, shuttering, labour charges such as weigh batching, machine mixing, laying concrete, lift charges, curing etc., and overheads & contractors profit complete for finished item of work (APSS No. 402 & 403) for 25mm thick Racks to Second Floor.

55

-

13915

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supplying and fixing of MS Grill to windows / in open court yards using 45x45X 5mm MS L angle alround and 10mm MS square bars horizontally at 2Nos and vertically at 75mm centre to centre including fixing with 4 Nos of MS Z holdfasts (2 on each side) duly making cutting brick masonry, fixing and making to original surface neatly and painting grill with one coat of red oxide primer including cost all taxes and conveyance of all materials including cutting, bending, welding including all operational charges and all labour charges etc., complete for finished item of work for Second Floor.

40.2

-

55597

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;supply and fixing of 25mm dia 2 mm thick ISI Marked concealed PVC pipe with all accessories fixing in roof slab with all required accessories including masonary work and all labour charges etc complete for run of mains etc (Sudhakar/Modi/Mercury) (1.4.2.a)

350

-

23450

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;supply and fixing of 25mm dia 1.5mm thick ISI Marked concealed in wall PVC pipe with all accessories including masonary work and all labour charges etc complete for run of mains etc (Sudhakar/Modi/Mercury)(1.4.2.b)

90

-

5850

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) of in existing pipe with 6A switch, Ceiling rose/BH/SBH of Modular switches with cover plate including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

85

-

46155

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control of common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. makes Anchor / Gold Medal Olive / Million Zoom .

18

-

3024

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Wiring with 2 of 22/0.3mm (1.5 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete. Make:GM / L&T / RPG / Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard / Milion makes of switches:- Anchor / Gold Medal Olive / Million Zoom .

36

-

18936

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and run of 2 of ISI marked 2.5 (36/0.3mm) sqmm FR PVC insulated flexible copper cable for phases and run of 1 of 1.5sqmm (22/0.3mm) copper cable for earth laid in the existing PVC pipe for run of mains to the circuits including all labour charges etc (L&T / Finolex/Havells make ) ((3.1.4)

275

-

24475

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and run of 4 of ISI marked 6sqmm FR PVC insulated flexible copper cable along with one of run of 4sqmm FR PVC insulated flexible copper cable for earth laid in the existing PVC pipe for mains including all labour charges etc. from main panel to floor DBs.

40

-

12240

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of 3 phase 4 way TPN Distribution board with IP-20 protection (Metal Door) suitable for 3 phase 4 way with 63A, 4 Pole Isolator as incomer and 10kA , 6-32A SP MCBs -12Nos as outing going including internal connection and labour charges for surface / flush mounting etc., complete.MDS make

1

-

5935

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply, Installation, testing and commissioning only of 48" (1200mm) sweep 230v, 50Hz, 1 phase, 3 blades and double ball bearings ceiling fans without regulators including all mounting accessories as required ( Crompton make High speed)

18

-

43488

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of 1200 mm length,Box type powder coated tube light luminaire with necessary wiring suitable for fixing 1 No retrofit LED tube but without tube and choke Makes:as required etc., for complte.

28

-

8484

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 5w LED Lamp (for new installation).(Data No. 16-17;14.1.1

9

-

1710

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm (Data No. 16-17;23.1.3)

18

-

7416

... More
Construction of Nine rooms (balance work) in the second floor of the existing Ladies hostel;Supply and fixing of fan hook in RCC slab of 12/15mm dia MS Rod while laying the slab. (Data No.16-17;23.1.9 )

18

-

2232



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.