Yogi Vemana University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Yogi Vemana University Tender

Opening Date22 Dec 2021
Closing Date27 Dec 2021
Tender Amount₹ 8,58,583 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Repair and Renovation of Staff Quarters;Plastering 12mm thick single coat in CM(1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) - for old walls - Second Floor

17

-

7820

... More
Repair and Renovation of Staff Quarters;Flooring with non-skid red or white full body Ceramic floor tiles of size 300 mm x 300 mm / 400mm x 400mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) - Ground Floor

78.5

-

76223.5

... More
Repair and Renovation of Staff Quarters;Flooring with non-skid red or white full body Ceramic floor tiles of size 300 mm x 300 mm / 400mm x 400mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) - First Floor

74.5

-

75841

... More
Repair and Renovation of Staff Quarters;Flooring with non-skid red or white full body Ceramic floor tiles of size 300 mm x 300 mm / 400mm x 400mm and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) - Second Floor

66

-

70356

... More
Repair and Renovation of Staff Quarters;Providing skirting to internal walls to 12.5 cm height with non-skid red or white full body ceramic floor tiles of thickness between 7-8 mm 1st quality of any colour and finish in all shades and designs as approved by Engineer-in-charge, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water, overheads & contractors profit complete for finished item of work.(APSS No.701 &707) - Ground Floor

84

-

5292

... More
Repair and Renovation of Staff Quarters;Providing skirting to internal walls to 12.5 cm height with non-skid red or white full body ceramic floor tiles of thickness between 7-8 mm 1st quality of any colour and finish in all shades and designs as approved by Engineer-in-charge, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water, overheads & contractors profit complete for finished item of work.(APSS No.701 &707) - First Floor

102

-

6936

... More
Repair and Renovation of Staff Quarters;Providing skirting to internal walls to 12.5 cm height with non-skid red or white full body ceramic floor tiles of thickness between 7-8 mm 1st quality of any colour and finish in all shades and designs as approved by Engineer-in-charge, length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water, overheads & contractors profit complete for finished item of work.(APSS No.701 &707) - Second Floor

65

-

4745

... More
Repair and Renovation of Staff Quarters;Painting to old walls with two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls as approved by Engineer-In-Charge, to give an even shade after thourughly brushing the old surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., and overheads & contractors profit complete for finished item of work as per APSS 911 for internal walls in all floors.

3661

-

358778

... More
Repair and Renovation of Staff Quarters;Providing and fixing of SINGLE SIDE PRELAM SOLID PANEL PVC DOOR FRAME (CHOUKHAT): Providing and fixing factory made Pac single side Prelam door frame of the size 50X47 mm with a wall thickness of 5mm, made out of extruded 5mm rigid Pac single side prelam sheet, meter cut at two corners and joined with 2nos. of 150mm long brackets of 1515mm MS.Square tube. The two vertical door profiles are to be reinforced with 19X19mm MS. square tube of 19guage. The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-in-charge.

22

-

8250

... More
Repair and Renovation of Staff Quarters;Providing and fixing 30mm thick BRAND FACTORY MADE SOLID SINGLE SIDE PRELAM PANEL PVC DOOR SHUTTER consisting of frame made out of MS. Tubes of 19gauge thickness and size of 19mmX19mm for stiles, and 15mmX15mm for top and bottom rails. The MS. Frame shall have a coat of steel primers of approved make and manufacture. MS. Frame covered with 5mm thick heat moulded single side Prelam Pac ?C? channel of size 30mmX50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS. Frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the ack(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading ) using 2nos. 15mm wide X 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ?C? channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc. complete manufacture specification and drawing. including Aluminium tower bolt 200mm long,butt hinges 150mm, aldrop 300mm long , handle 150mm long , door stopper, etc., for finished item of work

6.3

-

15731.1

... More
Repair and Renovation of Staff Quarters;Supplying and fixing of MS Grill with Door using 40mm x 10mm MS flat and 25mm x 10mm MS flat alround and 10mm MS square bars horizontally and vertically at 75mm centre to centre including fixing with 6 Nos of MS hinges (3 on each side) duly making cutting brick masonry, fixing and making to original surface neatly including cost and conveyance of all materials, cutting, bending, welding, operational charges, labour charges, overheads and contractor profit etc., complete for finished item of work.

4.15

-

11220.52

... More
Repair and Renovation of Staff Quarters;Painting two coats with synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre over primer coat of red oxide to new iron work including cost and conveyance of all materials to site, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in all floors. (SS No. 1201, 1212 & 1207).

4.15

-

734.48

... More
Repair and Renovation of Staff Quarters;Formation of approach road with useful available material by mechanical means including pre-watering of soil, removal of top soil, excavation of soils, depositing the soils at distance, spreading with available material, sectioning , consolidation with Roller , including all hire and operational charges of T&P Complete for finished item of work

119.76

-

16886.16

... More
Repair and Renovation of Staff Quarters;Filling with carted gravel in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick,watering and ramming including cost and conveyance of water to work site and all peraitonal,incidental, labour charges,hire charges of T&P etc., and overheads & contractors profit complete for fnished item of work(APSS NO.309&310)

29.94

-

12275.4

... More
Repair and Renovation of Staff Quarters;Labour charges for wrought and put up including fixing in position frames of any size, shutters for doors, windows, ventilators including fixing all necessary fixtures etc. for Teak wood Windows panelled including outer frame and shutter frame for all floors.

18.15

-

13303.95

... More
Repair and Renovation of Staff Quarters;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap, ISI marked and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, angle stop cock 12.70mm dia. first quality Indian make heavy duty, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges, overheads & contractors profit etc., complete for finished item of work.

4

-

18040

... More
Repair and Renovation of Staff Quarters;Supplying and fixing European Water Closet of 1st quality conforming to IS:2556-Part-2-1973 of white glazed with 'S' trap,supplying and fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996 and 10 litres capacity single flush PVC low level cistern with internal components and fixed using required size of nails and screws, angle stop cock 12.70mm dia. first quality Indian make heavy duty, 12mm PVC connections with brass union nuts CP coated including cost and conveyance of all materials to site, overheads & contractors profit etc., complete for finished item of work for all floors.

6

-

31626

... More
Repair and Renovation of Staff Quarters;Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit complete for finished item of work for all floors.

2

-

2830

... More
Repair and Renovation of Staff Quarters;Supply & Fixing of Bibcock cum Health Faucet with 1m long tube and wall hook including cost and conveyance of materials to site and all labour charges etc., complete for finished item of work

12

-

8856

... More
Repair and Renovation of Staff Quarters;Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

18

-

4788

... More
Repair and Renovation of Staff Quarters;Constructing 904.0 mm (3?0?) dia brick masonry inspection chamber as per IS - 4111: Part-1:1986 with cement mortar (1:6) prop using 2nd Class Clay Bricks of 225 mm thick from approved source having a minimum crushing strength of 5 N/sq.mm including plastering with cement mortar 1:3 prop; ½? thick both inside and outside fitted with 20? dia RCC manhole covers and frames including excavating pits up to a depth of 904 mm (3'-0") in all sorts of soils (exculding rock) and laying cement conrete (1:4:8) 150 mm thick using 40 mm HBG Metal and P.C.C. 1:2:4 benching and channel 100 mm thick as per Standard specification and including cost and conveyance of all materials like cement, sand, bricks, water etc., to site and all incidental and operational, labour charges like mixing cement mortar, constructing masonry, lift charges, curing , overheads & contractors profit etc., complete for finished item of work as per Standard specification.

2

-

13140

... More
Repair and Renovation of Staff Quarters;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

8

-

1152

... More
Repair and Renovation of Staff Quarters;Supplying and fixing 12.7 mm PVC connection with brass union nut C.P coated for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

12

-

1224

... More
Repair and Renovation of Staff Quarters;Supplying and fixing Gunmetal Gate ( GM peet ) valve as per IS-778 Class - I , Indian make heavy type including cost and conveyance of all materials , labour charges , overheads & contractors profit complete for finished item of work.

2

-

2502

... More
Repair and Renovation of Staff Quarters;Supply and fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings SDR 11 to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" to 2") for hot and cold water (IS 15778:2007) including cost and conveyance of all materials to site, labour charges for fixing, overheads & contractors profit complete for finished item of work at all floor levels - 28.60mm OD

86.78

-

14926.16

... More
Repair and Renovation of Staff Quarters;Supplying and fixing of 75 mm dia PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels.

60.1

-

10637.7

... More
Repair and Renovation of Staff Quarters;Supplying and fixing of 110mm dia PVC pipes (Prince/Sudhakar/Kisan/Supreme or any ISI brand) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels.

41.2

-

10464.8

... More
Repair and Renovation of Staff Quarters;Supply and Fixing of PVC low level systemwith internal components & short bend:10 Litres capacity Single Flush including cost and conveyance of all materials to site and all labour charges etc., complete for finished item of work

7

-

10451

... More
Repair and Renovation of Staff Quarters;Supply and Fixing of angle stop cock 12.7 mm dial first quality Indian Make heavy -duty including cost and conveyance of all materials to the site and all labour charges etc., complete for finished item of work

7

-

3402

... More
Repair and Renovation of Staff Quarters;Supplying and Fixing best Indian make plastic seat and lid for European water closets with rubber or plastic Buffers as per IS 2548-1996

7

-

6384



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.