Yogi Vemana University Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Yogi Vemana University Tender

Building Construction
Opening Date30 Sep 2020
Closing Date19 Oct 2020
Tender Amount₹ 80,90,655 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 125mm thick un supported height up to 3.66 m First floor

285

-

333165

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit etc., complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) Slabs 150mm thick un supported height up to 3.66 m First floor

315

-

414855

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 225mm x 100mm x 60mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504) for First Floor.

130

-

1043900

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Masonry work in CM(1:6) prop (Cement : Screened sand) in superstructure with fly ash cement / lime solid blocks of size 225mm x 100mm x 60mm from approved source having minimum crushing strength of 50 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials and such as labour charges, like mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, overheads and contrctor profit etc., complete for finished item of work. (APSS No. 501 & 504) for Second Floor.

41

-

344318

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Reinforced Masonry for partition walls (100 mm thick) in CM (1:4) prop. (Cement : Screened sand) using fly ash cement / lime solid blocks of size 225mm x 100mm x 70mm having minimum compressive strength of 50 Kg/Sq.cmand placing 2 Nos. of 6mm M.S plain rods in every third layer with free ends of the reinforcement pegged into mortar joints of main brick walls where applicable including cost and conveyance of all materials like cement, steel, sand, bricks, water etc., to site, including seigniorage charges, sales & other taxes on all materials, all operational, incidental charges such as labour charges for mixing cement mortar, scaffolding charges, constructing masonry, lift charges, curing, etc., and overheads & contractors profit but excluding cost of steel and its fabrication charges complete for finished item of work. (APSS No. of 509) for First Floor.

600

-

592200

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Plain Cement Concrete (1:3:6) nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm, 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate(sand), coarse aggregate, water etc. to site, including seigniorage charges, sales & other taxes on all materials and including all charges for mixing, laying concrete in position, curing etc., & lift charges , and overheads & contractors profit for Bed Blocks & Hold Fasts for finished item of work. (APSS No. 402) for Bed Blocks First Floor.

5.15

-

25137

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and placing of the Design Mix Concrete M 25 grade corresponding to IS 456 with minimum cement content of 380 kgs per 1 cum of concrete using WEIGH BATCHER / MIXER with 20mm size graded machine crushed hard granite metal (coarse aggregate) (consisting of nominal size metal 60% of 20mm, 15% of 13.20/12.50mm , 15% of 10mm and 10% of 6mm) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials, centering using Casurina Ballies, Bamboos, Wooden Reapers, Runners, Wood Posts, Wall Plates etc., for 60cm wide sun-shades 7.5cm thick at fixed end and 5cm thick at free end with an average thickness of 6.25cm including all operational, incidental and labour charges such as weigh batching, machine mixing, lifting of concrete manually, laying concrete, curing, overheads & contractors profit complete etc., but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402, 403 & 903) for Sunshades or Chajjas to First Floor.

72

-

35784

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing Thermo Mechanically Treated (TMT) (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc. ,and overheads & contractors profit complete for finished item of work.( APSS No.126) for First Floor.

18

-

1101744

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Ornamental ceiling plastering 12mm thick single coat in CM (1:5) using screened sand including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, curing as directed by Engineer-in-charge etc., and overheads & contractors profit complete for finished item of work.(SS 901,903 & 904) for First Floor.

865

-

305345

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Plastering 12mm thick in two coats using screened sand with base coat of 8mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer - in - charge etc., and overheads & contractors profit complete for finished item of work. (SS 901,903 & 904) for First Floor.

1215

-

544320

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work .(SS 901,903 & 904 for First Floor.

525

-

242550

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Plastering 20mm thick in two coats with base coat of 16mm thick in CM(1:6) and top coat of 4mm thick in CM(1:4) with dubara sponge finishing including cost and conveyance of all materials like cement, sand, water etc., to site, including seigniorage charges, sales & other taxes on all materials, and all operational, incidental charges on materials and including cost of all labour charges for mixing mortar, finishing, scaffolding, lift charges, curing, including cutting grooves as directed by Engineer-in-charge etc., and Overheads & Contractors profit complete for finished item of work .(SS 901,903 & 904 for Second Floor.

195

-

98085

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing impervious coat to exposed RCC roof slab surfaces of sump , sump side wall,sump bottom slab,in side of septic tank , in sunken slabs etc. to required slopes with CM (1:3) prop. using screened sand 12mm thick mixed with integral cement water proofing liquid confirming to IS: 2645-2003 manufactured by reputed manufacturers as approved by Engineer-in-charge at 1 Kg per one bag of cement, laid over roof slab when it is green, finished smooth with a floating coat of neat cement and thread lining at regular intervals of 45cmx45cm where ever necessary including cost and conveyance of all materials like cement, sand, water proofing compound, water etc., to site, including sales & other taxes on all materials and operational, incidental, and labour charges for mixing mortar, laying, lift charges, rendering smooth and thread lining, curing including rounding off junctions of wall and slab etc., and overheads & contractors profit complete for finished item of work. (APSS No. 901 & 903) for Sunken Slab to First Floor.

90

-

30690

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Flooring with ceramic tiles 7.30mm thick , 1st quality and of size not less than 300mm x 300mm as approved by Engineer-in-charge, set over base coat of cement mortar (1:8), 12mm thick using screened sand over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3 Kgs per Sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, screened sand , water and tiles etc., and overheads & contractors profit complete including seigniorage charges etc., complete for finished item of work (in toilets). (APSS No.701 & 707) for First Floor.

95

-

88255

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Flooring with granite stone tiles 8mm thick (mirror polished of all shades) of 1st quality and of size as approved by Engineer-in-charge with borders and design as per the approved flooring pattern as directed by the Engineer-In -Charge, laying tiles using spacers of 2mm thick, set over a base coat of CM (1:8) prop. 12mm thick using screened sand over CC bed already laid or RCC roof slab , including neat cement slurry of honey like consistancy spread @ 3.3 kgs per Sqm. and jointed neately with white cement paste to full depth mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, white cement etc., to site (excluding cost of C.C. bed) including cost of seigniorage charges on all materials, cost of base coat and all labour charges for mixing of cement mortar, laying tiles to required slope as directed by the Engineer- in-charge etc., and overheads & contractors profit complete for finished item of work. (APSS No.701 & 707) for First Floor.

510

-

870060

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing skirting to internal walls to 10 cm height with 8mm thick mirror polished granite tiles length equal to flooring tiles, set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., and overheads & contractors profit complete including seigniorage charges etc., complete for finished item of work.(APSS No.701 &707) for First Floor.

401

-

68571

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing dadooing to walls with glazed plain coloured wall tiles 1st quality of size of size not less than 300mm x 200mm with bordersas approved by Engineer-in-Charge set over base coat of CM(1:5) 12 mm thick using screened sand with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointing with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including seigniorage charges etc., and overheads & contractors profit complete for finished item of work for First Floor.

270

-

151740

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Filling with light weight concrete in Cement Concrete (1:5:10) proportion using brick jelly for low roofs including cost and conveyance of all materials like cement, sand, brick bats etc., to site including cost of all labour charges for laying concrete, ramming, curing , overheads & contractors profit etc., complete for finished item of work. (APSS. No. 402) for First Floor.

21

-

76230

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;White washing two coats with white cement to ceiling to give an even shade after thouroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials , labour charges and incidental such as scaffolding , lift charges etc., and overheads & contractors profit complete for finished item of work but excluding conveyance of materials in all floors for First Floor.

970

-

37830

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply & application of one coat water based cement primer of interior grade I and two coats of acrylic emulsion paint having VOC (Volatile Organic Compound) content less than 50 grams/litre for internal walls including cost and conveyance of all materials to site, sales & other taxes, incidental, operational and all labour charges etc., and overheads & contractors profit complete for finished item of work in First Floor.

1235

-

202540

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Painting to new wood work and flush shutters with lappam finish, over a primary coat and painting two coats of synthetic enamel paint Grade-II VOC (Volatile Organic Compound) content less than 50 grams/litre of approved shade including cost and conveyance of all materials to site cost of primer coat and all labour charges etc. complete including applying sand paper on lappam coats for neat finish including sales & other taxes on cost of all materials etc.and overheads & contractors profit complete (APSS No.1200, 1207 & 1211) in all floors.

70

-

13230

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing 110 mm Dia ISI marked PVC down water take pipes with socket , 2.5mm thick 4.0 kg/sq.cm pressure of ISI marked including cost of necessary PVC Bends, shoes, iron / PVC clamps and all other accessories and fixing in position including cost and conveyance of all materials, sales & other taxes on materials to site, operational & incidental charges including all labour charges for fixing at site etc., and overheads & contractors profit complete for finished item of work. (APSS No. 1328).

40

-

10880

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing powder coated aluminium three track sliding window with fixed fan light of 500mm at top as per the approved drawing with all required accessories such as stoppers, bolts, weather stripping etc with top and sides section of window of size 92mm x 31.5mm x 1.50mm thick, sloping outward for for drainage, fixed and sliding shutters with bottom, sides and top section of 40mm x 18mm x 1.50mm thick, interlocking section 40mm x 28mm x 18mm x 1.50mm thick inter locked for weather scaling and mounted on nylon rollers of lift type and fixing 4mm pin headed glass in fan light and for shutters fitted with aluminium glazing clips and SS 20 gauge mesh with shutter frame for bottom, sides and top with section of size 40mm x 18mm x 1.50mm thick, inter locking section 40mm x 28mm x 18mm x 1.50mm thick inter locked for weather scaling and mounted on nylon rollers of lift type fitted with nylon/polymer mesh on rollers/pulley duly fixed with TPV gaskets / EPDM weather seal resistant accessories like locking system 1 No. per set of sashes and the system is to be installed at the site using anchor fasteners, silicon rubber sealant, easy glazing/deglazing at site etc., and fan light top and side section of size 63.50mm x 38.10mm, 1.53mm thick, powder coating of all Aluminium sections 25 microns thick including fixing of 100mm long Aluminium handle to each shutter, cost and conveyance to site of powder coated aluminium sections, glass, rubber beading , fixtures etc., including labour charges for manufacturing window, fixing in position using wooden blocks and sheet metal screws, overheads & contractors profit etc., complete for finished item of work. (The aluminium sections used shall be standard make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked) Double shutter window 1500x1700 with fixed fan light of 500mm at top

38

-

137560

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing powder coated alimunium fully glazed top hung ventilators fixed with 5mm thick plain glass using suitable alluminium glazing clips and rubber beading as per approved drawings using anodized aluminium sections of 38.50mm x 33mm , 3mm thick for outer frame, 59mm(3mm) x 33mm(2.5mm) x 30mm(3mm) for mullions shutters z section of 38.50mmx33mm,3mm thick,powder coating of all alluminium sections 25mm microns thick, including cost and conveyance to site of powder coated aluminium sections, glass, rubber beading, fixtures etc., including labour charges for manufacturing window, fixing in position using wooden blocks and sheet metal screws, etc., complete for finished item of work. (The aluminium sections used shall be standard make confirming to IS 1948-1961 and as approved by the Engineer and fixtures shall be of ISI marked) VENTILATORS.

5.5

-

29414

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing single side prelam solid panel PVC door frame (Choukhat): Providing and fixing factory made Pac single side Prelam door frame of the size 50x7 mm with a wall thickness of 5mm, made out of extruded 5mm rigid Pac single side prelam sheet, meter cut at two corners and joined with 2 Nos. of 150mm long brackets of 1515mm MS Square tube. The two vertical door profiles are to be reinforced with 19 x 19mm MS. square tube of 19 guage. The door frame shall be fixed to the wall using 65/100mm long MS. Screws through the frame by using Pac fasteners. a minimum of 4 Nos. of screws to be provided for each vertical member and minimum 2nos. for horizontal member etc. complete as per manufacture specification and direction of Engineer-incharge including conveyance of all materials, labour charges for fixing, overheads & contractors profit complete for finished item of work.

80

-

30000

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing and fixing 30mm thick factory made solid single side prelam panel PVC door shutter consisting of frame made out of MS. Tubes of 19 gauge thickness and size of 19mm x 19mm for stiles, and 15mm x 15mm for top and bottom rails. The MS frame shall have a coat of steel primers of approved make and manufacture. MS frame covered with 5mm thick heat moulded ?Rajshri? single side Prelam Pac ?C? channel of size 30mm x 50mm to form stiles.5mm thick& 75mm wide single side prelim Pac sheets shall be for the top, bottom and lock rails. Panelling of 5mm thick one side Pac sheet to be fitted in the MS frame and sealed to the front (prelam side) stiles and rails (which should have a 5mm 45 bent portion as beading) and attached to the back(white/ivory) stiles and rails which should have a 10mm 900 bent portion as beading) using 2nos. 15mm wide x 5mm thick Pac sheet beading inside the 90 bent beading. All stiles, rails and beadings are to be joined to the panel using solvent cement etc. an additional 5mm thick Pac strip of 20mm width to be stuck on the interior side of the ?C? channel using Pac solvent cement adhesive and 10mm(5mmX2) thick, 20mm wide cross Pac sheet to be fitted as gap insert for top and bottom rail etc., complete as per direction of Engineer ?in-Charge, manufacture specification and drawing including ISI marked Aluminium fixtures 3 Nos. butt hinges (IS:205) of 150mm long, 1 No. aldrop (IS:2681) 250 mm long, 1 No. tower bolt (IS:204) of 150 mm x 10mm dia, 2 Nos. 125mm long handles (IS:208),1 No. Rubber / Nylon door stop bushes including labour charges for fixing the shutter to frame etc., including overheads & contractors profit complete for finished item of work of for All Floors.

26.25

-

82294

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing and fixing door frames fabricated from sections made of Powder Coated Mild Steel Hallow single rebate door frames manufactured using cold roll formed process steel sheet of 1.25 mm thick bright (Cold Rolled Close Annealed (CRCA) nd profile size of 105 x 60 mm conforming to IS 4351 - 2003 including pretreatment, Galvanized as per IS:277, zinc phosphating finished with Thermosetting Polyurethane paint of Aliphatic Grade providing high levels of scratch resistance and durability/Epoxy polyester powder for powder coating paint thickness 60 ? 65 microns(Dry film thickness)Stainless Steel Ball Bearing Butt Hinges 3 mm thick fixed flush to the frame with Hinges, Base Ties, Holdfast Lugs, Mortar Guards, shock absorbers and provision for Tower Bolts, Aldrops, Lock & Strike plates etc. for both single and double shutter doors Mild Steel Hallow single rebate general purpose door frames for All Floors.

95

-

66785

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of doors shutter as per approved drawings and Flush door shutters, solid bond wood block board type withcommercial ply on both faces.: 35 mmthick conforming to IS:2202 single shutter including cost and conveyance to site of Door frame, flush shutter including supply and fixing of ISI marked aluminium fixtures , 1 No. aldrop 300mm x 16 mm dia, 2 No tower bolt of 300 mm x 12 mm dia at top, 2 Nos. 150mm long handles, 1 Nos heavy duty door stopper and 1 No rubber bush including fixing the fixtures to door with required number of screws, bolt and nuts including labour charges for fixing the frame in position, fixing the shutter to the frame etc, including overheads & contractors profit complete for finished item of work as per APSS 1001 & 1002

24

-

64368

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing and fixing of Expansion joint filler board for buildings, columns, beams and slabs 25 mm thick including cost and conveyance of all materials to site, all incidental, operational, labour charges etc.overheads & contractors profit complete for finished item of work as per approved drawing for all floors

11.2

-

4189

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing Expansion joint treatment with poly sulphide compound of approved make of finished size 25 x 12mm including making of 25mm x 12mm groove and primer coat over finished groove with finishing of edges true to straight line and level over the finished surface of expansion joint including cost and conveyance of all materials to site, all incidental, operational, labour charges ,.overheads & contractors profit etc., complete for finished item of work as per approved drawing (for all floors on top of slab i.e in the flooring and for internal vertical joints of grooves in dadooing surface)

20

-

12880

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing and fixing of 24 gauge alluminium sheet over expansion joint groove of width 15cm fixed to walls / columns at one edge and resting over the other block walls/columns concealing expansion joint with slotted holes for free edge of aluminium sheet to facilitate free movement of aluminium sheet over the finished surface of expansion joint and wall face using sheet metal screws with nylon receiver complete including cost and conveyance of all materials to site, all incidental, operational, labour charges , overheads & contractors profit etc., complete for finished item of work as per approved drawing (for all floors for vertical joints and bottom of slab)

6

-

2526

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing of 4" (101.6mm) multi floor trap with jali - UPVC/SWR pipe fittings (Prince/ Sudhakar/ Kisan/Supreme or any other ISI Brand) as per site requirements with standard practice for all floors including cost and conveyance of all materials to site, labour charges , overheads & contractors profit etc., complete for finished item of work.

20

-

2780

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing 580mm x 440mm long Orissa pan white glazed Water Closet 1st quality ISI marked confirming to IS:2556-Part-3-1981 with "P" or "S" trap Hindware / Parryware / Neycer with brick - ISI mark and providing masonry seat, CC squatting plate and 10 litres capacity single flush PVC low level cistern Parryware or equivalent with internal components fixed on 2 Nos. of teak wood blocks of size 76.20mm x 101.60mm using required size of nails, screws as approved by Engineer-in-charge, angle stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 12.70mm PVC connection with brass union nuts CP coated , 31.75mm brass plumber union, P trap or S trap of Indian W.C. shall be encased on CC (1:2:4) 150mm alround well above the joint to stop leakage at the joint etc., complete including cost and conveyance of all materials to site, cost of CC bed, labour charges and seigniorage charges, overheads & contractors profit etc., complete for finished item of work.

8

-

34208

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing Indian make Flat Back Wash Hand Basin (HSW/Parryware/ Neycer) 1st quality conforming to IS:2556-Part-4:1972 of size 550mm x 400mm with 32 mm nominal size C.P. Fitting with parallel pipe thread conforming to IS:2963-1979 and fitted with 15 mm nominal bore Chromium Plated Pillar Tap of 1st quality Indian make 400 grams Seiko/Senior/Nice or equivalent complete with standard CI brackets including wooden blocks ,1 No.12.70mm PVC connection with brass union nuts CP coated , angle stop cock 12.70mm dia. first quality Indian make heavy duty Seiko/Senior/Nice or equivalent, 31.75mm dia. PVC flexible waste pipe 914.4mm length of 1st quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit for finished item of work

4

-

9640

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing NP soap dish heavy type of approved make ISI quality with NP screws etc., complete including cost and conveyance of all materials, labour charges for fixing , overheads & contractors profit for finished item of work in all floors.

12

-

2868

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing TV shape mirror with plastic frame of size 609.6mm x 457.2mm, plywood back with NP screws 1st quality including cost and conveyance of all materials, labour charges , overheads & contractors profit for finished item of work in all floors.

4

-

2160

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing of 25.4mm dia, 609.6mm long aluminium anodized towel rods with brackets and aluminium screws including cost and conveyance of all materials, labour charges, overheads & contractors profit for finished item of work.

10

-

1760

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing NP bib taps of size 12.70mm dia of Indian make heavy duty as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , overheads & contractors profit complete for finished item of work in all floors.

16

-

6448

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) for 90mm dia pipe.

70

-

15190

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing of SWR PVC pipes (Prince/Sudhakar) 4 Kg/Sq.cm. and fixing all special such as plain bends, off sets, door bends, single junctions, double junctions as per site requirement, fixing with PVC clamps if necessary with required number of Bombay nails including cost and conveyance of all materials to site, labour charges, overheads & contractors profit complete for finished item of work at all floor levels. (APSS No. 1302 1319 & 1326) for 110mm dia pipe.

50

-

12150

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supplying and fixing white glazed flat back Bowl urinals of size 440 mm x 265 mm x 315 mm with integral flushing rim fixed with screws complete Indian make (HSW/Parry/Neycer) conforming to IS:2556-1995 as approved by Engineer-in-charge, including supply and fixing 12.7mm PVC connection with brass plumber union nuts CP coated, 12.70mm push cock 1st quality of approved make , 31.75 mm dia PVC flexible waste pipe of 914.4 mm length of Ist quality including cost and conveyance of all materials to site, labour charges , overheads & contractors profit complete for finished item of work for all floors.

4

-

5368

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Construction of brick masonry support for GI pipe of size 304.80mm x 228.60mm x 228.60 mm in CM (1:8) prop including plastering and finishing with 12mm thick in CM (1:5) including cost and conveyance of all materials and all labour charges, overheads & contractors profit complete for finished item of work for all floors.

30

-

2460

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) for 22.20mm OD Pipe.

25

-

2650

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) for 28.60mm OD Pipe.

85

-

13940

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) for 34.90 mm OD Pipe.

45

-

11700

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and Fixing of Ashirvad/ Ajay/ Astral Flowguard or equivalent CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) for 41.30 mm OD Pipe.

45

-

16065

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Providing and placing on terrace (at all floor levels)polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , overheads & contractors profit complete for finished item of work.

4000

-

23640

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;supply and fixing of 25mm dia 2 mm thick ISI Marked concealed PVC pipe with all accessories fixing in roof slab with all required accessories including masonary work and all labour charges etc complete for run of mains etc (Sudhakar/Modi/Mercury) (1.4.2.a)

750

-

50250

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;supply and fixing of 25mm dia 1.5mm thick ISI Marked concealed in wall PVC pipe with all accessories including masonary work and all labour charges etc complete for run of mains etc (Sudhakar/Modi/Mercury)(1.4.2.b)

206

-

13390

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Wiring with 2 runs of 22/0.3mm (1.5 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) of in existing pipe with 6A switch, Ceiling rose/BH/SBH of Modular switches with cover plate including all labour charges etc., complete for light, bell, fan and exhaust fan points in Non-Residential Buildings

169

-

91767

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control of common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete. makes Anchor / Gold Medal Olive / Million Zoom .

25

-

4200

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Wiring with 2 of 22/0.3mm (1.5 Sq.mm) P.V.C. insulated F.R. flexible copper cable (ISI MARK) in existing pipe with 6A switch control and 3/2 pin sockets fixing on separate board including all labour charges etc., complete. Make:GM / L&T / RPG / Havells / V-Guard / Power Flex / Polycab / Gold Medal / Standard / Milion makes of switches:- Anchor / Gold Medal Olive / Million Zoom .

32

-

16832

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and run of 2 of ISI marked 2.5 (36/0.3mm) sqmm FR PVC insulated flexible copper cable for phases and run of 1 of 1.5sqmm (22/0.3mm) copper cable for earth laid in the existing PVC pipe for run of mains to the circuits including all labour charges etc (L&T / Finolex/Havells make ) ((3.1.4)

610

-

54290

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and run of 4 of ISI marked 6sqmm FR PVC insulated flexible copper cable along with one of run of 4sqmm FR PVC insulated flexible copper cable for earth laid in the existing PVC pipe for mains including all labour charges etc. from main panel to floor DBs.

110

-

33660

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of 3 phase 4 way TPN Distribution board with IP-20 protection (Metal Door) suitable for 3 phase 4 way with 63A, 4 Pole Isolator as incomer and 10kA , 6-32A SP MCBs -12Nos as outing going including internal connection and labour charges for surface / flush mounting etc., complete.MDS make

2

-

11870

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply, Installation, testing and commissioning only of 48" (1200mm) sweep 230v, 50Hz, 1 phase, 3 blades and double ball bearings ceiling fans without regulators including all mounting accessories as required ( Crompton make High speed)

24

-

57984

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of 1200 mm length,Box type powder coated tube light luminaire with necessary wiring suitable for fixing 1 No retrofit LED tube but without tube and choke Makes:as required etc., for complte.

45

-

13635

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of ISI mark batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 5w LED Lamp (for new installation).(Data No. 16-17;14.1.1

18

-

3420

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and fixing of Modular type Stepped electronic regulator for sweep AC ceiling fans of 1200mm (Data No. 16-17;23.1.3)

24

-

9888

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply and erecting MS galvanished Fan hook box with hook in RCC slab including all Labour charges etc., complete.

24

-

2976

... More
Construction of first floor over the existing AICTE sponsored SC/ST Boys hostel at YSR Engineering;Supply, Installation, testing of Heavy duty exhaust fan 12"(300 mm) size 900 rpm with metal blades wiremesh with all accessories etc complete including all mounting accessories as required ( Crompton make High speed)

9

-

30987



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.