Visakhapatnam Metropolitan Region Development Authority Tender

... More
The Visakhapatnam Metropolitan Region Development Authority has issued a formal invitation for competitive bids for Construction Of Temporary Cement Godown Community Building In One Cent Plots Layout Under Navaratnalu Pedalandariki Illu In Anandapuram Padmanabham Pedagantyada Mandals In Visakhapatnam District ( 2nd Call) in Visakhapatnam, Andhra Pradesh, with an estimated contract value of Rs. 92,33,196. The bid opening date for this tender is 20-07-2022 and the last date for bid submission is 28-07-2022. Interested bidders for Visakhapatnam Metropolitan Region Development Authority tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.

Visakhapatnam Metropolitan Region Development Authority Tender

Civil And Construction
Opening Date20 Jul 2022
Closing Date28 Jul 2022
Tender Amount₹ 92,33,196 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Roofing Will be provided with 0.5mm thick galvanized/pre painted G.I profilled Sheets fixed to the purlins with 14 size self drilling screws with neoprine washer.side laps are stiched with self tapping/drilling screws.end laps are to be sealed with 25.3mm butyl tape.the sheets are provided with anti capillary groove,fixed with G.I J bolts & nuts 8mm dia with bitumen & G.I Iimpet washers fitted with white lead & including a coat of approved steel primer and two coats of approved paint on over lapping of sheets complete(up to a pitch of 60degree) all charges Etc.,including cost and conveyance of all materials and labour charges for all operations Etc.,complete for finished item of work and directed by the departmental officers.(excl. cost of rafters,trusses).

991.8

-

753768

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and fixing of 12.70mm NP Bib Tap Indian make 300 grms as per approved ISI make including cost, conveyance of material to site and labour charges for all operations etc., complete as per SS and as directed by the Departmental officers

9

-

3349.8

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position tested heavy quality approved make with ISI mark full way Gun metal GATE VALVES having both ends screwed male etc,. Complete as directed by the departmental officers. For 15mm dia

9

-

5223.6

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Columns up to Plinth Level

1.78

-

19626.64

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Cost and supply and fabrication of Roof Truss of size 6.90 span using 80x4.05mm dia meduim pipe horital grider beam & slant beams and vertical posts of truss and diagonal posts of truss 50x3.65mm dia medium pipe for every 1m intervals and 72x72x4.0 mm thick squsre (SHS) purlins Etc..,including cost and conveyance of all materials and labour charges for all operations Etc.,complete for finished item of work and directed by the departmental officers.

15067.04

-

1762843.68

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and fixing of Polythene water storage tank with double layer confirm ISI 12710/96 mark with lid with capacity of 500 Lts. And make fixing with cover and suitable bolts and nuts inlet an outlet holes and over flow pipe but without fixing back suppport for tank

2250

-

11700

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position tested heavy quality approved make with ISI mark full way Gun metal GATE VALVES having both ends screwed male etc,. Complete as directed by the departmental officers.For 20mm dia

9

-

6996.6

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply,Transport, Delivery and fixing of 30mm thick solid panel PVC Door Shutter consisting of frame made out of 19 guage MS. Framof 19x19mm for stiles, top and bottam rail with a coat of primer of approved make. M.S.Frame covered with 5mm thick heat moulded PVC "c" channel of size 30x50mm formong stiles,5mm thick 75mm wide PVC sheet for top, lock & bottam rail on either side 20mm wide cross PVC sheet as gap inserting for top & bottam rail Etc.

13.5

-

29673

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Plastering in CM (1:5) mix 20mm thick using best sand including cost and conveyance of all material to site and labour charges for all operations such as mixing motor curring water leads etc.,Complete for finished item of work as per SS, as directed by the departmental officers. FOR Out side

239.76

-

76159.76

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position P.V.C Nahani Trap with 2 or 3 inlets and 75mm dia outlet and a trapseal of 40mm with stainles steel square grating on top etc,. Complete as directed by the departmental officers.

9

-

801

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Providing and fixing in position of 101.6mm (4") multi floor trap with jolly P.V.C Gully Trap chamber including complete as directed by the departmental officers.

9

-

1098

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and fixing of Rolling shutters made of 80x1.25 mm machine rolled CRCA laths,interlocked together through their entire length and jointed together at the ends by end locks ,mounted on specially designed pipe shaft of 50mm dia nominal bore MS 'B" clan pipe with brackets plates,guide channels,stoppers bottom locking plates and out side locking with push-pull operations including arrangemnts for inside and cost of hood cover and springs complete painted with one coat of approved steel primer,locks,ball bearings all accessiroes etc., complete. for Amenities building

89.2

-

312200

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 110 dia PVC Cowl including specials asnd labour charges etc., directed by the departmental officers. bmw-g.63 for toilets

9

-

153

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position CPVC 41 pipes conforming to CTS-SDR 11 with all fittings like tees, bends,elbows, reducers ,unions, nipples etc,. Including concealing the pipes in walls or under floors,including making chases in the walls fixing in the wall with clamps and making good the wall surface etc,. complete hydraulic testing after laying the pipes as specified including making holes in the walls or floors as required and redoing the same etc complete as directed by the departmental officers. For 20mm dia

225

-

21825

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position CPVC 41 pipes conforming to CTS-SDR 11 with all fittings like tees, bends, elbows , reducers, unions, nipples etc,. Including concealing the pipes in walls or under floors,including making chases in the walls fixing in the wall with clamps and making good the wall surface etc,. complete hydraulic testing after laying the pipes as specified including making holes in the walls or floors as required and redoing the same etc complete as directed by the departmental officers. For 15mm dia

135

-

8640

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Reinforcement with HYSD bars Fe 500 Fabrication and placing of Tor steel/Fe 415 grade steel reinforcement confirming to IS-226 and 1786-1985 of SAIL/ VSP/ TISCON or any approved TMT of different diameters including straightening, cutting & bending to required sizes & shapes, placing in position with cover blocks of approved material & size, including lift charges for all floors, tieing firmly with MS binding wire of 18 guage, forming grills for reinforcement work including cost, all taxes and conveyance of steel and all materials including all wastages such as overlaps, couplings, welded joints, chairs, space bars, binding wire, cover blocks and all operational, incidential, labour charges etc., complete for finished item of work complete as per SS and as directed by the departmental officers.

5526.97

-

421099.84

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Providing white cement two coats with birla white cement using best quality including cost and conveyance of all meterials to site and charges for all operationall and insidental charges including cost of brushs etc., complete for finished item of work as per SS, and as directed by the departmental officers.

3545.93

-

136908.36

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Fal-G Block Masnory in CM(1:6) using Blocks size 290x200x140mm of compressive strength 75 kg/sq.cm including cost, and conveyance of all material to work site and all operational and incidental labour charges for all operaions such as scaffolding, lift charges, mixing mortar, pocking curing etc., complete as per SS and as directed by the Departmental officers

347.94

-

1936898.47

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and fixing of White Orissa type/EWC water closet of 51mm long with P or S trap (Hindustan / Parry Ware / any other make approved by Department) including fixing I position with brick jelly concrete including cost, all taxes, conveyance of all materials to site and labour charges for all operations to site and labour charges for all operations etc., complete as per SS and as directed by the Departmental officers.For Toilets.

9

-

27144

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and Fixing of Sal Wood window frame size 75 x 75mm and Sal Wood frame shutter glazed/panelled, wooden frames and planked and size of Window 0.92 x 1.22 Mtrs for the new window it shall be pasted with fevicol or nailed on both sides with styles and rails and flanks including Teak beading including wind appliances, brass accessories, locking arrangements, including labour charges for wrought and put up and fixing wtih "Z" hold fastes and embedded in concrete (1:2:4) including cost of all materials, conveyance and charges for all operations etc., as directed by the departmental officers. and as per APDSS

30.46

-

82431.46

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 75 dia PVC Door bend 45 Degree including specials and labour charges etc., directed by the departmental officers.bmw-g.61 For toilets

9

-

531

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 110 dia PVC Door bend 45 Degree including specials asnd labour charges etc., directed by the departmental officers.bmw-g.63 for toilets

9

-

855

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Earthwork excavation in all type of soils and red soil and depositing on banks with an initial lead of 10mtrs and initial lift of 2mtrs including all charges as per Standard Specifications and as directed by the departmental officers for foundations.

302.72

-

64791.16

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Plain Cement Concrete (1:2:4) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 12 & 6mm size (SS5) hard granite metal (machine curhsed) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sale tax & other taxes on all materials and including all labour charges, such as machine mixing, laying concrete in foundations ramming , finishing top surface to the required level curing etc., complete for finished item of work and as directed by the departmental officers.

58.8

-

266767.37

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply, delivery and fixing of M.S. Ornamental door/grills of approved design and size, including cost and conveyance of necessary all materials to site and all labour charges and incidantal charges etc., complete for finished item of work and as directed by the departmental officers. (For Grill work at 20kgs/1m2) for Ground floor

379.08

-

36770.76

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 110 dia PVC/SWR Pipe 6Kg/Sqm pipes including specials and labour charges etc., directed by the departmental officers.

90

-

29862

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supplying & fixing of Internal doors of size 1.22 x 2.10 with salwood frame of 100x75mm and flush door shutters 30mm thick with commercial ply on both sides for the new doors it shall be pasted with fevicol or nailed on both sides with styles and rails and flanks including Teak beading including wind appliances, brass accessories, locking arrangements, including labour charges for wrought and put up and fixing wtih "Z" hold fastes and embedded in concrete (1:2:4) including cost of all materials, conveyance and charges for all operations etc., as directed by the departmental officers. and as per APDSS

23.1

-

80724.11

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;providing and fixing in position P.V.C soil waste and vent pipe , prince/supreme SWR pipes or equivalent with all fittings like junctions of various angles bends with or without cleaning caps jointiong with rubber rings and sealants etc,. complete and fixing on walls with P.V.C clamps so as to keep the pipes away from the walls etc,. complete including water testing as specified etc., complete as directed by the departmental officers. For 75mm dia

90

-

19422

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Painting with Enamel paint two coats over primer coat Total (3 Coats) using best quality paint including cost and conveyance of all materilas to site and labour charges for all operations etc.,complete for finished item of work as per S.S. as directed by the Engineer-in-Charge. for Rollong shutter

176.4

-

27895.9

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Plain Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) for foundations using 40mm size (SS5) hard granite metal (machine curhsed) from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including seigniorage charges, sale tax & other taxes on all materials and including all labour charges, such as machine mixing, laying concrete in foundations ramming , finishing top surface to the required level curing etc., complete for finished item of work and as directed by the departmental officers.

118.78

-

494586.85

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for lintels Ground Floor

7.08

-

78263.74

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Filling the foundations and basements with gravel complying with standard specifications for filling foundations and basements including watering and pulverizing with crow bars to saturation conditions, tampering etc., including cost, transportation and labour charges for all operations but excluding conveyance charges of imported soil complete for finished item of work as per SS and as directed by the Department Officers.

144.04

-

66183.5

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 75 dia PVC plain Tee including specials asnd labour charges etc., directed by the departmental officers.bmw-g.67 for toilets

9

-

468

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Sunshades Ground Floor

61.56

-

64307.42

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Construction of RR masonry in CM(1:6) using rough stone of hard variety from approved quarry including cost and conveyance of all materials like cement, sand, water etc. to site, all materials and including all charges for machine mixing, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge Below Plinth beam

88.7

-

389502.99

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Refilling the foundations and basements with available excavated earth complying with standard specifications for filling foundations and basements including watering and pulverizing with crow bars to saturation conditions, tampering etc., including cost, transportation and labour charges for all operations but excluding conveyance charges of imported soil complete for finished item of work as per SS and as directed by the Department Officers.

90.86

-

3720

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Internal Plastering in CM (1:5) mix 12 mm thick using best sand including cost, and conveyance of all materials to site, labour charges for all operations such as mixing mortar, curing, including all water leads etc. complete as per SS and as directed by the departmental officers for Plastering Internal areas at Ground Floor

1800.33

-

543447.61

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Providing flooring with Non-Skid ceramic tiles of approved brand and colour already laid over CC bed and including neat slurry of honey like consistency spread @ 3.3 kgs per sqm & jointed with cement to full depth mixed with pigment of matching shade and laid over C.M (1:8) 12mm thick including cost,seigniorage conveyence of all materials to site and charges for all operations etc,. Complete for finished item of work as per APDSS.

54

-

44946.9

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Supply and fixing of 550mm x 400mm-Single-CP piller cock Indian make Flat Back Wash hand basins 1St quality (Hindustan / Parry ware / any other make approved by department) including ficing in position in brick jely concrete including cost, all taxes, conveyance of all materials to site and labour charges for all operations etc., complete as per SS and as directed by the departmental officers.

9

-

20010.6

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Footings

32.4

-

269429.65

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Roof Slab Ground Floor 100mm thick,

4.13

-

44699.28

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Pedestals

3.67

-

32421.26

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Painting with Enamel paint two coats over primer coat Total (3 Coats) using best quality paint including cost and conveyance of all materilas to site and labour charges for all operations etc.,complete for finished item of work as per S.S. as directed by the Engineer-in-Charge. for Iron Grills & Doors

111.59

-

17717.14

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Filling the foundations and basements with Cursher Stone Dust complying with standard specifications for filling foundations and basements including watering and pulverizing with crow bars to saturation conditions, tampering etc., including cost, transportation and labour charges for all operations but excluding conveyance charges of imported soil complete for finished item of work as per SS and as directed by the Department Officers.

91.26

-

71427.38

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;supply and fixing of 110 dia PVC "T" Joint bend including specials asnd labour charges etc., directed by the departmental officers.

9

-

855

... More
Construction of Temporary Cement Godown Community Building in One Cent plots layout under Navaratnal;Vibrated Reinforced Cement Concrete M-30 Design Mix as per IS-456:2000 using 20mm & 12mm size (SS5) hard granite machine crushed metal (Coarse aggregate) from approved quarry, using a minimum quantity of 400 kgs of cement per cum of concrete mixing Concrete as per design mix in mechanical Weigh Batching units upto 15 Cum/hr capacity, and placing necessary reinforcement in position including cost and conveyance of all materials like cement, fine aggregate (Sand), coarse aggregate, and water to work site, seigniorage charges on all materials, including shuttering and scaffolding all taxes and all operational, incidental, labour charges, mixing concrete, laying and lift charges, vibrating, curing etc., complete for finished item of work as per standard specification but excluding cost of steel reinforcement and its fabrication charges etc., complete for finished item of work as directed by the department. for Plinth beams

19.5

-

206803.93



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.