Visakhapatnam Metropolitan Region Development Authority Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Visakhapatnam Metropolitan Region Development Authority Tender
Civil And Construction
Road Construction
Opening Date21 Jan 2023
Closing Date6 Feb 2023
Tender Amount₹ 31,94,403
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
587502Bid Award Id
ViewTender No
112/2022-23/SE/EE-IV/VMRDA, Dt.21.01.2023Tender Authority
Visakhapatnam Metropolitan Region Development Authority ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Providing Plain Cement Concrete (1:4:8) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm size (SS5) hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site and labour charges, centering, shuttering and including all incidental and operational charges for machine mixing, laying, lifting charges, vibrating concrete in foundations and under flooring bed, ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge
13.8
-
51089.39
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Providing Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm and 12mm size (SS5) hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site and labour charges, centering, shuttering and including all incidental and operational charges for machine mixing, laying, lifting charges, vibrating concrete in foundations and under flooring bed, ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge
11
-
45053.69
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Providing Plain Cement Concrete (1:3:6) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 40mm, 20mm and 12mm size (SS5) hard granite metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site and labour charges, centering, shuttering and including all incidental and operational charges for machine mixing, laying, lifting charges, vibrating concrete in foundations and under flooring bed, ramming in 15 cm layers, finishing top surface to the required level, curing etc., complete for finished item of work as per standard specifications and as directed by Engineer in charge
19.7
-
102041.86
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Providing Plastering in CM (1:5) mix 12 mm thick using best sand including cost and conveyance of all materials to site, labour charges for all operations such as mixing mortar, curing, including all water leads etc. complete as per SS and as directed by the departmental officers.
32.2
-
9527.34
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Providing white cement two coats with white cement including cost and conveyance of all materilas to site and labour charges for all operations etc.,complete for finished item of work as per S.S. as directed by the Engineer-in-Charge.
32.2
-
1243.24
Formation of Quarry Rubbish Road with Pipe Culverts for Development of Layouts for Reconstituted Pl;Refilling the foundations and basements with available excavated earth complying with standard specifications for filling foundations and basements including watering and pulverizing with crow bars to saturation conditions, tampering etc., including cost, transportation and labour charges for all operations but excluding conveyance charges complete for finished item of work as per SS and as directed by the Department Officers.
74
-
3029.56