Tungabhadra Board Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tungabhadra Board Tender
Civil And Construction
Irrigation Work
Opening Date14 Feb 2023
Closing Date28 Feb 2023
Tender Amount₹ 29,22,974
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
595070Bid Award Id
ViewTender No
192/2022-23 Dt.13.02.2023Tender Authority
Tungabhadra Board ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Package No.27;Proctor compaction (Light compaction)etc., complete as per specification and as directed by the Engineer-in-Charge
8
-
5920
... More
Package No.27;Traxial shear at OMC/in situ conditionetc., complete as per specification and as directed by the Engineer-in-Charge
8
-
19600
... More
Package No.27;Permeability at OMCetc., complete as per specification and as directed by the Engineer-in-Charge
8
-
11240
... More
Package No.27;Triaxial shear at saturationetc., complete as per specification and as directed by the Engineer-in-Charge
8
-
12040
... More
Package No.27;Insitu density and Insitu moisture contentetc., complete as per specification and as directed by the Engineer-in-Charge
510
-
331500
... More
Package No.27;Swell pressureetc., complete as per specification and as directed by the Engineer-in-Charge
8
-
11280
... More
Package No.27;Free swelletc., complete as per specification and as directed by the Engineer-in-Charge
8
-
2920
... More
Package No.27;Consistency testetc., complete as per specification and as directed by the Engineer-in-Charge
95
-
30875
... More
Package No.27;Soundness test by Le Chatellier methodetc., complete as per specification and as directed by the Engineer-in-Charge
95
-
31350
... More
Package No.27;Setting timeetc., complete as per specification and as directed by the Engineer-in-Charge
95
-
57000
... More
Package No.27;Conducting compression test on cement mortar(for set of three nos)etc., complete as per specification and as directed by the Engineer-in-Charge
95
-
192850
... More
Package No.27;Conducting compression test on cement concrete cubes (for set of three cubes)etc., complete as per specification and as directed by the Engineer-in-Charge
624
-
505440
... More
Package No.27;Sieve analysis (Fine Aggregates)etc., complete as per specification and as directed by the Engineer-in-Charge
71
-
23785
... More
Package No.27;Estimation of deleterious materials and organic impuritiesetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
11400
... More
Package No.27;Specific gravity, density, voids and absorptionetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
16400
... More
Package No.27;Sieve analysis (Coarse Aggregates)etc., complete as per specification and as directed by the Engineer-in-Charge
71
-
22010
... More
Package No.27;Estimation of deleterious materials and organic impurities (Coarse Aggregates)etc., complete as per specification and as directed by the Engineer-in-Charge
20
-
11400
... More
Package No.27;Specific gravity, density, voids and absorptionetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
16400
... More
Package No.27;Soundnessetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
46600
... More
Package No.27;Loss angeles abrasion etc., complete as per specification and as directed by the Engineer-in-Charge
20
-
14000
... More
Package No.27;Aggregate Impact valueetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
12000
... More
Package No.27;Aggregate crushing value/10% fine valueetc., complete as per specification and as directed by the Engineer-in-Charge
20
-
32200
... More
Package No.27;Conducting lab test on steel (round bar/twisted) for determining tensile strength, elongation, 0.2% proof stress and unit weight of Dia 8mm, 10mm and 12mm (for set of three rods)etc., complete as per specification and as directed by the Engineer-in-Charge
17
-
18190
... More
Package No.27;Conducting Concrete mix design, including specific gravity, absorption, and grading of coarse and fine aggregates and furnishing mix proportions details/Reports.etc., complete as per specification and as directed by the Engineer-in-Charge
4
-
27580
... More
Package No.27;Casting and testing for compressive strength of Cement Concrete Cubes by normal curing method (for set of three cubes)etc., complete as per specification and as directed by the Engineer-in-Charge
4
-
6680
... More
Package No.27;Casting and testing for compressive strength of Cement Concrete Cubes by accelerated curing method (for set of three cubes)etc., complete as per specification and as directed by the Engineer-in-Charge
4
-
6540
... More
Package No.27;Extraction and Conducting Compression test of cement concrete core samples including capping and etc. and furnishing the reports. (for set of three cores) Up to 100 mm core diameter (4 inch)etc., complete as per specification and as directed by the Engineer-in-Charge
170
-
247010
... More
Package No.27;PHetc., complete as per specification and as directed by the Engineer-in-Charge
6
-
1440
... More
Package No.27;Total Hardnessetc., complete as per specification and as directed by the Engineer-in-Charge
6
-
1524
... More
Package No.27;Chlorideetc., complete as per specification and as directed by the Engineer-in-Charge
6
-
1950
... More
Package No.27;Conducting non destructing test using rebound hammer at site (including conveyance and incidental charges)etc., complete as per specification and as directed by the Engineer-in-Charge
34
-
10540
... More
Package No.27;Suitability of Wet Mix Macadam (WMM) materialsetc., complete as per specification and as directed by the Engineer-in-Charge
31
-
149110
... More
Package No.27;Field Density Test by Sand Replacement Methodetc., complete as per specification and as directed by the Engineer-in-Charge
62
-
81220
... More
Package No.27;Preperation of Cross section at 25m c/c intervals and L section at Km wise of Main Canal, Quantity Certification, Conformity to design and specification of works executed by the Construction agency by deploying 4 Engineers to the entire contractor peroid and extended peroid of contract till the completion of work (along with soft copy)etc., complete as per specification and as directed by the Engineer-in-Charge
17
-
850000
... More
Package No.27;Providing videography (5 set) and Photography (5 sets) of works and also quality control tests conducting during various stages of execution of works i.e. before commencement of work, after dismantling earth excavation and various stages of concreting and after completion of work duly identifying the location as directed by the Engineer in charge of work and submission of 5(Five) sets of documents(CDS)etc., complete as per specification and as directed by the Engineer-in-Charge
1
-
42350
... More
Package No.27;Documentation and Submission of copies of final reports of tests conducted on the work (5 sets)etc., complete as per specification and as directed by the Engineer-in-Charge
1
-
42350
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements