To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Civil Works Others
Opening Date1 Jan 2022
Closing Date10 Jan 2022
Tender Amount₹ 21,68,010 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of ornamental entrance gate;KSRB 4-6.1 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for foundations, footings, bases of columns for mass concrete including cost of all materials, labour. Specification No. KBS 4.6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

25.44

-

7025

... More
Construction of ornamental entrance gate;KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, post and struts, square / rectangular/ polygon in plan including cost of all materials, labour Specification No. KBS 4.6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

73.37

-

35130

... More
Construction of ornamental entrance gate;KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding lm in depth including cost of all materials, labour Specification No. KBS 4.6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

26.53

-

8134

... More
Construction of ornamental entrance gate;KSRB 4-9.2: Providing T.M.T steel reinforcement for R.C.C.work including straightening,cutting, bending, hooking,placing in position, lapping and/ or welding wherever required, tying with binding wire and anchoring to the adjoining members wherever necessary complete as per design (laps, hooks and wastage shall not be measured and paid)cost of materials, labour, HOM of machinery Specification No.KBS 4.6.3 etc., complete as per specifications and as directed by the Engineer-in-Charge.

1.73

-

127713

... More
Construction of ornamental entrance gate;KSRB 4.2.7 : Providing and laying in position reinforced cement concrete of design mix M25 with OPC cement @ 340kgs,with 20mm & down size graded granite metal coarse aggregates @0.70 cum & fine aggregtes @ 0.47cum, with superplastisiser @3lts confirming to IS9103-1999 Reaffirmed-2008, machine mixed,concrete laid in layers not exceeding 15 cms thick,vibrated for all works in ground floor level for roof slabs,staircase,lintles and beams retaining walls,return walls,walls (any thickness) including attached pilasters,columns, pillars,posts,struts, buttresses,string or placing courses, parapets, coping,bed blocks, anchor blocks,plain window cills,fillets etc., including cost of all materials,labour,HOM of machinery,curing, complete but excluding cost of reinforcement Specification No KBS 4.1, 4.6 etc., complete as per specifications and as directed by the Engineer-in-Charge.

10.79

-

69914

... More
Construction of ornamental entrance gate;KSRB 2.3 : Filling available excavated earth ( excluding rock ) in sides of foundations upto plinth in layers not exceeding 20 cms. in depth, compacting each deposited layer by ramming after watering with lead upto 50 m. and lift upto 1.5 m. including cost of all labour specification. No. KBS 2.9 etc., complete as per specifications and as directed by the Engineer-in-Charge.

20.4

-

4305

... More
Construction of ornamental entrance gate;KSRB 5.1-2 : Providing and constructing granite/trap/basalt rubble stone masonry in foundation with cement mortar 1:8 (uncoursed), bond stones at two m. apart in each course including cost of materials, labour, curing KBS 5.1.12 etc., complete as per specifications and as directed by the Engineer-in-Charge.

85.2

-

304522

... More
Construction of ornamental entrance gate;KSRB 5.3-3 : Providing and constructing granite / trap / basalt size stone masonry in basement with cement mortar 1:6, edges of stones chistle dressed in courses not less than 15 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing KBS 5.1.13 etc., complete as per specifications and as directed by the Engineer-in-Charge.

51.26

-

315349

... More
Construction of ornamental entrance gate;KSRB 6-5.4 : Providing and constructing burnt brick masonry with approved quality of modular bricks of standard size of class designation 5.0Newton per sqmm (table moulded) with cement mortar 1:4 for basement and superstructure including cost of materials, labour charges, scaffolding, curing Specification No. KBS 6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

5.17

-

35882

... More
Construction of ornamental entrance gate;KSRB 4-1.6 ; Providing and laying in position plain cement concrete of mix 1:2:4 with cement @ 240kgs, with 20mm and down size graded granite metal coarse aggregates @ 0.878 cum and fine aggregtes @ 0.53cum, machine mixed, concrete laid in layers not exceeding 15 cms. thick, well compacted, in foundation, plinth and cills, ncluding cost of all materials, labour, HOM of machinery, curing Specification No. KBS 4.1, 4.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

15.94

-

92924

... More
Construction of ornamental entrance gate;KSRB 15.1.5 Providing raised and cut pointing to coursed stone masonry with cement mortar 1:3, 20mm, after raking joints to depth of 20mm nicely lining, including cost of materials, labour, curing etc., complete as per specifications and as directed by the Engineer-in-Charge.

90.22

-

594721

... More
Construction of ornamental entrance gate;KSRB15-3.7 : Providing 18mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing etc., complete as per specifications and as directed by the Engineer-in-Charge.

293.47

-

63786

... More
Construction of ornamental entrance gate;Supplying and fixing of M.S.Angle of size 50 x 50 x 6mm including cost and conveyance to site of work etc., complete as per specifications and as directed by the Engineer-in-Charge.

893.8

-

255269

... More
Construction of ornamental entrance gate;Providing chain link fencing 50mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts & nuts, the free ends shall be welded to the poles and block pipe at top and bottom as required including cost of all materials, labour, lead and lifts and as per the directions of the Engineer-in-charge of work including two coats of approved quality paint over one coat of shop paint etc., complete as per specifications and as directed by the Engineer-in-Charge.

406.98

-

30524

... More
Construction of ornamental entrance gate;Providing and fixing M.S. Gate as per Chief Architect Drawing, using 50mm x 50mm 14 guage M.S. hollow pipe frame work bent to ornamental shape as shown in the drawing and 35mm x 6mm and 16 x 16mm Square rods for verticals alternatively spaced at 4cms c/c in two halves and 40mmx6mm M.S. flats for horizontal member and at the top cast iron spikes are provided at alternate vertical members asshown in the drawing etc., complete. All the steel surface should be thoroughly cleaned free of rust and painted with anti corrosive paint (shop paint) etc., complete. The work includes cost of all materials, labour charges for all items of work, hire charges for welding, cutting and grinding equipment, and electricity charges, with lead and lift, loading and unloading charges, etc., complete as per specifications and as directed by the Engineer-in-Charge.

1835.3

-

183071

... More
Construction of ornamental entrance gate;KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour etc., complete as per specifications and as directed by the Engineer-in-Charge.

9.52

-

30108

... More
Construction of ornamental entrance gate;KSRB 15-18.2 : Providing and applying enamel metal paint two coats ( excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour etc., complete as per specifications and as directed by the Engineer-in-Charge.

1137.13

-

106265

... More
Construction of ornamental entrance gate;KSRB 15-18.2 : Providing and applying enamel metal paint two coats ( excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour, complete as per specifications.

346.08

-

34521

... More
Construction of ornamental entrance gate;KSRB 2.6 : Providing and filling sand in foundation upto plinth to required depth for sub soil treatment including watering ramming with all lead and lift specification. No. KBS 2.10.2 etc., complete as per specifications and as directed by the Engineer-in-Charge.

300.16

-

558793

... More
Construction of ornamental entrance gate;Providing and fixing Pre cast solid concrete kerb stones made out of CC 1:2:4 and finished with CM 1:3 plastering and finishing cutting etc., complete as per specifications and as directed by the Engineer-in-Charge.

150

-

70718

... More
Construction of ornamental entrance gate;KSRB 14.6-1 : Providing and laying heavy duty cobble stones 60mm thick interlock pavers, using cement and course sand for manufacture of blocks of approved size,shape and colour with a minimum compressive strenght of 281 kg per sqm over 50mm thick sand bed (average thickness)& compacting with plate vibrator having 3 tons compaction force thereby forcing part of sand underneath to come up in between joints, final compaction paver surface joints into its final level, including cost of materials, labour and HOM of machineries.Specification No. KBS etc., complete as per specifications and as directed by the Engineer-in-Charge.

100

-

108990

... More
Construction of ornamental entrance gate;1.3.2 Supplying heavy gauge PVC Conduit Pipe 25mm dia 2mm thick thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary

150

-

8100

... More
Construction of ornamental entrance gate;Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments.(2.5sqmm)

300

-

9600

... More
Construction of ornamental entrance gate;Supply of LED pole mounting type post top lantern 25 watts with pressure die cast aluminium housing body for optimal thermal dissipation. Lamp compartment comprising of antiglare clear diffuser with Injection moulded polycarbonate/ clear glass material, delivering perior light output.66Sl. No. Description Unit Rate Rs. Ps. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, CCT > 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire > IK08. Power Factor >0.9 with mains, Surge Protection- Min 5KV along with Over voltage/Overload, short circuit/ miss-wiring protection.Compatible for pole mounting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB . LED Efficiency>130lm/w,nominal CRI >75. Luminaire manufacturer should have inhouse facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source.

22

-

123200



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.