Tungabhadra Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Civil Works Others
Opening Date7 Jun 2022
Closing Date14 Jun 2022
Tender Amount₹ 21,97,795 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Improvements to Bapuram Escape;Design, fabrication, supply, erection and commissioning of embedded parts consisting of sill beam, wheel tracks, seal seatss, guide rails, gate groove liners etc., with all accessories for canal escape / regulator stoplog gate including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, applying one coat zinc rich epoxy primer and four coats of cold applied coal tar epoxy paint etc., complete as per specifications and approved drawings with lead upto 1 km and all lifts for structural steel components and all leads and lifts including packing / forwarding charges for other materials etc., complete as per specifications and directed by the Engineer-in-Charge

1.12

-

228334

... More
Improvements to Bapuram Escape;Disposal of old steel obtained from dismantling of existing gates etc., complete as per specifications and directed by the Engineer-in-Charge

-1165.03

-

-20971

... More
Improvements to Bapuram Escape;Excavation and removal of silt or silt mixed with sand in slussy condition from canal bed including disposing off the same in poil bank or on the canal embankment in layers as directed with lead upto 50 m and all lifts etc., complete as per specifications and directed by the Engineer-in-Charge

3640

-

1013376

... More
Improvements to Bapuram Escape;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for bed lining of canal including cost of all materials, machinery, labour, cleaning,batching, mixing, formwork, placing in position, levelling, vibrating, finishing, curing with lead upto 50 m and all lifts. (Cement content: 260 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete as per specifications and directed by the Engineer-in-Charge

30

-

161250

... More
Improvements to Bapuram Escape;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing etc., complete with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum)

34.01

-

203107

... More
Improvements to Bapuram Escape;Replacement of Crown Pinion Set with all new accessories like Pinion Cups, pinion bearings, pinion check nut and lock nut, Coupling Set, rubber Bush with lock nut and bolts and other required materials including cost of all transportation, materials, machinery, labour, cleaning, miscellaneous items, finishing with lead and lifts etc., complete as per specifications and directed by the Engineer-in-Charge

2

-

100000

... More
Improvements to Bapuram Escape;Charges for removing gear boxes, motors from the escape and regulator and refixing the same after gear box cleaning, oiling, greasing, servicing and overhauling of gear box and motor by replacing damaged parts if any, applying grease,painting including cost of all transportation, materials, machinery, labour, cleaning, miscellaneous items, finishing etc., complete with lead and lifts etc., complete as per specifications and directed by the Engineer-in-Charge

2

-

30000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.