Tungabhadra Board Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tungabhadra Board Tender
Paints and Enamels
Opening Date15 May 2021
Closing Date24 May 2021
Tender Amount₹ 19,45,491 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
403792Bid Award Id
ViewTender No
12/2021-22 Dt.13.05.2021Tender Authority
Tungabhadra Board ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Replacement of Govardhanagiri top structure;KSRB 4-1.6 ; Providing and laying in position plain cement concrete of mix 1:2:4 with cement @ 240kgs, with 20mm & down size graded granite metal coarse aggregates @ 0.69 cum & fine aggregtes @0.459 cum,machine mixed,concrete laid in layers not exceeding 15 cms.thick,well compacted,in foundation, plinth and cills,ncluding cost of all materials,labour,HOM of machinery,curing Specification No. KBS 4.1, 4.2 etc., complete as per specification and as directed by the Engineer-in-Charge.
0.97
-
5655
... More
Replacement of Govardhanagiri top structure;KSRB 15-18.2 : Providing and applying enamel metal paint two coats ( excluding priming coat ) over new steel or other metal surface brushing to give an even shade after cleaning oil, grease, dirt and other foreign matter, including cost of materials, labour etc., complete as per specification and as directed by the Engineer-in-Charge.
2357.6
-
235171
... More
Replacement of Govardhanagiri top structure;KSRB 13-11.1 : Providing and placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing.(For 1000 litre capacity) Specification No.KBS 13.22 etc., complete as per specification and as directed by the Engineer-in-Charge.
2
-
14339
... More
Replacement of Govardhanagiri top structure;KSRB13-6.3-5 : Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) 40mm nominal bore including cost of all materials, labour and HOM of equipments with all leads Specification No.KBS 13.2.6 / 13.3 etc., complete as per specification and as directed by the Engineer-in-Charge.
4
-
1886
... More
Replacement of Govardhanagiri top structure;KSRB13-6.4-3 : Providing and fixing in position brass ball valve high or low pressure with plastic float of approved quality 25mm nominal bore including cost of all materials, labour and HOM of equipments with all leads Specification No.KBS etc., complete as per specification and as directed by the Engineer-in-Charge.
6
-
3232
... More
Replacement of Govardhanagiri top structure;KSRB13-7.1-1 : Providing and fixing in position 25mm nominal bore gun metal non-return valve horizontal type of approved make including cost of all materials, labour and HOM of equipments with all leads Specification No.KBS 13.2.10 / 13.13 etc., complete as per specification and as directed by the Engineer-in-Charge.
4
-
2465
... More
Replacement of Govardhanagiri top structure;Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) - 32mm nominal OD pipes etc., complete as per specification and as directed by the Engineer-in-Charge.
50
-
13335
... More
Replacement of Govardhanagiri top structure;KSRB 15-16.1 : Providing and finishing external walls in two coats with waterproof cement paint of approved brand and shade to give an even shade after throughly brooming the surface to remove all dirt and loose powdered material, free from mortar drops and other foreign matter cost of materials, labour, etc., complete as per specification and as directed by the Engineer-in-Charge.
279.48
-
26117
... More
Replacement of Govardhanagiri top structure;KSRB 14.14-5: Providing Ceramic tiles of approved make,shade and size for flooring, treads of steps and landings laid on a bed of 12mm thick, cement mortar 1:3 mix, flush pointing with white cement using colour pigment , including cost of materials, labour, curing, - for Ceramic Tiles 400 x 400mm on a bed of 20mm thick etc., complete as per specification and as directed by the Engineer-in-Charge.
20.4
-
28810
... More
Replacement of Govardhanagiri top structure;KSRB 15-14.1 : Providing and applying two coats with oil bound washable distemper of approved brand and shade on wall surface including priming coat with distemper primer after throughly brooming the surface free from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour, etc., complete as per specification and as directed by the Engineer-in-Charge.
67.56
-
7803
... More
Replacement of Govardhanagiri top structure;PROVIDING TRAPEZOIDAL PROFILED SHEET Providing and installing of pre painted Galvolume iron Trapezoidal profiled sheet of approved make 1060 mm width (1000 mm cover width), 28-30 mm crest height with crest distance of 200 mm c/c with 2 ribs at the centre for stiffening. The total coated thickness (TCT) of the sheet will be 0.47 mm +/- 0.02 mm tolerance Zinc-Alu Alloy coating AZ150 gsm as per ASTM 1397/A755-550 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 20-22 microns using self drilling/self tapping screws of 25 mm length, to be fixed over the existing purlins, rafters, channels and trusses etc., complete as per specification and as directed by the Engineer-in-Charge.
26.4
-
19071
... More
Replacement of Govardhanagiri top structure;Providing and fixing 304 - grade stainless steel hand rails of 14-gauge pipes for Ramps or Staircase are made out of stainless steel hallow pipes, using 50mm dia for verticals @1.60 mtr c/c are fixed to the ramps or steps by drilling with bolts and 100mm dia MS base plates 10mm gauge for fixing of Vertical pipes 4 - Nos anchor bolts & 40mm dia pipes are fixed horizontally for 2-rows top, one pipes are fixed with vertical pipes another one are fixed with elbows and 25mm dia pipes are fixed horizontally for 2-rows below top measure @ equal intervals including cutting, welding, bending wherever necessary with suitable caps @ tops, bottoms & corners finishing with mat / shining etc., complete including cost and conveyance of all materials, labour for all items of work, HOM of equipment with all lead and lift, loading and unloading, transportation charges and all other incidental charges etc., complete as per specification and as directed by the Engineer-in-Charge.
21.03
-
15788
... More
Replacement of Govardhanagiri top structure;Dismantling of Govardhana giri top structure using necessary equipments and labours as required and preparing for reconstruction etc., complete as per specification and as directed by the Engineer-in-Charge.
1
-
65000
... More
Replacement of Govardhanagiri top structure;Design and fabrication of govardhana giri top base structure and with required materials including welding and labour charges etc., complete as per specification and as directed by the Engineer-in-Charge.
42
-
189000
... More
Replacement of Govardhanagiri top structure;Remodeling and repairing of top structure over the base frame work using Resin and hardner by mixing required proportions for hardening and curing etc., complete as per specification and as directed by the Engineer-in-Charge.
88
-
281600
... More
Replacement of Govardhanagiri top structure;Remodeling of govardhanagiri structure with Fibre glass mat for creating the required structure as per the design including all labour charges etc., complete as per specification and as directed by the Engineer-in-Charge.
42
-
176400
... More
Replacement of Govardhanagiri top structure;Creating artistic Painting of structure by mixing necessary color and matching the design of the structure with cost of all material and labour charges etc., complete as per specification and as directed by the Engineer-in-Charge.
1
-
68000
... More
Replacement of Govardhanagiri top structure;Mounting of structure by installing required support structure for govardhanagiri statue etc., complete as per specification and as directed by the Engineer-in-Charge.
1
-
70000
... More
Replacement of Govardhanagiri top structure;Strengthening & repairing the bottom structure of Govardhanagiri including curing work etc., complete as per specification and as directed by the Engineer-in-Charge.
1
-
450000
... More
Replacement of Govardhanagiri top structure;Repair and Creating artistic Painting of 26 diffent idols of animals and birds along with krishna statue(13Nos cows, 4Nos crane, 3Nos pigeon, 1 No parrot, 1 no peacock, krishna and 3 persons) by mixing necessary color and matching the design of the structure with cost of all material and labour charges etc., complete as per specification and as directed by the Engineer-in-Charge.
26
-
57200
... More
Replacement of Govardhanagiri top structure;Construction, supply & establishment of highly super realistic models of ornamental miniature arch ( 6 m X 2.6 m) Made up of 16 mm, 14mm, 10mm, 8mm quality steel iron mesh 53 grade good quality cement, sand and bricks with complete curing smooth finish with china glacy balls for eyes and three coats of painting with artistic quality and suitable branded paint of natural colours. The models should be proportionate in size and shape and CG should be maintained with respect to weight of the model be acceptable by the competent authority. The model should have proper size, CC basement according to the ground position of the garden where to be installed. The estimate incudes all type of cement basement, lift and leads transportation and labour etc., complete as per specification and as directed by the Engineer-in-Charge.
1
-
720000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements