Tungabhadra Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Irrigation Work
Opening Date14 Feb 2023
Closing Date28 Feb 2023
Tender Amount₹ 6,44,772 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Package No.29;Proctor compaction (Light compaction) etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

2960

... More
Package No.29;Traxial shear at OMC/in situ condition etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

9800

... More
Package No.29;Permeability at OMC etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

5620

... More
Package No.29;Triaxial shear at saturation etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

6020

... More
Package No.29;Insitu density and Insitu moisture content etc., complete as per specification and as directed by the Engineer-in-Charge

15

-

9750

... More
Package No.29;Swell pressure etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

5640

... More
Package No.29;Free swell etc., complete as per specification and as directed by the Engineer-in-Charge

4

-

1460

... More
Package No.29;Consistency test etc., complete as per specification and as directed by the Engineer-in-Charge

32

-

10400

... More
Package No.29;Soundness test by Le Chatellier method etc., complete as per specification and as directed by the Engineer-in-Charge

32

-

10560

... More
Package No.29;Setting time etc., complete as per specification and as directed by the Engineer-in-Charge

32

-

19200

... More
Package No.29;Conducting compression test on cement mortar(for set of three nos) etc., complete as per specification and as directed by the Engineer-in-Charge

32

-

64960

... More
Package No.29;Conducting compression test on cement concrete cubes (for set of three cubes) etc., complete as per specification and as directed by the Engineer-in-Charge

218

-

176580

... More
Package No.29;Sieve analysis (Fine Aggregates) etc., complete as per specification and as directed by the Engineer-in-Charge

25

-

8375

... More
Package No.29;Estimation of deleterious materials and organic impurities etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

2850

... More
Package No.29;Specific gravity, density, voids and absorption etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

4100

... More
Package No.29;Sieve analysis (Coarse Aggregates) etc., complete as per specification and as directed by the Engineer-in-Charge

25

-

7750

... More
Package No.29;Estimation of deleterious materials and organic impurities (Coarse Aggregates) etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

2850

... More
Package No.29;Specific gravity, density, voids and absorption etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

4100

... More
Package No.29;Soundness etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

11650

... More
Package No.29;Loss angeles abrasion etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

3500

... More
Package No.29;Aggregate Impact value etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

3000

... More
Package No.29;Aggregate crushing value/10% fine value etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

8050

... More
Package No.29;Conducting lab test on steel (round bar/twisted) for determining tensile strength, elongation, 0.2% proof stress and unit weight of Dia 8mm, 10mm and 12mm (for set of three rods) etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

5350

... More
Package No.29;Conducting Concrete mix design, including specific gravity, absorption, and grading of coarse and fine aggregates and furnishing mix proportions details/Reports. etc., complete as per specification and as directed by the Engineer-in-Charge

2

-

13790

... More
Package No.29;Casting and testing for compressive strength of Cement Concrete Cubes by normal curing method (for set of three cubes) etc., complete as per specification and as directed by the Engineer-in-Charge

2

-

3340

... More
Package No.29;Casting and testing for compressive strength of Cement Concrete Cubes by accelerated curing method (for set of three cubes) etc., complete as per specification and as directed by the Engineer-in-Charge

2

-

3270

... More
Package No.29;Extraction and Conducting Compression test of cement concrete core samples including capping and etc. and furnishing the reports. (for set of three cores) Up to 100 mm core diameter (4 inch) etc., complete as per specification and as directed by the Engineer-in-Charge

10

-

14530

... More
Package No.29;PH etc., complete as per specification and as directed by the Engineer-in-Charge

3

-

720

... More
Package No.29;Total Hardness etc., complete as per specification and as directed by the Engineer-in-Charge

3

-

762

... More
Package No.29;Chloride etc., complete as per specification and as directed by the Engineer-in-Charge

3

-

975

... More
Package No.29;Conducting non destructing test using rebound hammer at site (including conveyance and incidental charges) etc., complete as per specification and as directed by the Engineer-in-Charge

3

-

930

... More
Package No.29;Suitability of Granular Sub-base (GSB) materials (All grades of Coarse Graded and close Graded) etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

29150

... More
Package No.29;Suitability of Wet Mix Macadam (WMM) materials etc., complete as per specification and as directed by the Engineer-in-Charge

5

-

24050

... More
Package No.29;Field Density Test by Sand Replacement Method etc., complete as per specification and as directed by the Engineer-in-Charge

19

-

24890

... More
Package No.29;Preperation of Cross section at 25m c/c intervals and L section at Km wise of Main Canal, Quantity Certification, Conformity to design and specification of works executed by the Construction agency by deploying 4 Engineers to the entire contractor peroid and extended peroid of contract till the completion of work (along with soft copy) etc., complete as per specification and as directed by the Engineer-in-Charge

1

-

50000

... More
Package No.29;Providing videography (5 set) and Photography (5 sets) of works and also quality control tests conducting during various stages of execution of works i.e. before commencement of work, after dismantling earth excavation and various stages of concreting and after completion of work duly identifying the location as directed by the Engineer in charge of work and submission of 5(Five) sets of documents(CDS) etc., complete as per specification and as directed by the Engineer-in-Charge

1

-

42350

... More
Package No.29;Documentation and Submission of copies of final reports of tests conducted on the work (5 sets) etc., complete as per specification and as directed by the Engineer-in-Charge

1

-

42350



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.