Tungabhadra Board Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tungabhadra Board Tender
Civil And Construction
Civil Works Others
Opening Date4 Jun 2022
Closing Date10 Jun 2022
Tender Amount₹ 19,61,235 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
514794Bid Award Id
ViewTender No
23/2022-23 Dt.03.06.2022Tender Authority
Tungabhadra Board ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of CC wall to DP09 approach;Providing and laying insitu vibrated M-15 ( 28 days cube compressive 4.17.2. strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for gravity type retaining walls / abutments etc., including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing,placing in position, levelling, vibrating, finishing, curing with all leads and lifts etc., complete as per specification and as directed by the Engineer-in-Charge.
113.16
-
700194
... More
Construction of CC wall to DP09 approach;Providing and laying insitu vibrated M-20 ( 28 days cube compressive 20 mm down approved, clean, hard, graded aggregates for abutments deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning,batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all lead and all lifts Providing and laying Cement concrete wearing coat M-30 grade including reinforcement as per drawing and Technical Specifications etc., complete as per specification and as directed by the Engineer-in-Charge.
12.36
-
88886
... More
Construction of CC wall to DP09 approach;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for side lining of canal including cost of all materials, machinery, labour, cleaning,batching, mixing, formwork, supports, placing in position, levelling,vibrating, finishing junction of bed and sides to required curvature,finishing side slopes, curing with all leads and lifts ( Cement content: 270 kg / cum with use of super plasticiser ) etc., complete as per specification and as directed by the Engineer-in-Charge.
90
-
753921
... More
Construction of CC wall to DP09 approach;Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and stuff neatly for formation of service road / field channel embankment as directed including cost of all materials, machinery, labour, dressing bed and sides to required level and profile with lead upto 10 m and lift upto 2 m etc., complete as per specification and as directed by the Engineer-in-Charge.
0.95
-
157649
... More
Construction of CC wall to DP09 approach;Earth work in surface excavation by mechanical means for lowering & leveling the ground for all works other than foundation in all kinds of soils & upto depth not exceeding 300mm as per drawing and technical specifications, including setting out, shoring, strutting, barricading,caution lights, removal of stumps and other deleterious matter including dressing of excavated surfaces, disposing off or levelling the excavated earth or sorting & stacking the selected earth for reuse in a radius of 50 m and lift upto 1.5 m including cost of labour, tools, usage of machinery & other appurtenances required etc., complete as per specification and as directed by the Engineer-in-Charge.
1425
-
97256
... More
Construction of CC wall to DP09 approach;Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,grading to required slope and compacting to meet the requirement complete as per specifications, including cost of labour,rolling,water,all materials,usage & all other appurtenaces required to complete the work etc., complete as per specification and as directed by the Engineer-in-Charge.
2375
-
1002488
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements