Tungabhadra Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Irrigation Work
Civil Works
Opening Date5 Mar 2022
Closing Date21 Mar 2022
Tender Amount₹ 50,92,75,116 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Package No.19 Restoration of Canal Section;Providing casing Embankment using semi pervious / pervious soil from approved borrow area in layer of 250 to 300 mm (before compaction) including cost of all materials, machinery, labour, all other operations such as collection of soil, spreading soil in layer of specified thickness, sorting out, breaking clods,levelling, sectioning, edges / sides watering, compacting each layer to density control of not less than 95 percent or as stipulated using power roller with lead upto 1km & all lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

165450

-

67675668

... More
Package No.19 Restoration of Canal Section;Benching old embankment slopes 0.45 X 0.45 M etc., complete as per specifications and as directed by Engineer-in-Charge.

123540

-

617700

... More
Package No.19 Restoration of Canal Section;Providing and constructing longitudinal and cross graded filter drains using sand and 20 mm down graded aggregates satisfying specified filter creteria in layers as per specifications including cost of all materials, machinery, labour, laying to required slopes, compaction with initial lead upto 50 m and all lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

2092

-

3678949

... More
Package No.19 Restoration of Canal Section;Providing, Fabricating and placing in position reinforcement steel bars for RCC works including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, lapping, welding wherever required, tying with 1.25 mm dia soft annealed steel wire with initial lead up to 50 m and all lifts. etc., complete as per specifications and as directed by Engineer-in-Charge.

1356784

-

105639202

... More
Package No.19 Restoration of Canal Section;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with initial lead upto 50 m and all lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

5062

-

33293888

... More
Package No.19 Restoration of Canal Section;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N /sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for bed and side lining of canal(100 mm thick) including finishing the junction of bed and sides to required curveture, cost of all materials, machinery, labour, formwork including supports, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with initial lead upto 50 m and all lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

190

-

1259715

... More
Package No.19 Restoration of Canal Section;Providing and laying 100 mm thick in situ M-15 (28 days cube compressive strength not less than 15 N /Sqmm ) grade cement concrete with 20 mm down size approved, clean, hard, graded aggregates for canal lining using, vibrating, cylinder type mechanical paver including cost of all materials, machinery, labour, cleaning, batching, mixing, placing in position, finishing, forming contraction joints, fixing PVC joint sealing strips, curing, shifting of paver from one side to othere side of canal with initial lead upto 1 Km and all lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

286490

-

179251063

... More
Package No.19 Restoration of Canal Section;Providing and fixing 50 mm dia perforated GI pressure relief pipes 22.50 cm long one end closed with perforated GI plate and other end provided with alluminium lid hinged to pipe including cost of all materials, labour, drilling 8 mm dia holes with all leads and lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

18153

-

3518051

... More
Package No.19 Restoration of Canal Section;Dismantling, shifting and re-erecting mechanical concrete paver and DG set with all accessories across canal CD work or such other locations where dismantling, shifting, re-erecting and aligning of paver is necessary for continuing further canal lining work including cost of all materials, machinery, labour with all leads and lifts etc., complete as per specifications and as directed by Engineer-in-Charge.

22

-

259699

... More
Package No.19 Restoration of Canal Section;Reinforced cement concrete M 15 grade Kilometre Stones of standard design as per IRC:8-1980, fixing in position including painting and printing with all leads and lifts.MoRTH 804 SDB etc., complete as per specifications and as directed by Engineer-in-Charge.

11

-

30437

... More
Package No.19 Restoration of Canal Section;Reinforced cement concrete M 15 grade Hectometre Stone (Precast) of standard design as per IRC:26-1967, fixing in position including painting and printing with all leads and lifts.MoRTH 804 SDB etc., complete as per specifications and as directed by Engineer-in-Charge.

45

-

31275

... More
Package No.19 Restoration of Canal Section;Dewatering by providing 5HP Diesel pump as directed by Engineer-in-Charge.

7124

-

2011818



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.