Tungabhadra Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Bridge Construction
Opening Date4 Jun 2022
Closing Date10 Jun 2022
Tender Amount₹ 27,87,408 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing rubble and sand filling in layers of 250 to 300 mm including cost of all materials,machinery, labour, watering, ramming with lead upto 50 m and all lifts etc., complete as per specifications and directed by the Engineer-in-Charge

5.4

-

11357

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down approved, clean, hard, graded aggregates for foundation filling including cost of all materials, machinery, labour, formwork,cleaning, batching, mixing, placing in position, levelling, vibrating,finishing, curing with lead upto 50 m and depth of foundation upto 1.5 m from surface. Cement content: 240 kg / cum with use of super plasticiser ) etc., complete as per specifications and directed by the Engineer-in-Charge

66.48

-

384969

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing, fabricating and placing in position reinforcement steel for RCC works including cost of all materials, machinery,labour, cleaning,straightening, cutting,bending,hooking lapping,welding wherever required,tying with 1.25 mm dia. soft annealed steel wire etc., complete with lead upto 50 m and all lifts.

2186.03

-

197399

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing and laying insitu vibrated M-20 ( 28 days cube compressive 4.21.1 strength not less than 20 N / sq mm ) grade cement concrete using 20 mm down approved, clean, hard, graded aggregates for piers deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing with all lead and all lifts etc., complete as per specifications and directed by the Engineer-in-Charge

97.18

-

698865

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing and laying insitu vibrated M-20 ( 28 days cube compressive strength not less than 20 N / sq mm ) grade cement concrete using)20 mm down approved,clean, hard, graded aggregates for RCC troughs for aqueduct deploying batching plant, transit mixer and concrete pump including cost of all materials, machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position, levelling, vibrating, finishing, curing etc., complete with all lead and lifts. etc., complete as per specifications and directed by the Engineer-in-Charge

109.5

-

1263345

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading, grading to required slope and compacting to meet the equirement complete as per specifications, including cost of labour,rolling,water,all materials,usage& all other appurtenaces etc., complete as per specifications and directed by the Engineer-in-Charge

48.6

-

20514

... More
Construction of Hard Passage for UT at Km 2.216 of RBHL;Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling, concrete and masonry works in head walls and parapets Clause 1101.6......750 mm dia etc., complete as per specifications and directed by the Engineer-in-Charge

70

-

234780



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.