Tungabhadra Board Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tungabhadra Board Tender
Civil And Construction
Civil Works Others
Opening Date21 Jun 2022
Closing Date27 Jun 2022
Tender Amount₹ 17,06,891 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
520480Bid Award Id
ViewTender No
33/2022-23 Dt.07.06.2022 (2nd Call)Tender Authority
Tungabhadra Board ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Improvements to 2LB;Excavation in all kinds of soil including boulders upto 0.3 m diameter for canal,seating of embankment, filter drains / catch water drains etc., including dressing bed and sides to required level and profile, cost of all materials, machinery, labour, placing the excavated soil neatly in dump area or for the formation of service road / embankment as directed with initial lead upto 1 km and all lifts etc., complete as per specifications and as directed by the Engineer-In-Charge
117.59
-
13782
... More
Improvements to 2LB;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 40 mm down size approved, clean, hard, graded aggregates for well top plug including cost of all materials, machinery, labour, cleaning,batching, mixing, placing in position, levelling, vibrating, finishing, curing with initial lead upto 50 m and all lifts.If water is to be brought from other place add only lead charges @ 500 ltr / cum.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.90cum, Blending Ratio of CA--50:30:20, FA : 0.40 cum) etc., complete as per specifications and as directed by the Engineer-In-Charge
12.89
-
70138
... More
Improvements to 2LB;Providing and laying insitu vibrated M-15 ( 28 days cube compressive strength not less than 15 N / sq mm ) grade cement concrete using 20 mm down size approved, clean, hard, graded aggregates for sub-structure / super- structure works including cost of all materials,machinery, labour, formwork, scaffolding, cleaning, batching, mixing, placing in position,levelling, vibrating, finishing, curing with initial lead upto 50 m and all lifts.(Cement content: 280 kg / cum with use of super plasticiser(0.4% by wt. of cement),CA : 0.80cum, Blending Ratio of CA--65:35, FA : 0.45 cum) ( IRR-CCDW-2-10) etc., complete as per specifications and as directed by the Engineer-In-Charge
52.56
-
338524
... More
Improvements to 2LB;Providing hearting / casing embankment with homogeneous soil from approved borrow areas in layers of 25 cm before compaction including cost of all materials, machinery,labour, operations such as excavation, sorting out, transporting, spreading in layer oflabour, all operations such as excavation, sorting out, transporting, spreading in layer of specified thickness, breaking clods, sectioning, watering, compacting each layer to density control of not less than 95 percent or as stipulated by Sheep foot roller / Vibratory roller/ 8 to 10 tonne power roller etc., complete with initial lead upto 1 km and all lifts. (IRR-CAW-2-7) etc., complete as per specifications and as directed by the Engineer-In-Charge
1585.5
-
488810
... More
Improvements to 2LB;Manufacture, Supply and Delivery of R.C.C. Socket and Spigot pipes conforming to B.I.S. 458/2003 at ex-factory (rate per meter of effective length) Excluding transportation and all taxes.(MAT-5747) etc., complete as per specifications and as directed by the Engineer-In-Charge
20
-
146747