Tungabhadra Board Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tungabhadra Board Tender

Civil And Construction
Building Construction
Opening Date16 Feb 2022
Closing Date23 Feb 2022
Tender Amount₹ 68,17,021 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Construction of EE Quarters in LLC Colony, Ballari;Dismantling size stOne Metreasonry in clay mortar and stacking the size stone within a radius of 50m and removing the debris to a distance upto 200m. etc., complete as per specifications and as directed by the Engineer-in-Charge

1111.5

-

316277

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB 300-2. Earthwork excavation by manual means in hard soil involving an average horizontal throw upto 2 meters and an average lift upto 0.5 m, excavated surface leveled and sides neatly dressed, the disposed earth to be leveled neatly after breaking of clods complete as per specifications. MORTH / Chapter 3 etc., complete as per specifications and as directed by the Engineer-in-Charge

314.32

-

59076

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M1200-46. Sand filling in wells complete as per drawing and technical specifications MORTH Specification No.1207 etc., complete as per specifications and as directed by the Engineer-in-Charge

112.82

-

269380

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M2100 PCC 1 KSRRB M2100-10. Plain cement concrete M10 with OPC cement @ 220kgs, with crushed 40mm and down size graded granite metal coarse aggregates @0.84cum and fine aggregates @ 0.56cum, in foundation mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per specifications MORTH Specification No. 2100 etc., complete as per specifications and as directed by the Engineer-in-Charge

55.31

-

296708

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 5.2-2 : Providing and constructing granite / trap / basalt size stOne Metreasonry in foundation with cement mortar 1:8, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 etc., complete as per specifications and as directed by the Engineer-in-Charge

28.1

-

139706

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 5.2-3 : Providing and constructing granite / trap / basalt size stOne Metreasonry in foundation with cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 etc., complete as per specifications and as directed by the Engineer-in-Charge

33.36

-

169536

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M300-Construction of Subgrade and Earthen Shoulders. KSRRB M300-55. Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory rollercompaction by vibratory roller to 97% of proctors density) MORTH Specification No. 305 etc., complete as per specifications and as directed by the Engineer-in-Charge

183.27

-

113151

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M1100- Supplying, Fitting and Placing un-coated HYSD bar /MS Bar KSRRB M1100-13. Supplying, Fitting and Placing un-coated TMT bar Reinforcement in Foundation as per Drawing and Technical Specifications complete as per specifications MORTH Specification No.1600 - TMT bars Fe 550(25.27.3) etc., complete as per specifications and as directed by the Engineer-in-Charge

8.96

-

638747

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of Design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70 cum and fine aggregtes @ 0.47cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008 at machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 (4.10) etc., complete as per specifications and as directed by the Engineer-in-Charge

104.14

-

649302

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-5 : Providing lath plaster with cement mortar 1:3, 5cms thick with 6mm dia mild steel bars at 20 cms. c to c both horizontally and vertically fixed with chicken mesh for drop chajja, facia, backing to cup boards including cost of all materials, labour, providing and removing form work HOM of machineries, curing, complete as per specifications. Specification No. KBS (4.27) etc., complete as per specifications and as directed by the Engineer-in-Charge

104

-

116407

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-6.5 : Providing and removing centering, shuttering, strutting, propping etc., for columns, pillars, post and struts, square / rectangular/ polygon in plan including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 (4.32) etc., complete as per specifications and as directed by the Engineer-in-Charge

198.84

-

95205

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 (4.34) etc., complete as per specifications and as directed by the Engineer-in-Charge

175

-

53655

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-6.2 : Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for suspended floors, landings, balconies and likes, thickness upto 200 mm including cost of all materials, labour complete as per specificaitons for heights more than 3.50m from ground level. Specification No. KBS 4.6.2 0 to 5 mts (4.29.2) etc., complete as per specifications and as directed by the Engineer-in-Charge

314.7

-

134817

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 6-1.3 : Providing and constructing burnt brick masonry for basement and superstructure with approved quality of non-modular bricks of standard size of class designation 3.5Newton per sqmm with cement mortar1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge

59.19

-

390175

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB15-3.7 : Providing 18mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(15.15) etc., complete as per specifications and as directed by the Engineer-in-Charge

663.06

-

189370

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing Special make glazed Vitrified tiles (Granomite finish) of approved make, quality and colour of size 600x600x10mm thick fixed on existing flooring with a special roffe adhesive for flooring and skirting etc., complete including providing spears at required interval and removing stains etc., complete. etc., complete as per specifications and as directed by the Engineer-in-Charge

144.2

-

166400

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 14.14-5: Providing Ceramic tiles of approved make,shade and size for flooring, treads of steps and landings laid on a bed of 12mm thick, cement mortar 1:3 mix, flush pointing with white cement using colour pigment , including cost of materials, labour, curing, complete as per specifications. - for Ceramic Tiles 400 x 400mm on a bed of 20mm thick etc., complete as per specifications and as directed by the Engineer-in-Charge

84.59

-

119462

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 14.7-2 : Providing and laying red oxide flooring 40 mm thick, with an under layer of 30mm thick M-15 cement concrete, using broken granite metal of 12.5mm nominal size and top layer of 10mm thick plaster with 1:3 cement mortar mixed with red oxide ( using 3.5 kg of red oxide per 50 kg of cement ) finished with floating coat of neat cement mixed with red oxide ( mix of same proportion ) , including cost of materials, labour, curing, complete as per specifications. Specification No. KBS 14.3 (14.9) etc., complete as per specifications and as directed by the Engineer-in-Charge

144.19

-

100832

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 11-1 : Providing and fixing white vitreous china clay, water closet indian type (Squatting pan) of size 580mm with footrests , 100mm S or P trap, 10 liters low level, P.V.C flushing cistern (all are approved make ) with fittings , C.I / M.S brackets , 32mm diameter flush pipe fittings and clamps, overflow arrangements with specials and 25mm masquito proof coupling of approved design, painting of fittings and brackets, cutting and making good the wall and floor wherever required, including cost of materials,labour complete as per specifications etc., complete as per specifications and as directed by the Engineer-in-Charge

1

-

3681

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 11.5: Providing and fixing white vitreous china clay,water closet European type(Pedestal type,P-trap) with black solid plastic seat and lid,C.P brass hinges,rubber buffers. 10 litres low level, P.V.C flushing cistern(all are approved make) with fittings,C.I/M.S brackets,40mm diameter flush bend with fittings and clamps,overflow arrangements with special and 25mm mosquito proof coupling of approved design,painting of fittings and brackets,cutting and making good the wall and floor wherever required,including cost of materials,labour complete as per specifications. Specification No. KBS11 etc., complete as per specifications and as directed by the Engineer-in-Charge

2

-

10408

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-8.9 : Providing and fixing to wall, ceiling and floor, low density polyethylene pipes 6.00 kgf/sq.cm working pressure 110mm outside diameter with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No.KBS 13.2.15.1 / 13.9(13.70.5) etc., complete as per specifications and as directed by the Engineer-in-Charge

80

-

37800

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-4.2 : Extra for use of water proofing compound in Cement concrete of mix 1:1.5:3,at one kg of compound per bag of cement. Specification No. KBS(4.25) etc., complete as per specifications and as directed by the Engineer-in-Charge

22.05

-

3589

... More
Construction of EE Quarters in LLC Colony, Ballari;Supply and fixing of door frame made of hollow extruded PVC Section (Nandi or Equivalent) having dimension of 40x57mm with the wall thickness of 2mm+/-0.2mm duly reinforced with seasoned wood plank at the hinges side. The door frame top 2corners shall be metric cut/ welded. etc., complete as per specifications and as directed by the Engineer-in-Charge

9.9

-

2599

... More
Construction of EE Quarters in LLC Colony, Ballari;SOLID PANEL PRELAM PVC DOOR SHUTTER Providing & fixing 30mm thick factory made rigid foam Prelam Panelled Door Shutters made from M.S. tube of 19x19mm, 19 gauge for styles and 15x15mm for top & bottom rails, covered with heat moulded Prelaminated PVC C Channel of 5mm thick sheet & 30x50mm wide to form styles & 5mm thick & 75mm wide Prelaminated PVC Sheets for top rail, lock rail & bottom rail on either side & 5mm thick, 20mm wide cross PVC sheet as gap insert for top rail & bottom rail, Panelling of 5mm thick PVC sheet Prelaminated on either side fitted in the M.S. frame, Sealed to the styles & rails with PVC Designer beading on either side & joined together with solvent cement adhesive etc., Complete as per manufacturers specification & direction of Engineer-in-charge fixed to frames with 3 nos of 75mm. Aluminium hinges. with both side prelam etc., complete as per specifications and as directed by the Engineer-in-Charge

3.15

-

12390

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 9.4-3 : Providing Mathi / Nandi wood frames of doors, windows, clerestory windows, ventilators and other frames, wrought, framed or assembled including making plaster groves ( excluding cost of cement concrete and side clamps ), but including cost of materials, labour, HOM of machineries complete as per specifications. Specification No. KBS 9.33 etc., complete as per specifications and as directed by the Engineer-in-Charge

2.04

-

163195

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 9.5-3 : Providing and fixing in position fully panelled Mathi/Nandi wood shutters for doors, styles and rails of 40mm. thick with bottom and lock rails 180mm wide top rail and styles 100mm wide as per drawing and panels of 25mm thick including cost of materials, labour, HOM of machineries complete as per specifications. ( excluding cost of fixtures) Specification No. KBS 9.34 etc., complete as per specifications and as directed by the Engineer-in-Charge

10.92

-

49178

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing & fixing of glazed 3 Track - 2 Panel Sliding Door made out of multi chambered uPVC sections with TPV gaskets having isolated drainage and reinforced with Galvanized Iron profiles through out the window. The sliding outer frame having a overall size of 60x45 mm with reinforcement of 1 mm thickness, super sas with overall size of 39x75 mm with reinforcement of 1.5mm thickness. Glazing bead for fixing of glass shall be of size 20x18 mm and coestruded with gasket. Fiber Glass mesh shall be provided in mesh shutter. Window/Door shall be provided with 6 mm plain float glass, stgandard hardware & multi point locking system of patio espagnolette. Wall thickness of frame, mullion & sash shall be 2-2.2 mm. WITH MESH etc., complete as per specifications and as directed by the Engineer-in-Charge

20.7

-

123346

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 7.9 : Providing and fixing M.S.grill work for windows and ventilators weighing 21kg/sqm using M.S. flats, or M.S. square rods, or combination of M.S. flats and square rods as per approved design, drawing including cutting steel sections and welding the same to required pattern with a coat of red lead primer, cost of materials, fixtures, labour and HOM of machinery complete as per specifications. Specification No. KBS 7.12(7.90) etc., complete as per specifications and as directed by the Engineer-in-Charge

514.08

-

51279

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 11-11.8 : Providing and fixing white vitreous china clay, surgeon type wash basin size 660x460mm with a pair of 15mm C.P brass pillar taps with pair of elbow operated levers, C.I / M.S brackets, 32 mm C.P. brass waste of standard pattern, painting of fittings and brackets, cutting and making good the wall and floor wherever required, including cost of materials, labour complete as per specifications. KBS 11(12.30) etc., complete as per specifications and as directed by the Engineer-in-Charge

4

-

19341

... More
Construction of EE Quarters in LLC Colony, Ballari;Constructing brick masonry inspection chamber 450x450mm, and 450mm depth, ( clear inside dimension ) for single pipeline, using table moulded non-modular bricks of class designation 50 in cement mortar 1:5, C.I cover withframe (light duty) 455x610mm internal dimensions, total weight of cover with frame to be not less than 38 kg ( weight of cover 23kg and weight of frame 15 kg) R.C.C. top slab with cement concrete M 15 with 20mm and downsize granite metal, foundation concrete M 5 with 40mm and downsize granite metal inside plastering 12mm thick with cement mortar 1:3, finish smooth with a floating coat of cement on walls and bed concrete complete as per standard design including cost of materials, labour charges, curing complete as per specifications. Specification No. KBS 450x450mm and 450mm depth ( clear inside dimension ) for single pipeline, using table moulded non-modular bricks of class designation 50 in cement mortar 1:5, C.I cover withframe (light duty) 450x450mm(11.50.2) etc., complete as per specifications and as directed by the Engineer-in-Charge

6

-

53607

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing to wall, ceiling and floor unplasticised PVC pipes 10.00 kgf/sq.cm working pressure chemp plast / Wavin or equivalent make with pipe fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials,with 110mm outer dia etc., complete as per specifications and as directed by the Engineer-in-Charge

111

-

70629

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) - 32mm nominal OD pipes(13.85.4) etc., complete as per specifications and as directed by the Engineer-in-Charge

180

-

48006

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 13-11.1 : Providing and placing on terrace, polyethylene water storage tanks with manhole lid and suitable locking arrangements, making holes of suitable diameter for inlet, outlet and over flow pipes, including cost of all materials, labour, transport charges, HOM of equipments and testing complete as per specifications.(For 1000 litre capacity) Specification No.KBS 13.22 etc., complete as per specifications and as directed by the Engineer-in-Charge

2

-

14339

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and Fixing Stainless Steel sink of sizes upto 40cms x 47cms in 20mm thick granite slab of by cutting required thickness and width of grooves and fixing using adhesives etc., complete including cost and conveyance of all materials, labour for all items of work, HOM of equipment with all lead and lift, loading and unloading, transportation charges and all other incidental charges etc., complete as per specification and directions of the Engineer-in-charge of the work.. etc., complete as per specifications and as directed by the Engineer-in-Charge

1

-

5709

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 11-15.5 : Providing and fixing 1500x450mm dia rectangular shape mirror with plastic moulded frame of approved make and shade with 6mm thick hard board backing including cost of materials, labour complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

8

-

12440

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB-3.2: Providing and injecting chemical emulsion for Pre-constructional Anti-Termite Treatment, creating continuous chemical barrier under and around the column pits, walls, trenches, basement excavation, top surface of the plinth filling, junction of wall and floor, along the external perimeter of building, expansion joints, over the top surface of consolidated earth on which apron is to be laid, surrounding of pipes and conduits, with chloropyriphos emulsifiable concentrates of 20% concentration, including cost of chemical, diluting in water to one percent concentration, labour, HOM of equipments, complete as per specifications. (Plinth area of the building at ground floor only shall be measured ) Specification No. KBS : 3.2.6 / 3.2.7(3.2) etc., complete as per specifications and as directed by the Engineer-in-Charge

279.48

-

31106

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 15-17.1 : Applying priming coat over new wood surface and / or wood based surface with white lead paint priming including preparing the surface after thoroughly cleaning oil, grease, dirt and foreign matter, sand papering and knotting ready mix paint including cost of materials, labour, complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

36.12

-

1631

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 15-17.6 : Providing and applying painting two coats ( excluding priming coat ) on new wood surface and / or wood based surface with enamel paint to give an even shade, cleaning the surface of all dirt, dust and foreign matter, sand papering including cost of materials, labour, complete as per specifications.(15.60.1) etc., complete as per specifications and as directed by the Engineer-in-Charge

36.12

-

3679

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 15-17.1 : Applying priming coat over new wood surface and / or wood based surface with white lead paint priming including preparing the surface after thoroughly cleaning oil, grease, dirt and foreign matter, sand papering and knotting ready mix paint including cost of materials, labour, complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

663.06

-

60571

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB15-13 : Applying of distemper KSRB 15-13.1 : Providing and applying one coat distemper primer of approved brand on wall surface after throughly brooming the surface to remove all dirt, dust, mortar drops and other foreign matter including preparing the surface, even and sand paper smooth, cost of materials, labour, complete as per specifications. -wall surface- etc., complete as per specifications and as directed by the Engineer-in-Charge

69.3

-

2547

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing applying two coats of wall putty to inside plastered walls and ceiling using white cement putty. Scrapping and levelling the surface using steel blade and preparing the surface even and smooth by using different grade sand papers, including cost of all materials, cost of labour and scaffolding etc., complete as per the specification. etc., complete as per specifications and as directed by the Engineer-in-Charge

563.86

-

46180

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing of wall cladding using 20 mm thick gang saw water cut granite in CM 1:3 proportion cut to required shape patron with paper joint finished with cement mortar using white cement and colour pigments to match the colour of slab making through jointing with sealant, making holes 25mm etc., complete as per specifications and as directed by the Engineer-in-Charge

81.07

-

207957

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing metal fan box with round hook etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

893

... More
Construction of EE Quarters in LLC Colony, Ballari;Manufacturing, supplying and fixing wooden ward robe of 0.60m deep using 19mm thick vinyl bonded water proof block board, shutters allround ward robe, lockable drawers with sliding channels, cupboard drapery hangers, curtain rods with end brackets, openable shutters with 19mm x 6mm thick plain teak wood beading, lipping 1.5mm thick commercial ply vertical support finished in approved 1mm lamination sheet of approved colour, shade and quality on all exposed surfaces. Inner surface painted with 2 coats of white synthetic enamel paint over 2 coats of Patti, one coat of wood primer, including cost of brass fittings, parliamentary hinges, C handles, tower bolts, magnetic catches, approved brand lock, adhesives, synthetic resins, nails, screws etc., complete including cost of all materials, labour charges, complete as per specification. etc., complete as per specifications and as directed by the Engineer-in-Charge

56.03

-

632556

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing storage unit of 0.75m depth made out of 19mm thick commercial ply vertical support finished in approved 1.00mm laminate with 12mm thick ply packing internally finished with enamel paint of approved colour and shade shelves shall be formed out of 19mm ply finished with enamel paint of approved shade and colour and 19mm thick shutters formed out of 19mm thick ply finished with 1.00mm thick laminate of approved shade and colour etc., complete the rate includes cost of all materials, labour charges, complete as per specification. etc., complete as per specifications and as directed by the Engineer-in-Charge

39.92

-

547842

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB 300-2. Earthwork excavation by manual means in hard soil involving an average horizontal throw upto 2 meters and an average lift upto 0.5 m, excavated surface leveled and sides neatly dressed, the disposed earth to be leveled neatly after breaking of clods complete as per specifications. MORTH / Chapter 3 etc., complete as per specifications and as directed by the Engineer-in-Charge

99

-

18607

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M2100 PCC 1 KSRRB M2100-10. Plain cement concrete M10 with OPC cement @ 220kgs, with crushed 40mm and down size graded granite metal coarse aggregates @0.84cum and fine aggregates @ 0.56cum, in foundation mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per specifications MORTH Specification No. 2100 etc., complete as per specifications and as directed by the Engineer-in-Charge

7.84

-

42057

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 5.2-2 : Providing and constructing granite / trap / basalt size stOne Metreasonry in foundation with cement mortar 1:8, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 etc., complete as per specifications and as directed by the Engineer-in-Charge

26.81

-

133293

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 5.2-3 : Providing and constructing granite / trap / basalt size stOne Metreasonry in foundation with cement mortar 1:6, stone hammerd dressed in courses not less than 20 cms high, bond stones at two m. apart in each course including cost of materials, labour, curing complete as per specifications. KBS 5.1.13 etc., complete as per specifications and as directed by the Engineer-in-Charge

14.85

-

75468

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M300-Construction of Subgrade and Earthen Shoulders. KSRRB M300-55. Construction of sub-grade and earthen shoulders with approved material Gravel/Murrum with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No. 300-2 complete as per specifications (including cost of earth, watering charges & compaction by vibratory rollercompaction by vibratory roller to 97% of proctors density) MORTH Specification No. 305 etc., complete as per specifications and as directed by the Engineer-in-Charge

19.8

-

12225

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRRB M1100- Supplying, Fitting and Placing un-coated HYSD bar /MS Bar KSRRB M1100-13. Supplying, Fitting and Placing un-coated TMT bar Reinforcement in Foundation as per Drawing and Technical Specifications complete as per specifications MORTH Specification No.1600 - TMT bars Fe 550(25.27.3) etc., complete as per specifications and as directed by the Engineer-in-Charge

0.68

-

48476

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4.2.1 : Providing and laying in position reinforced cement concrete of Design mix M25 with OPC cement @ 340kgs, with 20mm and down size graded granite metal coarse aggregates @0.70 cum and fine aggregtes @ 0.47cum, with super plasticisers @ 3 liters confirming to IS 9103-1999 reafirmed-2008 at machine mixed, concrete laid in layers not exceeding 15 cms thick, vibrated for all works in foundation for footings, pedastals, retaining walls, return walls, walls (any thickness) including attached pilasters, columnspillars, posts, struts, buttresses, bed blocks, anchor blocks & plinths etc., including cost of all materials, labour, HOM of machinery, curing, complete but excluding cost of reinforcement as per specifications. Specification No. KBS 4.1, 4.6 (4.10) etc., complete as per specifications and as directed by the Engineer-in-Charge

3.8

-

23693

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 4-6.7 :Providing and removing centering, shuttering, strutting, propping etc., and removal of form work for sides and soffits of beams, beam haunchings, cantilever girders, bressumers and lintels not exceeding 1m in depth including cost of all materials, labour complete as per specifications. Specification No. KBS 4.6.2 (4.34) etc., complete as per specifications and as directed by the Engineer-in-Charge

33

-

10118

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 6-1.3 : Providing and constructing burnt brick masonry for basement and superstructure with approved quality of non-modular bricks of standard size of class designation 3.5Newton per sqmm with cement mortar1:6 including cost of materials, labour charges, scaffolding, curing complete as per specifications. Specification No. KBS 6.2 etc., complete as per specifications and as directed by the Engineer-in-Charge

41.75

-

275211.83

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB15-3.7 : Providing 18mm thick cement plaster in single coat with cement mortar 1:3, to brick masonry including rounding off corners wherever required smooth rendering, : Providing and removing scaffolding, including cost of materials, labour, curing complete as per specifications.(15.15) etc., complete as per specifications and as directed by the Engineer-in-Charge

363

-

103673

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 15-15.1 : Providing and applying painting in two coats with plastic emulsion paint of approved brand on wall surface to give an even approved shade after thoroughly brushing the surface, free from mortar drops and other foreign matter including preparing the surface even and sand paper smooth, cost of materials, labour, complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

363

-

33160

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB15-13 : Applying of distemper KSRB 15-13.1 : Providing and applying one coat distemper primer of approved brand on wall surface after throughly brooming the surface to remove all dirt, dust, mortar drops and other foreign matter including preparing the surface, even and sand paper smooth, cost of materials, labour, complete as per specifications. -wall surface- etc., complete as per specifications and as directed by the Engineer-in-Charge

363

-

13340

... More
Construction of EE Quarters in LLC Colony, Ballari;Concealed conduit system supplying heavy gauge PVC conduit pipe 25mm dia 2mm thick confirming to IS 2509 with suitable size bends, metal/PVC junction boxes, adhesive paste etc., And running before concreting the slab. The conduit should be tied to the reinforcement rods by using binding wires and unused ways of junction boxes and pipe ends should be covered using PVC end enclosures, run with 18 SWG GI fish wire wherever necessary etc., complete as per specifications and as directed by the Engineer-in-Charge

400

-

21200

... More
Construction of EE Quarters in LLC Colony, Ballari;Concealed conduit system Supplying heavy gauge PVC Conduit Pipe 25 mm dia 2mm thick with suitable size bends, metal junction boxes adhesive paste etc., by groove cutting in the wall and fixing by bracing U or J hooks and cement plastering up to the wall surface and run with 18 SWG GI fish wire run throughout the conduit wherever necessary etc., complete as per specifications and as directed by the Engineer-in-Charge

400

-

21600

... More
Construction of EE Quarters in LLC Colony, Ballari;Wiring for lighting/power circuit using one of FRLS PVC insulated 1100V grade, multistrand copper wire 1.5 Sqmm with low conductor resistance single core in open or concealed system of wiring with specified IS-694:confirming to latest amendments etc., complete as per specifications and as directed by the Engineer-in-Charge

600

-

12300

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and drawing Flexible Multicore Cable manufactured with electrolytic grade flexible copper with low conductor confirming to IS:8130-1984 and (Virgin) PVC insulation sheathed suitable for working voltage upto 1100Volts as per IS-694:1990 (3C 2..5 Sqmm)

200

-

18000

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall 1-3 Way

20

-

1900

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall (8way) etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

2900

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in brick/stone/C.C wall (10-12W) etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

3300

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and flush mounting powder coated / galvanized metal box suitable for mounting modular switch plates. The box should be firmly flush mounted after due groove cutting in Brick/Stone/C.C wall - 1 to 3 module

20

-

2200

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., Complete on the existing metal/PVC box. (8 module) etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

4000

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing superior quality modular switch mounting polycarbonate plate with necessary supporting back plate with required nos. of machine screws, bolts nuts etc., Complete on the existing metal/PVC box. 10-12 module etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

4600

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6amps one way Switch ) etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

7000

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6amps two way Switch ) etc., complete as per specifications and as directed by the Engineer-in-Charge

50

-

4750

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.(6amps 3way socket. ) etc., complete as per specifications and as directed by the Engineer-in-Charge

15

-

1575

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing of modular switch & connected accessories on existing modular switch plate as per IS 3854 and IS 1293.Stepped fan regulator. etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

2900

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing 32Amps security and energy saving DP switch with key tag suitable to operate on 230 Volts,50Hz AC supply & completely wired on existing box. etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

6800

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing/replacing of 6/16/32amps electrical accessories on existing switch board. Group a (6amps bakelite ceiling rose) etc., complete as per specifications and as directed by the Engineer-in-Charge

30

-

1740

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing/replacing of 6/16/32amps electrical accessories on existing switch board.(6 amps lamp holder ) etc., complete as per specifications and as directed by the Engineer-in-Charge

30

-

1740

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing miniature circuit breakers on existing MCB distribution boards using necessary fixing materials and 'C' Type curve, indicator ON/OFF, energy cross-3 with Short circuit breaking capacity of 10K and complete wiring as required confirming to IEC 60898.(6-32amps SP) etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

8680

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying of Ceiling Fan with Capacitor rating As per guideline of BEE 5 star rating and IS:374/79 and also comply with IS:1709/1984 with latest amendment, Rated voltage 220 V/ 50 Hz, Rated power input 48 W +/- 10 %, Rated current As per IS:374/79, Rated power factor 0.9 lagging(min), Rated speed 350 +/- 10% RPM, Rated air delivery 210 +/- 10% Cubic Meter Minimum, Rated service value ? 4.2 CMM / Watt, Three Blades of blade leaf 1.05 mm thick Aluminium Alloy sheet, Class B motor insulation, Bearing Two ball bearings, Top 6202, Bottom 6201 , as per IS specification, Motor wdg. Temp rise Shall not exceed 75 deg C over and ambient of 40 0C by resistance method at 245 Volts, Insulation resistance Shall not be less than Two Mega Ohms (2 M Ohms), Leakage current Should not exceed 210 Micro Amp, Power input, watt& current , Air Delivery & Fan Speed as per IS:374/1979 with latest amendment, 2 year manufacturer Warranty. etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

40000

... More
Construction of EE Quarters in LLC Colony, Ballari;Fixing a ceiling / wall mounting fan of all capacities and all types to the existing 's' hook with fan regulator to the existing board together with supplying and fixing 5 amps. Ceiling rose, necessary length of 23 / 0.0076 Inch PVC insulated twin twisted copper wire and wiring. etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

1500

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying of 2x4'feet - PVC Batten with integrated LED tube 20/22W with high quality diffuser with Life of 25000 burning hours & 70% lumen maintenance with CRI > 80. Power Input: 220-240V @ 50/60Hz & Power factor >0.9 along with CE approved. 2 years Warranty against any manufacturing defect working under standard electrical condition. LED light fighting etc., complete as per specifications and as directed by the Engineer-in-Charge

20

-

12500

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying of 1.1 KV LT UG cable XLPE or Heat resistant PVC insulated, PVC extruded Inner sheath armoured UG LT cable as per IS-1554 (Part-1) or IS-7098 Part-1, Armouring strip thickness in average +5% and resistivity 14 Ohms/Kms (Max) as per IS-3975 etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

9500

... More
Construction of EE Quarters in LLC Colony, Ballari;Digging of trench of 0.6m deep x 0.50 mtr wide refilling the trench to the required ground level and consolidating etc., complete.(As per Civil SR KSRB I-2, P-7) In soil (Ordinary) etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

7600

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and filling sand in excavated trench to cover already laid UG cable to a depth of 150mm all-round the cable. etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

10000

... More
Construction of EE Quarters in LLC Colony, Ballari;Labour charges for laying of 1.1 KV class UG cable in existing trench GI pipe / stoneware pipe / on wall / on pole as required 6 sqmm to 16 sqmm etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

1188

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing of class A (medium duty) GI pipe of wall thickness not less than 3.25mm on pole/wall/drain crossing with necessary clamping arrangements for UG cable of 1.1 KV.40mm etc., complete as per specifications and as directed by the Engineer-in-Charge

100

-

33500

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying and fixing L.T. cast Iron pot heads suitable for 1.1 KV class UG cable filled with necessary bitumen/insulating compound complete with terminals, clamps, bolts, nuts and washers etc. 10sqmm etc., complete as per specifications and as directed by the Engineer-in-Charge

50

-

13000

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying, fixing and wiring Electronic Trivector Meter (ETV) 5 to 32/63 Amps three phase 4 wire whole current class-1 Accuracy Energy Meter etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

47450

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying, fixing, wiring, earth electrode for grounding conduits, I.C. cutouts and other equipment's on the meter board using 40mm dia 2.90mm thick GI pipe 2.5 mtr long buried in a pit.The pit should be filled with equal proportion of salt and charcoal 150mm all-round the pipe to complete depth. The connection from the pipe to the conduit etc., is to be established through GI wire of size as per ISI specification 7.3.3. of IS 732 using 12mm dia bolts, nuts,washers and check nuts etc., the pipe shall have 16 through holes of 12 mm dia etc., complete as per specifications and as directed by the Engineer-in-Charge

2

-

5999

... More
Construction of EE Quarters in LLC Colony, Ballari;Fabricating, supplying and erection of ?Mtrs long hot dip Galvanized Octagonal pole with BSEN 10025 grade S 355 JO steel plate for shaft, IS 2062 for base plate with door opening arrangements, including suitable boards, Bakelite sheet and MCBs as per IS specifications suitable to withstand the wind speed of 47 m/sec for ??.Mtrs pole in single section and single joint welded as per IS 9595/IS 10178AWS having dimensions bottom ?..mm, top?.mm with 3mm thick, suitable base plate and 4Nos of ..... long J bolts along with template and the pole shall be hot dip galvanized in single dipping with not less than 65micron as per ASTM-A123 and 153 etc., (excluding foundation) as per drawing appended etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

76510

... More
Construction of EE Quarters in LLC Colony, Ballari;Supply of LED Streetlight luminaire with pressure die cast aluminium housing body for optimal thermal dissipation Lamp compartment comprising of anti glare clear diffuser with Injection moulded polycarbonate material, delivering superior light output. Rated life Burning Hrs 50000 hr @ Lumen Maintenance of 70%, maximum light intensity should be between 60 degrees to 70 degrees. CCT > 5500K, IP 66 optical and electrical compartment & impact resistance of complete luminaire > IK08. Power Factor >0.9 with mains, Surge Protection- Min 5KV along with Over voltage/ Overload, short circuit/ miss-wiring protection. Compatible for pole mouting with outer dia of 40mm to 50mm. Universal Voltage driver to operate wide voltage range from 100V to 270V 50/60Hz application. Compliance to IS 10322/IEC 60598, LM 79 & LM 80 Adherence with RoHS. UL approved MCPCB. Top access street light with single screw to ensure ease of maintenance at the sight site location with minimized minimal tools. LED Light fixture with ........W System Power consumption. LED Efficiency>130lm/w, nominal CRI >75 Luminaire manufacturer should have in-house facility accredited by NABL/CPRI & any Government certified agency & Design & Development facility certified by ISO 9001:2008 . Housing with supplier word mark /name shall be Engraved / Embossing on the die cast housing/ Body part. Warranty of 2 Years against any manufacturing defect working under standard electrical conditions as mentioned above should be given by LED manufacturer & Cree/Nichia/ Lumileds/Osram make LED Source etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

33600

... More
Construction of EE Quarters in LLC Colony, Ballari;Supplying ...litres capacity vertical/horizontal type wall mounting Electrical water heater with 22 SWG copper/SS sheet metal inner Container tinned inside Fiber body outside, filled with glass wool between inner and outer container for thermal insulation complete. The inlet and outlet pipes so arranged that water flow inside results in water to flow out from the inner container without turbulence. The Inner container shall have direct immersion type copper tube nickel plate .2KW capacity element with a neon indicator fitted with 20A capacity 25 to 85 degree Centigrade range thermostat The water heater shall completely be wired with 40/0.0076 inch 3 core copper flexible wire of 1.5 meters length and the outer container provided with heavy gauge brackets for wall mounting.

2

-

28600

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing CI Nahani trap of approved make conforming to ISI specifications and construction of Cistern in M-15 as per directions (Rate is inclusive of cost of materials and fixtures and conveyance of materials to work spot). - 10cms x 7.5cms etc., complete as per specifications and as directed by the Engineer-in-Charge

8

-

2100

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-9.3 : Providing and fixing to wall, ceiling and floor high density polyethylene pipes 50 mm dia 6.00 kgs/sq.cm working pressure of outside diameter raising mains & exposed distribution pipes with special flange, compression type fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM and testing complete as per specifications. Specification No.KBS 13.2.15.2 / 13.9 for internal water supply connection etc., complete as per specifications and as directed by the Engineer-in-Charge

75

-

25830

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-10.4 : Providing and fixing to wall, ceiling and floor unplasticised PVC pipes 10.00 kgs/sq.cm working pressure 32mm outside diameter chemp plast / Wavin or equivalent make with pipe fittings, wall clips, making good the wall, ceiling and floor, including cost of all materials, labour charges, HOM of equipments and testing complete as per specifications. Specification No.KBS 13.2.15.4 / 13.9 etc., complete as per specifications and as directed by the Engineer-in-Charge

75

-

10159

... More
Construction of EE Quarters in LLC Colony, Ballari;Providing and fixing Chorinated Poly Venyl Chloride (CPVC) pipes conforming to IS 15778, having thermal stability for hot and cold water supply including all CPVC plain and brass threaded fittings including fixing the pipe with clamp at 1.00 mtr spacing. This includes jointing of pipes and fittings with one step CPVC solvent cement and testing of joints complete. (internal work exposed on wall) - 25mm nominal OD pipes etc., complete as per specifications and as directed by the Engineer-in-Charge

75

-

15435

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-6.3-6 : Providing and fixing in position brass gate valve with C.I wheel of approved quality ( screwed end ) 50 mm dia nominal bore including cost of all materials, labour and HOM with all leads complete as per specifications. Specification No.KBS 13.2.6 / 13.3 etc., complete as per specifications and as directed by the Engineer-in-Charge

8

-

14608

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-6.1-3 : Providing and fixing in position brass bib cock of approved quality 25mm dia nominal bore including cost of all materials, labour and HOM with all leads complete as per specifications. Specification No.KBS 13.2.2 / 13.3 etc., complete as per specifications and as directed by the Engineer-in-Charge

25

-

6195

... More
Construction of EE Quarters in LLC Colony, Ballari;Constructing brick masonry inspection chamber 455 x 610 mm, and 450mm depth, ( clear inside dimension ) for single pipeline, using table moulded non-modular bricks of class designation 50 in cement mortar 1:5, C.I cover withframe (light duty) internal dimensions, total weight of cover with frame to be not less than 38 kg ( weight of cover 23kg and weight of frame 15 kg) R.C.C. top slab with cement concrete M 15 with 20mm and downsize granite metal, foundation concrete M 5 with 40mm and downsize granite metal inside plastering 12mm thick with cement mortar 1:3, finish smooth with a floating coat of cement on walls and bed concrete complete as per standard design including cost of materials, labour charges, curing complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

2

-

14874

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 12-1.3 : Providing and laying in position to required level or slope 200mm internal diameter salt glazed stoneware pipes grade A and jointing with stiff mixture of cement mortar in proportion of 1:1, testing of pipes and joints,including cost of materials, labour charges complete as per specifications. Specification No. KBS 12.2.5 / 12.7 200mm etc., complete as per specifications and as directed by the Engineer-in-Charge

75

-

38351

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 12-2.3 : Providing and laying in position plain cement concrete M7.5 40mm and down size graded granite metal, machine mixed concrete laid in layers not exceeding 15 cms thick, well compacted, for 200mm internal diameter stoneware pipes including cost of materials, labour charges, HOM,curing complete as per specifications. Specification No. KBS 4.1/4.2 etc., complete as per specifications and as directed by the Engineer-in-Charge

25

-

11944

... More
Construction of EE Quarters in LLC Colony, Ballari;Earth Work excavation for foundation of buildings, culverts, water supply,sanitary lines and electrical conduits either in pits or in trenches 1.5m and above in width, in ordinary soil not exceeding 1.5m . in depth including dressing the bottom and sides of pits and trnches, stacking the excavated soil clearfrom edges of excavation with lead upto 50m including breaking of clods complete as per specifications KSRB 2-2.1 in Ordinary soils No.KBS 2.1(a)/2.3.5 etc., complete as per specifications and as directed by the Engineer-in-Charge

45

-

14128

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB 2-4 : Refilling available earth around pipe lines, cables in layers not exceeding 20cms in depth, compacting each deposited layer by ramming after watering with lead upto 50m. and lift upto 1.5 m. including cost of all labour complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

27

-

3430

... More
Construction of EE Quarters in LLC Colony, Ballari;Constructing brick masonry inspection chamber 600x600mm and 450mm depth ( clear inside dimension ) for single pipeline, using table moulded non-modular bricks of class designation 50 in cement mortar 1:5, C.I cover withframe (light duty) 600x600mm internal dimensions, total weight of cover with frame to be not less than 38 kg ( weight of cover 23kg and weight of frame 15 kg) R.C.C. top slab with cement concrete M 15 with 20mm and downsize granite metal, foundation concrete M 5 with 40mm and downsize granite metal inside plastering 12mm thick with cement mortar 1:3, finish smooth with a floating coat of cement on walls and bed concrete complete as per standard design including cost of materials, labour charges, curing complete as per specifications. etc., complete as per specifications and as directed by the Engineer-in-Charge

10

-

89345

... More
Construction of EE Quarters in LLC Colony, Ballari;KSRB13-6.7-2 : Providing and fixing in position chromium plated brass shower rose with 15 or 20mm inlet 150mm dia including cost of all materials, labour and HOM of equipments with all leads complete as per specifications. Specification No.KBS 13.2.16 / 13.3 etc., complete as per specifications and as directed by the Engineer-in-Charge

5

-

3938



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.