Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Civil And Construction
Building Construction
Opening Date19 Sep 2022
Closing Date4 Oct 2022
Tender Amount₹ 3,56,19,052 
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Filling with Gravel in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating No deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

278.84

-

133425

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

28.79

-

19204

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course.

35

-

153732

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed

42.84

-

182366

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work for flooring in sprtic tank (APSS No. 402)

1.21

-

6496

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for GROUND FLOOR

0.94

-

5875

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for FIRST FLOOR

0.94

-

5993

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for SECOND FLOOR

1.79

-

12378

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including , sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts Ground Floor.

0.65

-

3456

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including , sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts First Floor.

1.19

-

6438

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including , sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts Second Floor.

1.14

-

6733

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.

80.14

-

790374

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal and columns below plinth beam

1.94

-

20317

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam.

25.58

-

318812

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns super structure GROUND FLOOR

19.35

-

233385

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns FIRST FLOOR

26.7

-

343403

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including , sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns SECOND FLOOR

38.88

-

546186

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete (1:5:10) proportion nominal mix (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed Graded metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, sales & other taxes on all materials, all operational, incidental, and labour charges such as mixing, laying concrete, finishing top surface, curing concrete, etc., complete for finished item of work for (APSS No. 402) Dummy Columns Second Floor

8.04

-

62251

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Ground Floor

22.2

-

225948

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams First Floor

42.5

-

457039

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Second Floor

63.29

-

741499

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick GROUND FLOOR

414.43

-

513417

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick First FLOOR

721.02

-

943707

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick SECOND FLOOR

881.1

-

1256228

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 130mm thick FIRST FLOOR

30.55

-

40987

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 130mm thick SECOND FLOOR

30.55

-

44646

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 135mm thick FIRST FLOOR

86.73

-

119210

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 135mm thick Second FLOOR

324.29

-

485495

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick slab GF

21.36

-

33604

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick slab FF

21.36

-

35311

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick slab SF

42.3

-

76227

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels GROUND FLOOR

1.39

-

16149

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels First FLOOR

3.43

-

42132

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels SECOND FLOOR

4.6

-

61341

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work GROUND FLOOR

26.16

-

22419

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work FIRST FLOOR

45.42

-

41736

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work SECOND FLOOR

54.6

-

53628

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Shelves of 25mm thick for First Floor.

6

-

4028

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Shelves of 25mm thick for Second Floor.

6

-

4340

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 500 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)

95.9

-

8311658

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Brick Masonry in superstructure with CM (1:6) prop with Flyash Cement solid blocks of size 290 x 200 x 140 mm, for manufacturing of flyash solid blocks using flyash of 80 kgs, cement of 15 kgs. Gypsum of 5 kgs. and stone dust with a compresive strength not lessthan 50 kg/sqmm including cost and conveyance of all materials, labour charges, scaffolding and curing etc., for Superstructure Walls.For Basement

33

-

231916

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. GROUND FLOOR

122

-

932245

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. FIRST FLOOR

173.45

-

1397044

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. SECOND FLOOR

289.12

-

2448109

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for parapet , partitions etc., GROUND FLOOR

79.23

-

79537

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for parapet , partitions etc., FIRST FLOOR

71.24

-

78017

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges for parapet , partitions etc., SECOND FLOOR

101.23

-

120094

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of Door size 1.2 x 2.1 M /1.5X2.1 M double Leaf with Door Frame of MS L angle section 40x40x6mm , flush door shutter solid bond wood block board type with commercial ply on both faces 30mm thick Hardware fixtures ie., MSPC Butt Hinges 150mm Long 6 nos, MSPC Handles 150 mm Long 2 No, MSPC Tower Bolt 200mm long 1 No, MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos, Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.

101.42

-

357708

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing and fixing factory made solid Wood polymer Composite (WPC) Single extruded Door frame Section of size 45x75mm. The two vertical members are to be joined togather with thehorizontal member using 8x50mm long MS Star full thread screw to be used reverse forward speed control hand drilling machine. The Ready/Assembled door frame is fixed to the wall using hold fast or bolt fasteners.A minimum of 4no's of screws to be provided for each vertical member & minimum 2no's for Horizontal member with encapsulation of 8mm rigid layer on the six surfaces. The Door frame will have a rebat of 32mm complete for finished item of work

173.7

-

99858

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing and fixing 28 -30 MM thick solid Wood Polymer Composite (WPC)single extruded door shutter with 3MMtop and bottom rigid layer with an overall density of 750kg/Cum. It will be fixed tothe frame using 3 inch /4 inch hinges. Aminimum of 4 hinges will be required for fixing the door with the frame including all fixtures like hinges, aldrops, tower bolts and handles.

72.44

-

249375

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing & Fixing of Openable Windows(5'0"x4'0") with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for 0.5mm thick G.I profile sheet, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined(5'0"x4'0") with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for finished item of work

105.75

-

789614

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing & Fixing of Openable Windows(4'0"x4'0") /(3'0"x4'0") with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for 0.5mm thick G.I profile sheet, fly mesh and a 20 mm provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for finished item of work

52.34

-

430237

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) GROUND FLOOR

355

-

140498

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for FIRST FLOOR

836.91

-

361725

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for SECOND FLOOR

1263.98

-

592364

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Basement

150

-

55688

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering with CM(1:4) Prop: 20mm thick in single coat including mixing of Accoproof powder 1kg per 1 bag of cementspong finish including cost and conveyance of all materials like cement, sand, water etc., to site, including sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for Toilets block GROUND FLOOR

60

-

23042

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for steps First Floor

90

-

37333

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 20mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for steps Second Floor

90

-

40104

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Ground FLOOR

586

-

219750

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) FIRST FLOOR

1105.3

-

448509

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) SECOND FLOOR

1736.75

-

758204

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) GROUND FLOOR

469

-

239202

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) FIRST FLOOR

917.6

-

505258

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) SECOND FLOOR

1510.6

-

893127

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work SECOND FLOOR

818.07

-

488101

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work. Ground Floor

282.01

-

286039

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work. FIRST Floor

630.6

-

663643

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, etc., complete for finished item of work. Second Floor

948.15

-

1033967

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Polished Granite stone minimum 16 to 18 mm thick of size up to 2.43m black set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, labour charges for dressing of flooring stones etc., complete for finished item of work for steps Ground Floor

29.6

-

95588

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Polished Granite stone minimum 16 to 18 mm thick of size up to 2.43m black set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, labour charges for dressing of flooring stones etc., complete for finished item of work for steps FIRST Floor

43.55

-

143705

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring and Treads with Polished Granite stone minimum 16 to 18 mm thick of size up to 2.43m black set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, labour charges for dressing of flooring stones etc., complete for finished item of work for steps SECOND Floor

62.54

-

210773

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Non-skid red or white full body Ceramic floor tiles of any size and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.GROUND FLOOR

37

-

34893

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Non-skid red or white full body Ceramic floor tiles of any size and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work. FIRST FLOOR

48.32

-

47410

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Flooring with Non-skid red or white full body Ceramic floor tiles of any size and thickness between 7-8 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete for finished item of work.SECOND FLOOR

48.32

-

49252

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete for finished item of work FIRST FLOOR

44.42

-

18844

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete for finished item of work SECOND FLOOR

44.42

-

19971

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to internal walls to 15 cm height and risers of steps with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work.GROUND FLOOR

16.94

-

17059

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to internal walls to 15 cm height and risers of steps with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work. FIRST FLOOR

40.1

-

41909

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to internal walls to 15 cm height and risers of steps with Nano polished /stain free soluble salt porcelain vitrified tiles screen printed of size 600 x 600 mm and thickness between 8-10 mm 1st quality Corming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work. Second FLOOR

61.5

-

66619

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to internal wall to 15cm height and risers of steps with ceramic tiles 7.3mm thick set over base coat of cement mortar (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & joined neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, water and tiles etc., to site etc., complete for finished item of work.FIRST FLOOR

0.48

-

304

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to internal wall to 15cm height and risers of steps with ceramic tiles 7.3mm thick set over base coat of cement mortar (1:3), 12mm thick with cement slurry of honey like consistency spread @ 3.3 Kgs per sqm & joined neatly with white cement paste to full depth mixed with pigment of matching shade, including cost and conveyance of all materials like cement, sand, water and tiles etc., to site etc., complete for finished item of work. SECOND FLOOR

0.48

-

309

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to Internal Walls and Risers of Steps to 15cm height with High polished Granite 16 to 18 mm thick set over base coat of cement mortar (1:3), 12mm thick, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work .Ground Floor

11.39

-

18543

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to Internal Walls and Risers of Steps to 15cm height with High polished Granite 16 to 18 mm thick set over base coat of cement mortar (1:3), 12mm thick, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work . FIRST Floor

13.33

-

22251

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing Skirting to Internal Walls and Risers of Steps to 15cm height with High polished Granite 16 to 18 mm thick set over base coat of cement mortar (1:3), 12mm thick, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like cement, sand water and tilesetc., complete, labour charges for dressing of tilesetc., complete for finished item of work . SECOND Floor

18.07

-

30909

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Dadooing to walls with red or white full body ceramic wall tiles of any size and thickness 6 mm 1st quality conforming to IS:13711,IS:13712,IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqmt. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, sales and other taxes on all materials, and all opertional, incidental and all labour charges such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work in all floors

395.48

-

226217

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Half Rounding the edges of Marble/ Granite stone slabs of all thicknesses including polishing the same.ALL Floors

291.98

-

112135

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supplying and fixing of stainless steel hand railing with top rail of 50mm dia pipe-1No., 20mm dia 3Nos at middle of 2mm thick medium class and vertical posts of 40mm dia 1.6mm thick medium class 1Nos for every 3rd step fixed with base plate of 75mm dia using bonding agent and anchor fastner and welding, drilling of 25mm dia holes with pneumatic compressor for fixing railing, buffing, polishing all members of the railing thouroughly, lacquer finishing to present seamless finish including cost and conveyance of all materials, electrodes, welding charges, cost of all consumables, labour charges, overheads & contractors profit etc., complete for finished item of work.

51.9

-

278148

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Green Chalk Boards - Supply and fixing of ceramic steel / Porcelain enamel Steel Green Chalk Boards of size 2400mmx 1200mm with vitreous enamel steel sheet thickness 0.3mm to 0.40mm with Ceramic steel (Belgium make)/ Porcelain enamel steel 0.3mm to 0.4mm (Japan make) engraving on surface (having vitreous enamelled coating both sides) 0.095mm thick top surface coating and back surface coating thickness of 0.03mm, supported with 9mm thick MDF Board (make: Greenlam /Merino / Century / Kitply / Greenply / ASIS of ISI standards and water proofing) for back support and it backing with 0.25mm thick galvanized iron sheet (make: TATA/JSW/Sail/Vizag Steel), fixed with anodized aluminium frame 20mm wide and 1.2mm thick and board shall be given additional support on all four sides with Aluminium J-Clamps (8 Nos.).Cost includes production cost for complete finished item of work, conveyance of all materials to work site, all labour charges like loading, unloading, Fixing etc.,

22

-

192015

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for ceiling

2540.62

-

107316

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)

2937.59

-

401495

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Painting to New External Walls with two coats of Polymer Plastic Emulsion paint or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)

3344.89

-

706474

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

201.6

-

40766

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5mm thick including cost of necessary PVC bends, shoes and pipe clips and all other accessories and fixing in position including cost and conveyance of all materials to site sales and other taxes on all materials, all operational, incidental and labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practicesuch as fixing in alignment etc., complete for finished item of work. (APSS NO. 1328)

131

-

37381

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Construction of 50.8mm thick RCM Baffle wall with 2.267Kg. Steel and rabbit wire mesh in CM(1:3) prop.; with fine rendering in neat cement in septic tank including cost and conveyance of all materials to site, , sales and other taxes, on all materials, and all labour charges etc., complete for finished item of work.

11

-

2775

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and Fixing of 50mm thick Cement Jali including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work in All Floors.

2.88

-

1155

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supplying & Fixing of ISI mark 25mm dia 2.2mm thick PVC conduit pipe concealed in roof slab with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary, including necessary masonery work for light/fan point and seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.

1111.31

-

102574

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of ISI mark 25mm dia 1.8mm thick PVC conduit pipe concealed in wall with all required acessories including No.14 SWG GI wire for earth continuity including chiseling the wall wherever necessary , including necessary masonery work for light/fan pointand seperate plug point with teak wood deep box including cost and conveyance of all materials to site and labour charges, sales tax etc., complete for finished item of work.

664

-

69195

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of batten holder / slanting holder in lieu of ceiling rose of light point complete with all connections and all labour charges with 0.5W bulb (for new installation).

39

-

6048

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Wiring with 2 runs of 14/0.3mm (1.0 Sq.mm) P.V.C. insulated F.R flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for light,forlight point/fan/exfan/wall lights etc

437

-

271255

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

67

-

10352

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 6A / 10A 3/2 Pin 2 Module Modular Socket with shutter with 6A / 10A 1 Way 1 Module Modular Switch control on a Common switch board with with 3 Module Hot Dip Galvanized Modular Metal Box covered with 3 Modular Cover Frame with earth continuity including wire leads, earth connections along with all labour charges etc., complete.

7

-

1972

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.

850

-

474751

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

921

-

96871

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and run of 1 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

635

-

41256

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and run of 2 of 56/0.3mm (4 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

690

-

104666

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing 8 way SPN Distribution board with IP-30 protection (Metal Door) suitable for single phase ELCB / RCCB/DP Isolator as incomer and 6 nos10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., complete

11

-

49816

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing Distribution board with 20A single phase plug and Socket, in sheet steel enclosure with 10/16/20A SP MCB including internal connection and labour charges for surface / flush mounting etc., complete

25

-

8004

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and Run of No.8 SWG G.I wire including cost of all accessories and labour charges etc., complete.

550

-

32368

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 1x36/40W Box type tube light luminaire powder coated CRCA sheet steel housing with Electronic ballast Chokes and all standard accessories of suitable 36/40W tube on teak wood round blocks with all accessories including giving connection and all labour chrges etc., complete for finished item of work.

88

-

92885

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply, transportation and fixing of 16W/20W, 1600/2000 lumens, ,1200mm length LED batten light, input voltage AC 220 - 260 Volts with PF>0.9, Surge protection: 2KV,THD<15%, with inbuilt driver and frosted cover CCT: 3000K - 5700K, minimum CRI>70, .etc., complete.

32

-

27443

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and errecting ceiling fan with 3 blades and double ball bearings and with condenser AC 250V 50 C/S of 48" 1200mm sweep completely erected in position with out regulator, canopy down rod up to 301.80 mm in length is provided with hook/clamps nuts and bolts and 24/02 flexible copper wire etc., complete and pointed with lettering by enamil paint the Sl. No. and date of errection including cost and conveyance of all materials and labour chargers etc., complete.

95

-

271043

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of electronc type modular socket (humfree) regulator with cost and conveyvance of all materials and labour charges etc. Complete with connections including twincote flexible copper cable make.

104

-

58662

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and run of 2 of 84/0.3mm (6.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.

530

-

83740

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of three phase energy Meter,415V AC,50 HZ as per IS13010 with 2.5-5 /5-10/10-20 Amps range with 200% over load capacity complete with connections etc., complete on the existing board.

3

-

19161

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply of Integral street light luminaire of 150W HPSV lamp fitting comprises of single piece die cast Aluminium body with copper wound ballast and capacitor, Ignitor, with pot optics including 150W HPSV lamp etc., complete.

12

-

73257

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing TPN Distribution board with IP-43 protection (Metal Door) suitable for 3 phase ELCB / RCCB / FP Isolator as incomer and 10kA SP MCBs as outing going including internal connection and labour charges for surface / flush mounting etc., comp

4

-

28395

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 25mm PPR Ball Valve conforming to DIN Standards 8077/8092 cluding cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work.

2

-

489

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 28.60mm ODPipe - SDR 13.5

136.1

-

19952

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply & fixing bib cock cum health faucet with 1 m long flexible tube and wall hook including cost and conveyance of all materials to site, etc., complete for finished item of work for all floors.

2

-

8948

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and Fixing European Water Closet of 1st quality conforming to IS:2556-part-2-1973 of Hindustan / Neycer or Parryware make white glazed with 'S' trap including cost of plastic sheet and lid for European Water Closet with rubber or plastic buffers as per IS:2548-1996 and PVC low level single flush 10 litere capacity system with internal components and short bend of make Parryware slim line including cost and conveyance of all materials to site, labour charges for fixing etc., complete for finished item of work. for all floors

2

-

8867

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing and placing on terrace (at all floor levels) polyetheylene water storage tank with double layer approved brand and manufacture with cover and suitable locking arrangement and making necessary holes for inlet and outlets and over flow pipes but without fittings and base support for tanks including cost and conveyance of all materials and labour charges , Overheads & Contractors profit complete for finished item of work.

2000

-

11400

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supplying and fixing NP bib taps of size 12.70mm dia 400 gms of Indian make Seiko/Senior/Nice as approved by the Engineer-In-Charge including cost and conveyance of all materials, labour charges , Overheads & Contractors profit complete for finished item of work in all floors.

10

-

4159

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supplying & fixing CI Nahani traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs with N.P. Cover for all floors, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (APSS No 1326) for All Floors.

2

-

686

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.

6

-

23130

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 75 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm ncluding Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

49.3

-

8346

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing of 110 mm dia 3 M Single Socket PVC/SWR pipe - 4 Kg/sq.cm ncluding Labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practice

112.25

-

27552

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and transportation and Fixing of 60W LED Street light Luminaire made of pressure diecast alluminium body with powder coated, having protective toughned glass, Supply Input voltage 120 - 270 V AC, P.F > 0.90, high power LED's having efficacy >120 lumines/watt, System efficacy >95lm/W and junction temprature < 70??C, with Ingrees protection IP65, Driver surge protection 4KV, external Surge protection . 5KV with optics distribution Type II medium, THD<10% at 110 Volts AC, driver efficiency >90%, CCT: 3000K - 5700K, minimum CRI>70, etc., complete.

5

-

35609

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Supply and fixing TPN - Vertical type Distribution board with IP -42 Protection (Metal Door) with 125A, 4Pole 25 kA MCCB as incomer with 4Nos 32A TP MCBs as outgoing including internal connection and labour charges for surface / flush mounting etc., complete.

2

-

51922

... More
Providing Additional Infrastructure Facilities to Hostel Converted to Residential School for Boys at;Providing independent earthling by excavating a trench to a depth of 2.1 M in all soils, as per size specified in the Data, using 40mm dia 'B' class GI pipe of 2.5 Mtrs length with necessary accessories with hume pipe ring duly providing staggered holes including filling with equal proportion of Salt and Charcoal in layers and all labour charges etc., complete for small quarters.

3

-

12893



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.