Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Works
Civil And Construction
Water Storage And Supply
Opening Date29 Jul 2024
Closing Date12 Aug 2024
Tender Amount₹ 11,79,849 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials etc complete.

0.48

2195

4572.7

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Bottom slab

0.48

5117

10660

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Side Walls

0.6

9214

15357.1

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Cover Slab-75 MM THICK

3.08

3052

990.75

... More
Cement plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete.Walls

6.8

2775

4081.15

... More
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.

0.05

4507

90147.85

... More
FILTER TANK

-

-

-

... More
Earth Work excavation and depositing on bank with an initial lead of 10 m and 2 m lift in loamy clayey soils including all labour charges.For foundation

1.76

510

289.5

... More
Filling the Foundation with sand including cost,conveyance ,watering and ramming etc complete.

0.53

516

972.85

... More
CC(1:4:8) mix using 40mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.For foundation

0.53

2424

4572.9

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Bottom slab

0.7

746

1066

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Side Walls

2.04

31328

15357.1

... More
Cement concrete(1:1.5:3) prop using 20mm gauge HG metal including cost and conveyance M20 grade of all materials and labour charges ,seign. charges etc.complete. For Cover Slab-75 MM THICK

3.52

3487

990.75

... More
Cement plastering with CM(1:3),12mm thick including cost and conveyance of all the materials etc complete in and out side wall

21.76

8880

4081.15

... More
Filling with 40 mm HBG metal including cost and conveyance of all materials and all labour charges etc complete at bottom

0.43

636

1479.8

... More
Filling with 20 mm HBG metal including cost and conveyance of all materials and all labour charges etc complete.Above 40 mm layer

0.65

1366

2101.8

... More
above 20mm layer

0.65

1366

2101.8

... More
Painting with plastic emulsion paint including cost and conveyance of all materials and all labour charges etc., complete side walls -outer for slab

15.49

3525

2276

... More
S & F 65 Mm Nominal Bore Gi Pipe Medium Grade Properties & Weight As Per Is 1239 With Gi Fittings Such As Elbows Tees Couplings, Nipples, Plugs Including Excavation For Trenches And Refilling The Trenches Complete Except For Gi Bends Union And Gi Connectors With Checkout And Socket Tata Or Zenith Make Or Equivalent.

10

9510

951

... More
Cost ,supply of steel FE 415 including fabrication charges and labour charges etc. complete

150

13522

90147.85

... More
GRAVITY MAIN

-

-

-

... More
Construction of pipelines for water supply with 63mm dia, 6Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and CED and including Overheads and contractors profit @ 13.615%. 50 mm dia HDPE 6 Kg/cm2 (Manually)Trench depth upto 0.50mts

2900

388803

134.07

... More
Supply and fixing of 50 mm dia Nominal Bore Gi pipe Medium Grade properties & weight as per IS 1239 ISI mark with GI fittings including the cost of pipe & its fittings & labour charges etc complete for pumping main inclding contractor profit @13.615% and excluding GST etc complete. 40 mm dia Nominal Bore Medium Grade Gi pipe

90

45401

504.45

... More
DISTRIBUTION SYSYTEM

-

-

-

... More
Construction of pipelines for water supply with 63mm dia, 6Kg/Cm2 HDPE PE-100 grade pipes as per IS Specifications, with its latest amendments and revisions thereon, including supplying of pipes, necessary specials such as bends, Tees, etc., lowering, laying and jointing of pipe lines true to alignment and gradient, trench excavation manually for pipelines in all soils except rock requring blasting and refilling trenches with excavated earth (other than rocky soils and boulders) with watering, tamping and removing surplus earth from site of work and filling the pipeline with water and testing etc., complete as specified in Technical specifications .The rates are inclusive of cost and conveyance of all materials and labour charges for finished item of pipeline work, but excluding GST and CED and including Overheads and contractors profit @ 13.615%.

-

-

-

... More
63 mm dia HDPE 6 Kg/cm2(Manually) Trench size 0.5x0.75m

700

178598

255.14

... More
50 mm dia HDPE 6 Kg/cm2(Manually) Trench size 0.5x0.75m

1500

201105

134.07

... More
20 mm dia HDPE 16 Kg/cm2(Manually) trench depth upto 0.50mts

100

7385

73.85

... More
10 KL GLSR

-

-

-

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH

5.09

1474

289.5

... More
Filling the Foundation with sand including cost,conveyance ,watering and ramming etc complete.

1.53

1488

972.85

... More
CC(1:4:8)using 40 mm HBG metal icluding Cost and conveyance of the all materials etc complete.

1.53

6997

4572.9

... More
M 30 concrete using for bottom raft slab including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for bottom raft

2.03

21640

10660

... More
M 30 Concrete using for GLSR side walls including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Side walls

3

67475

22491.67

... More
M30 concrete using for top flat slab including cost and conveyance of all the materials,but excluding the cost of the steel etc complete for Top Slab with- 0.15 m Thckness

9.45

14478

1532.02

... More
Accoproof plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete.

34.42

20099

5839.6

... More
Cement plastering with CM(1:3),12mm thick including cost and conveyance of all the materials ect complete.

26.89

10974

4081.15

... More
Emulsion painting including cost and conveyance of all the materials ect complete.

26.89

6120

2276

... More
Supply and placing of the HYSD bars, fabrication including cost and conveyance of all the materials etc complete.

0.75

67611

90147.85

... More
Cost, supply & fixing of 65 mm nominal bore GI pipe medium grade properties & weights as per IS 1239 with GI fittings such as elbows, Tees, Couplings, Nipples, plugs complete except for GI bends, unions and GI connectors with checkout and socket etc.of Tata or Zenith make or equivalent and including all taxes etc, complete for Inlet & Outle & scourt.

8

7608

951

... More
Cost, supply & fixing of DI valves 80 mm sluice valve for inlet,outlet & scour

1

16475

16475.41

... More
Cost, supply & fixing of GM Gate valve of 50mm for scour

1

3974

3974.25

... More
Cost, supply & fixing of ladder with 32mm GI pipe of 400mm wide including all charges etc. complete for Inside & Outside of GLSR.

15

6783

452.19

... More
No of items 41 (Forty One) only

-

1179848

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.