Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Civil And Construction
Building Construction
Opening Date18 Jul 2022
Closing Date1 Aug 2022
Tender Amount₹ 62,75,053 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Drilling of Bore well with Hand Bore set to a finished dia of 112/165/175/180 mm justify both sides in all kinds of formations suitable for hand bore set drilling such as black cotton soils, sandy and alluvial soils and insertion of PVC/PVC blue casing pipe with couplings including slotting of pipe where ever required and fixing of bore well with cap and bail plug as per directions of the department for a finished item of work including conducting yield test, crew charges, cost of consumables, transportation charges and bore development charges and all other charges required in fixation of pipe assembly, Flushing of bore with required pressure excluding cost of all required materials such as cap, bail plug, clamp sets, bolts and nuts etc., excluding all taxes , cost of PVC casing pipe, slotting charges as Per SSR 2021-22

85

-

40758

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of PPR Ball Valve conforming to DIN Standards 8077/8092 including cost and conveyance of all materials and labour charges etc., complete.

6

-

1466

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and delivery of 42/ 32mm UPVC column pipe with standing upto 20 Kgs / CM2 upto 200 Mts for submersible motors with both ends square threaded, with rubber 'O' rings with smooth inner surface which can take the minimum load of 2100 to 4000 Kgs weights. Makes : Makes : Ashirvad / Finolex / Waterflo /Sudhakar/Precision including cost & conveyance of all material & labour charges etc complete.

50

-

8125

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply of 3 Core 2.50 Sqmm Flat Copper cable of ISI for Submersible Motors confirming to IS:694:1990. Makes: Finolex / RR Kabel/ Polycab / Havells /KEI/ Gloster/ Goldmedal /GM. including cost & conveyance of all material & labour charges etc complete.

50

-

5228

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and Transportation of 3HP (50X50MM) Three phase ISI self priming Mono block IP44 motor pumpset . Makes : Makes: Kirloskar / Crompton / Texmo / CRI / KSB /Lubi/ AryenVarsha/Falcon including cost & conveyance of all material & labour charges etc complete.

1

-

23996

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Constructing 457.2mm x 457.2mm ( 1'-6" x 1'-6") brick in CM (1:6) prop. Masonry inspection chamber upto 914.4mm (3'-0") and fitted with light weight 457.2mm x 457.2mm ( 1'-6" x 1'-6") C.I. frame and cover of 20Kg. including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work.

4

-

15420

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supplying & fixing CI Nahani traps 1st quality ISI marked conforming to IS:1729-1979 with C.P. Grating fixing with white cement as per site requirements with standard practice 100 mm dia Inlet- 75 mm (3") outlet pipe - 4 Kgs with N.P. Cover for all floors, including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work. (APSS No 1326) for All Floors.

3

-

1029

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supplying & fixing tested gun metal 25mm peet valve of Gunmetal Gate (GM peet) valve as per IS - 778 Class - I, Indian make heavy type - make or equivalent screwed type 1st quality of approved type including cost and conveyance of all materials to site, all labour charges, sales and other taxes on all materials etc., complete for finished item of work for All Floors.25mm NB Size

2

-

2502

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 28.60mm ODPipe - SDR 13.5

150

-

21990

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and Fixing of Premium make CPVC Pipes and Fittings to meet the requirement of ASTM-D 2846 and are produced in CTS (Copper Tube Sizes 1/2" ton 2" Ashirvad Flowgurard SDR 11 and SDR 13.5 pipes are made from idential CPVC compounds having the same physical Properties for Hot and Cold Water (IS 15778:2007) 22.20mm ODPipe - SDR 13.5

75

-

7586

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of 75mm dia 3 M 1SWR PVC pipes (Prince/Sudhakar) 4 kg/Sq.cm.And fixing all special such as plain bends,off sets,door bends, single junctions,double junctions as per site requirement,fixing with PVC clamps if necessary with required numbers of Bombay nails including cost and conveyance of all maerials to sit,labour charges,overheads & contractors prfit complete for finished item of work at all floor leves.(APSS No.1302,1319 & 1326)

35

-

5926

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of 110mm dia 3 M 1SWR PVC pipes (Prince/Sudhakar) 4 kg/Sq.cm.And fixing all special such as plain bends,off sets,door bends, single junctions,double junctions as per site requirement,fixing with PVC clamps if necessary with required numbers of Bombay nails including cost and conveyance of all maerials to sit,labour charges,overheads & contractors prfit complete for finished item of work at all floor leves.(APSS No.1302,1319 & 1326)

50

-

12273

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work SF

18.36

-

9405

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing impervious coat to exposed RCC roof slab surface with CM(1:3), 20mm thick with 1kg of water proof compound per bag of cement laid over roof when it is green including cost of all materials, excluding conveyance charges of materials and including all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc,, complete for finished item of work FF

176.86

-

84558

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing High Yield Strength Deformed (HYSD) steel bars (Fe 415 grade as per IS 1786-1979) of different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lapsplicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, laour charges such as cutting, bending placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS No.126)

17.75

-

1357398

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of 110mm dia ISI mark PVC rain water spouts of 2.5mm thick including cost of necessary PVC bends, shoes and pipe clips and all other accessories and fixing in position including cost and conveyance of all materials to site sales and other taxes on all materials, all operational, incidental and labour charges for laying, fixing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers, junctions, tees, etc with solvent jointing as per standard practicesuch as fixing in alignment etc., complete for finished item of work. (APSS NO. 1328)

22.5

-

6042

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Roofing will be provided with 0.5mm thick galvanized / pre painted G.I. profiled sheets fixed to the purlins with 14 size self drilling screws with neoprene washer. Side laps are stitched with self tapping / drilling screws. End laps are to be sealed with 25x3 mm Butyl tape. The sheets are provided with anti capillary grove.

36.32

-

31361

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of M.S. Hollow Square section of size 50x50x4mm for making the frame for profile sheet including cost & conveyance of all to site, all labour charges and fixing in position etc., complete for finished item of work.

71.5

-

39171

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of M.S. Hollow Circular section of size 50x6mm for making Support for the frame for profile sheet including cost & conveyance of all to site, all labour charges and fixing in position etc., complete for finished item of work.

51.6

-

35533

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Gronolithie Concrete Flooring 20 mm thick with (1:1:2), using 6mm to 12 mm size hard granite machine crushed metal laid over CC bed already laid or RCC roof slab, in alternate panels of size not exceeding 1.50 m x 1.50 m and finishing the top surface to required smoothness and slopes and thread lining including cost of all materials like cement, metal, sand and water etc., complete, including ., etc., complete for finished item of work.

36.19

-

12912

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and Fixing of 50mm thick Cement Jali including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work in All Floors.

3.24

-

1299

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Painting to New External Walls with two coats of Polymer Plastic Emulsion paint of Asian / Berger / Nerolac / Saicoat / Endocem or equalent quality of approved brand and shade as approved by the Engineer - in - Charge over base coat of cement primer water base grade -II exterior making three coats in all to give an even shade after thoroughly brushing the surface to remove all loose powdered materials, including cost and conveyance of all materials, including cost and conveyance of all materials, cost of brushes, water to site, etc., sales & other taxes, all operational, incidental and labour charges such as scaffolding charges, lift charges, curing etc., complete for finished item of work in all floors for external Walls.(APSS No. 911)

918.6

-

170432

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring with chequered cement concrete heavy duty tieles of 1st quality all shades of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including ., etc., complete for finished item of work.GROUND FLOOR

52.5

-

36989

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring with ceramic tiles 7.3mm thick of 1st quality all shades of makes Jhonson & Jhonson, Kajaria, Nitco and Marbonite, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, including ., etc., complete for finished item of work. GROUND FLOOR

17.29

-

14829

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing Skirting to internal walls and Risers of Steps to 15 cm height with 8mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of work.FIRST FLOOR

7.57

-

5284

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing Skirting to internal walls and Risers of Steps to 15 cm height with 8mm thick mirror polished granite tiles length equal to flooring stones, set over base coat of CM (1:3) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete for finished item of workGROUND FLOOR

10.65

-

6943

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring and Treads with Polished Granite stone minimum 16 to 18 mm thick of size up to 2.43m black set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including ., labour charges for dressing of flooring stones etc., complete for finished item of work.FIRST FLOOR

11.3

-

35543

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring and Treads with Polished Granite stone minimum 16 to 18 mm thick of size up to 2.43m black set over base coat of CM (1:8) over already laid CC bed / RCC Roof Slab, including neat cement slurry of honey like consistency spread @ 3.3 kgs per sqm. & Jointed with neat cement to full depth including cost of all materials like cement, sand, and water and flooring stones etc., complete, including ., labour charges for dressing of flooring stones etc., complete for finished item of work.GROUND FLOOR

20.72

-

63713

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Dadooing to walls with Decorated white back ground glazed tiles 200mm x 152mm 1st. quality of any bramd as approved by Engineer - in - charge and set over a base coat of CM (1:5), 12mm thick and neat cement paste at the rate of 3.3 Kg/Sqm. and jointed with white cement paste mixed with pigment of matching shade including cost and conveyance of all materials like cement, sand, water, tiles, etc. to site, ., sales and other taxes on all materials, C921 such as mixing of cement mortar, laying in position, curing, lift charges etc., complete for finished item of work. GROUND FLOOR

98.73

-

53552

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing Skirting to internal walls to 15 cm height and risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including ., etc., complete for finished item of work.First Floor

9.59

-

11306

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing Skirting to internal walls to 15 cm height and risers of steps with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of CM (1:5) 12 mm thick with cement slurry of honey like consistency spread at the rate of 3.30 kgs per sqm and jointed with white cement paste mixed with pigment of matching shade to full depth, including cost of all materials like tiles, cement, sand and water etc., complete including ., etc., complete for finished item of work.Ground Floor

13.86

-

15811

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding ., etc., complete for finished item of work.First Floor

154.04

-

182720

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Flooring with Double charged / multi charged stain free full body porcelain vitrified tiles with double layer pigment of size 600 x 600 mm and thickness between 8-10 mm 1st quality conforming to IS:13711, IS:13712, IS:13630 (Parts 1 to 15) of any colour and finish in all shades and designs, set over base coat of cement mortar (1:8), 12 mm thick over CC bed already laid or RCC roof slab, including neat cement slurry of honey like consistency spread @ 3.3.kgs per sqm & jointed neatly with white cement paste to full depth mixed with pigment of matching shade, including cost of all materials like cement, sand water and tiles etc., complete, excluding ., etc., complete for finished item of work.Ground Floor

149.51

-

171648

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Painting to new internal walls with two (2) coats of ready mixed oil bound washable distemper acrylic base of approved brand and shade over a base coat of cement primer water base interior Grade-I of approved brand, makind three (3) coats in all to give an even shade after thourughly brushing the surface to remove all dirt and remains of loose powdered materials, including cost and conveyance of all materials to work site and all operational, incidental, labour charges etc., complete for finished item of work in all floors for internal walls (SS 911)

437.16

-

51515

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Painting to New wood work with two coats of ready mixed synthetic enamel paint first quality all shades to give an even shade over base coatof wood Primer finishing with putty for wood work after thouroughly brushing the surface to remove all remains including cost and conveyance of all materials to site, sales & other taxes, all operational, incidental and labour charges etc., complete for finished item of work.(3 coats) (APSS No. 1201 & 1212).in All Floors

45.36

-

8068

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;White washing two coats with paint grade white lime for wash or equivalent quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work in all floors for walls

385.99

-

13894

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) GROUND FLOOR

104.04

-

33394

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering even surface of wall with CM (1:4) prop 20mm thick in single coat including cost and conveyance of all materials like cement, screened sand, water etc., to site, ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904)SECOND FLOOR

131.07

-

65834

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) FIRST FLOOR

350.79

-

162244

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering 20mm thick in two coats with base coat of 16mm thick in CM (1:6) and top coat of 4mm thick in CM (1:4) dubara sponge finish including cost and conveyance of all materials like cement, screened sand, water etc., to site, ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing mortar,scaffolding charges, lift charges, finishing,including cutting of Grooves wherever necessary as directed by Engineer - in - charge, curing, etc., for Uneven Surfaces of Brick Wall complete for finished item of work. (APSS 901,903 & 904) GROUND FLOOR

383.86

-

162271

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Second FLOOR

81.67

-

30369

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) First FLOOR

163.6

-

55933

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plastering to even surfaces of wall with CM(1:4) Prop: 12mm thick in single coat including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) Ground FLOOR

221.05

-

68954

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for SECOND FLOOR

18.36

-

7352

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) for FIRST FLOOR

191.46

-

70001

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Ceiling Plastering with CM(1:3) Prop: 12mm thick in single coat spong finish including cost and conveyance of all materials like cement, sand, water etc., to site, sales & other taxes on all materials, all operational, incidental charges and labour charges such as mixing mortar, finishing, curing, etc., complete for finished item of work. (APSS 901,906) GROUND FLOOR

194.84

-

64450

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Providing & Fixing of Openable Windows with Fly-mesh made of pre-painted steel (Base Steel as per IS 513 of 0.58 mm thick galvanized as per IS 277 with zinc of 150 GSM) primer coated with epoxy primer of 5-7 microns thick, finish painted with a polyester paint of 12-16 microns thick and back coated with 5-7 microns thick alkyd backer and the section for outer frame of 72 x 55mm, centre mullion of 72 x 50mm, section for fixed glass beading section of 12 x 12 mm and section for shutters of 48 x 25 mm and outer frame & mullion sections with rebate for prepainted Galvalume Trapezoidal ProfileRoofing sheet 0.5 mm thickness, coating Alu-Zinc AZ150 GSm. Tensile Strength 550 MPa , paint coating Regular modified polyster painting.Painting Thickness 18- 20 micron (Top) 5 to mm Microns sheet width 1.020 legth maximum 12.00 m with regular range colours shutters, provision for guard bars/grills and fly mesh shutter section of 20 x 40 mm and the sections cut to length metre joined with corner bracket, centre mullions fixed with mullion cap, stay, handles, latch 2 Nos of heavy duty stainless steel pivot hinges per shutter and panelled with 5mm thick plain float glass and S.S. Mesh for fly mesh shutter (304 grade), fitted using rubber gaskets including fixing the windows in the concrete/masonry wall by means of self expanding screws, including 10mm Square guard bars with 6? (152.4mm) pitch , complete for finished item of work BMT-P.22 1.50X1.20

32.4

-

241924

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of Door size 1.05 x 2.10 M Double Leaf with Door Frame of Medium Teak wood Section 100 mm x 75 mm along with Double flush door shutters solid bond wood block board type with commercial ply on both faces 35mm thick including fixtures such as Hardware fixtures ie., MSPC Butt Hinges 125mm Long 6 nos, MSPC Handles 125 mm Long 2 Nos, MSPC Tower Bolt 150mm long 2 Nos, MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and Heavy Duty Door Stopper 2 Nos., including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.

2.21

-

9200

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Supply and fixing of Door size 1.20 x 2.10 M Double Leaf with Door Frame of Medium Teak wood Section 100 mm x 75 mm along with Double flush door shutters solid bond wood block board type with commercial ply on both faces 35mm thick including fixtures such as Hardware fixtures ie., MSPC Butt Hinges 125mm Long 6 nos, MSPC Handles 125 mm Long 2 Nos, MSPC Tower Bolt 150mm long 2 Nos, MSPC Aldrop 300 mm long 1 no, MS Hold Fast 6 Nos and Heavy Duty Door Stopper 2 Nos., including Including Labour charges for making of door, fixing of fixtures etc., and cost and conveyance of all materials to site, taxes extra for finished item of work.

20.16

-

82869

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. SECOND FLOOR

46.97

-

54017

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. FIRST FLOOR

64.9

-

69337

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Brick Masonary walls of 11.5cm in CM(1:6) using second class bricks of size 23 x 11 x 7 Cm having a crushing strength of not less than 35.00kg/cm2 and using two mild steel bars of 6m dia in every third layer of brick masory, with free joints of the main block work including cost and seignorage charges and conveyance of all materials and water from approved sources to work site and all operational, incidental, labour charges such as scaffolding mixing mortor constructing masonary lift charges, curing etc. complete but excluding the cost of steel and its fabrication charges. GROUND FLOOR

12.55

-

12383

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, , all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,but excluding seginorage charges etc. complete for finished item of work.SECOND FLOOR

6.49

-

51190

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, , all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,but excluding seginorage charges etc. complete for finished item of work.FIRST FLOOR

30.41

-

228400

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using second class bricks of size 23 x 11 x 7 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, , all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc.,but excluding seginorage charges etc. complete for finished item of work.GROUND FLOOR

37.41

-

266872

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Brick Masonry in superstructure with CM (1:8) prop: using FLY ASH BRICK size 290 x 225x 140 Cms from approved source having minimum crushing strength of 40 Kg/Sqcm. including cost and conveyance of all materials like cement, sand, bricks, water etc., to site, including ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing cement mortar, constructing masonry, scaffolding charges, lift charges, curing, etc., complete for finished item of work. BASEMENT

19.07

-

127621

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Shelves of 50mm thick for Ground Floor.

8.88

-

6517

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Shelves of 75mm thick for Ground Floor.

4.11

-

3668

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work FIRST FLOOR

9.72

-

8462

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Sunshades / Chajjas for 75mm thick at Fixed end and 50mm thick at Free end and for a width of 0.60 Mts. etc complete for finished item of work GROUND FLOOR

8.46

-

6879

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels FIRST FLOOR

0.94

-

10991

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Lintels GROUND FLOOR

0.93

-

10284

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick Waist slab FF

13.07

-

21070

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 175mm thick Waist slab GF

13.51

-

20757

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick SECOND FLOOR

18.62

-

25793

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick FIRST FLOOR

176.86

-

224144

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 125mm thick GROUND FLOOR

177.92

-

213798

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 50mm thick SECOND FLOOR

13.57

-

64394

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Slab of 100mm thick SECOND FLOOR

2.86

-

3446

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Second Floor

1.24

-

14098

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams First Floor

7.64

-

79474

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Beams Ground Floor

7.83

-

77220

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Dummy Columns SECOND FLOOR

1.18

-

9070

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete (1:5:10) Prop Nominal mix using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns SECOND FLOOR

0.81

-

10790

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns FIRST FLOOR

5.07

-

61532

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Columns GROUND FLOOR

12.93

-

147125

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Plinth beam.

8.19

-

97802

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Pedastal

4.05

-

40721

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Vibrated Reinforced Cement Concrete M25 Grade corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including ., sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, vibrating, curing etc. complete for Footings.

26.21

-

250455

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete (1:5:10) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer, sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed

26.01

-

118292

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete (1:4:8) proportion (cement: fine aggregate: Coarse aggregate) using 40mm size Hard Broken Granite (IS383, 1970) machine crushed metal from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, mixing concrete in concrete mixer including ., sales & other taxes on all materials, all operational, incidental, and labour charges such as laying and ramming concrete in layers in position not exceeding 15cm, finishing top surface, curing concrete, etc., complete for finished item of work (APSS No. 402) for Levelling Course and Flooring Bed

19.21

-

89968

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts Second Floor.

0.05

-

308

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including ., sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts First Floor.

0.14

-

787

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete M15 grade nominal mix (1:2.5:5) proportion (cement: fine aggregate: Coarse aggregate) using 20mm size Hard Broken Granite (IS383, 1970) Machine Crushed graded metal from from approved quarry including cost and conveyance of all materials like cement, sand, coarse aggregate, water etc. to site, including sales & other taxes on all materials, all operational, incidental and labour charges such as mixing, laying, curing concrete, etc., complete for finished item of work (APSS No. 402) for Bed Blocks and Hold Fasts Ground Floor.

0.19

-

1044

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for FIRST FLOOR

0.6

-

3950

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Plain Cement Concrete M25 Grade of Concrete corresponding to IS 456 using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site, sales & other taxes on all materials including all operational, incidental and labour charges such as weigh batching, machine mixing, laying concrete, curing etc.,complete but excluding cost of steel and its fabrication charges for finished item of work (APSS No. 402) with minimum cement content @ 380Kgs/Cum from standard suppliers approved by the department including centering, shuttering, laying concrete, curing etc. complete for Steps for GROUND FLOOR

0.6

-

3875

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Filling with useful available excavated earth (excluding rock) in trenches, sides of foundations and basement with initial lead in layers not exceeding 15 cm thick, consolidating No deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310

215.19

-

6197

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Filling with Sand in trenches, sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including all operational, incidental, labour charges, seignorage charges, hire charges of T & P etc., complete for finished item of work. APSS No.309 & 310 Data for finished item of work. APSS No.309 & 310

125.57

-

77257

... More
Providing Additional Infrastructure facilities to Hostel converted to Residential school for Boys at;Earth work excavation for foundations and depositing on bank for all lifts and with an initial lead of 10m including all operational, incidental, ., labour charges such as shoring ,sheeting, planking, strutting, dewatering etc. complete for finished item of work as per SS - 20 B (APSS 308). for Building Foundation

226.93

-

45987



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.