Tribal Welfare Engineering Department Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tribal Welfare Engineering Department - TWED Tender

Civil Works Roads
Opening Date12 Mar 2020
Closing Date26 Mar 2020
Tender Amount₹ 4,75,09,821 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and applying primer coat with bitumen Emulsion (SS-1) on prepared surface of granular base including cleaning the road surface and spraying primer at the rate of 0.70-1.0 Kg/Sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet Mix Macadam & WBM) including contractors profit & Over head charges etc, complete for Prime coat.

30000

-

52.2

... More
Providing and applying tack coat with bitumen Emulsion (Rapid settting-1) using Emulsion pressure distributor at the rate of 0.275kgs per sqm on the prepared bituminous surface cleaned with hydralic broom as per 503 MORD as directed by the Engineer-in-Charge complete for finished item of work.

30000

-

11.5

... More
Providing, laying and rolling of close-graded mix seal surfacing material of 20 mm thickness composed of 13.2 mm to 0.09 mm (Type-B) aggregates as per Table 500.11 of MORD, 2014 using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of laying and rolling with a three wheel 8-10 kN static roller and finishing to required level and grade as per technical specification 507 MORD,2014 including contractors profit& Over head charges etc., complete for finished item of work.

30000

-

155.85

... More
Construction of un-reinforced, dowel jionted at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregate conforming to IS:383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weight batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, scareed and plate vibrators and finished in continious operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, with water finishing to lines and grade as per drawing and technical Specification Clause 1501 MORD.

712.5

-

5834.05

... More
Earth work excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 Mt, dressing of sides and bottom and backfilling in trenches with excavated suitable material complete for finished item of work as per Technical Speicification 305 MORD

-

-

97.35

... More
Earth work excavation by mechanical means for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 Mt, dressing of sides and bottom and backfilling in trenches with excavated suitable material complete for finished item of work as per Technical Speicification 305 MORD with Baling out water.

693

-

102.2

... More
Construction of Gravel shoulders with naturally occuring gravel including cost and conveyance of all materials to work site and spreading in uniform layers by with motor graded on prepared surface,by mixing by mix in place method with rotovator and compacting with smooth wheeled roller to achieve the desired density at OMC etc., as per 408 MORD as directed by the Engineer-in-charge for finished item of work.

3240

-

530.45

... More
Back filling behind Abutments with gravel including cost and conveyance of all materials to site, labour charges etc., complete as per Clause 710.1.4 of IRC:78 and 1204.3.8 MORD as per Drawing and complete for finished item of work.

712.5

-

679.6

... More
Providing Plain Cement Concrete (1:3:6) mix M10 Grade using 40mm (SS5) size HBG crushed stone aggregate and fine aggregate including cost and conveyance of all materials to site, and labour charges for centering, machine mixing, laying concrete in position, Vibrating, curing etc., including all other incidental and operational charges of all T&P etc., as per technical specification 1203 MORDas directed by the Engineer-in-Charge complete for finished item of work for levelling course

-

-

4125.35

... More
Vibrated reinforced Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification 1204 MORD complete for finished item of work for Sub structure for body walls, parapet walls, Abutments, Piers, Wing walls.

-

-

4506.95

... More
Vibrated reinforced Cement Concrete M25 grade using 20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost and conveyance of all materials to site and all labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing but excluding cost of steel and its fabrication charges as per technical specification 800, 1205.4,1205.5 MORD as directed by the engineer-in-charge complete for finished item of work for wearing coat over Bed Blocks.

20.25

-

5809.35

... More
Vibrated reinforced Cement Concrete M25 grade using 20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost,and conveyance of all materials to site and all labour charges for centering, machine mixing, laying concrete in position, vibrating, curing etc., including all other incidental and operational charges of all T&P etc., complete for finished item of work as per drawing but excluding cost of steel and its fabrication charges as per technical specification 800, 1205.4,1205.5 MORD as directed by the engineer-in-charge complete for finished item of work for wearing coat over Deck Slab.

42.75

-

6505.15

... More
Vibrated reinforced Cement Concrete M15 grade using 40mm,20mm & 10mm HBG machine crushed stone aggregate conforming to table 1000.1 and fine aggregate conforming to table 1000.2) including cost and conveyance of all materials to site and all labour charges for machine mixing, laying in position, compacting, vibrating and curing including all other incidental and all other operational charges of T&P required etc, as per techinical specification 802, 803,1202 &1203 MORD complete for finished item of work for footings, Abutments, Piers, Wing walls and Raft foundations.

209.35

-

4261.1

... More
Providing and laying of filter media using 50% of 150 mm IRC soling stones and 50% of 40mm HBG metal stisfying the requirements to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind the abutment, wing wall and return wall to the full height compacted to a firm condition including cost and conveynace of all metal and all labour charges as directed by the departmental officers as per drawing and Technical specifications as per clause 710.1.4 of IRC:78 and 1204.3.8 MORD complete for finished item of work.

23.4

-

1879.85

... More
Providing HYSD bars (Fe-415) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc.,and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per technical specification 1002, 1005,1010, 1202 MORD and as per I.S.1786 of 1985 complete for finished item of work for Substructure.

9.45

-

49052.7

... More
Providing weep holes in plain/reinforced concrete Abutments, Return walls and wing walls with 100mm Diameter AC pipe extending through the full width of the structute at 1.00m C/C in both horozomtal and vertical direction so that the weep holes in each horizontal direction is staggered from the weep holes layig above and below lines as shown in drawing including cost and conveyance of the A.C pipes and labour charges for cutting to required length, placing the pipe with a slope of about 1V:20H towards stream side face etc., as per technical specification 614,709,1204.3.7 MORD complete for finished item of work for weep holes

-

-

482.3

... More
Providing, laying Reinforced cement concrete Hume pipes of 1000 mm diameter NP-3 class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying, jointing of 1000 mm diameter R.C.C Hume pipes in position including lifting, aligning, lowering and hoisting etc., as per drawing and as per , IRC Special Publication No: 13 and 1106 MORD as directed by the Engineer-in-Charge, complete for finished item of work.

82.5

-

7641.05

... More
TOTAL NUMBER OF ITMES 20 (TWENTY ) ITEMS ONLY

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.