To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Opening Date20 Dec 2023
Closing Date3 Jan 2024
Tender Amount₹ 32,14,913 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
T-clamps for single moose all 3ways

24

-

849.75

... More
Spacer T-Clamps suitable for Twin moose to single moose (150 mm)

3

-

768.38

... More
Pad clamp suitable for Twin Moose

6

-

590

... More
Supply and erection of LED lamps (120W) with fixture

5

-

8085.5

... More
CO2 portable fire extinguishers of 15 Lbs capacity without trolley and hose pipe

2

-

6373.64

... More
CO2 portable fire extinguishers of 50 Lbs capacity and hose pipe

1

-

26201.14

... More
2 Mtr x 1 Mtr, 10mm thick Neoprine Rubber mats of ISI

2

-

3587.49

... More
Supply of GI bolts & Nuts

0.04

-

111510.89

... More
Supply of GI Structure parts including cost of Steel, Galvanisation, Fabrication and Transportation to Renigunta SS Site

0.84

-

99089.8

... More
100x16mm MS Flat.

200

-

924.71

... More
100x16mm GI Flat

80

-

1167.63

... More
75x8mm MS Flat

300

-

344.93

... More
75x8mm GI flat

150

-

435.55

... More
LABOUR - Electrical

-

-

-

... More
Description of Item

-

-

-

... More
Dismantling of the main and auxilary structures etc, under Shutdown

0.59

-

5551.15

... More
Erection of the main and auxilary structures etc, using bolts and nuts under Shutdown

0.99

-

7401.52

... More
Dismantling of jumpers(Single zebra) under shutdown

24

-

581.14

... More
Connection of jumpers with Single Zebra/moose under shutdown

15

-

774.86

... More
Connection of jumpers with Twin Moose under shutdown

15

-

1200.84

... More
Dismantling of the following equipment with crane/derrick at site including handling the material/equipment carefully at site including labour charges for all incidental and operational items of work (under shut down)

-

-

-

... More
132 KV Circuit Breaker under shutdown

1

-

27751.57

... More
132 KV Current Transformers under shutdown

3

-

6103.36

... More
132KV LAs under shutdown

3

-

2882.3

... More
33 KV current transformers under shutdown

3

-

1885.27

... More
33 KV Isolator under shutdown

1

-

3605.28

... More
Erection of following equipment with Crane/Derrick at site including labour handling the material/equipment carefully at site including labour charges for all incidental and operational items of work

-

-

-

... More
132 KV Circuit Breaker under shutdown

1

-

37002.09

... More
132 KV Current Transformers under shutdown

3

-

8137.82

... More
132KV LAs under shutdown

3

-

3843.06

... More
33 KV current transformers under shutdown

3

-

2513.69

... More
33 KV Isolator under shutdown

1

-

4807.04

... More
Dismantling of Control and Relay panels, LTAC panels, annunciation panels,PTDB Panel etc,. in the control room under Shutdown

2

-

4930.06

... More
Erection of Control and Relay panels, LTAC panels, annunciation panels,PTDB Panel etc,. in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts including man support to MRT wing for commissioning under Shutdown

2

-

6573.42

... More
Dismantling of Marshalling Boxes on the structures of equipment (132KV & 33KV CTMB). under Shutdown

2

-

805.62

... More
Erection of Marshalling Boxes on the structures of equipment (132KV & 33KV CTMB). under Shutdown

2

-

1074.15

... More
Laying control cables of all sizes (from 2 core 2.5/4.0sqmm to 12 core, 2.5/4.0sqmm, both copper and aluminium in cable trenches including cost of suitable metallic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

5000

-

18.71

... More
Dismantling the Cable termination to the switch gear, marshalling boxes / panel terminal block / control and relay panels, LT AC panel under Shutdown

120

-

57.84

... More
Cable termination to the switchgear, Marshalling boxes/Panel terminal blocks/control & relay panels, LTAC panel including providing suitable ferrules and lugs as per specification ( including cost of ferrules and lugs) under Shutdown.2.5 Sq.mm

200

-

77.12

... More
Laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats/GI Flats. under Shutdown

-

-

-

... More
Removing of earth connections of PTR 100x16MM MS/GIFLAT

20

-

172.14

... More
Removing of earth connections of PTR 50X8MM MS FLAT

10

-

133.58

... More
100x16mm MS Flat.

200

-

229.52

... More
100x16mm GI Flat

80

-

229.52

... More
75x8mm MS Flat

300

-

205.65

... More
75x8mm GI flat

150

-

205.65

... More
Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/74) of nominal dia 125mm and 2.75meters long in side the pit including supply and fixing RCC collars 1 meter dia and 0.6meters long in side the pit, backfilling the pit in the 25mm size granules of BH coke for full depth of the pit with alternate layers of BH coke and earth of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke and RCC collars, labour charges for all operational and incidental items of work etc., complete including cost of CI pipe

7

-

24003.93

... More
Setting of Stub with Stub Setting Template for Sub-Station Structure: Erection of Stub-Template, Fixing of Jacks for supporting the template, Alignment and leveling of exact location of stubs of stub setting template ,dismantling of template after completion of initial curing of CC

-

-

-

... More
For 132KV Breakers

1

-

3381.8

... More
For CPLs

3

-

1246.63

... More
Fabrication of main and auxilory structures,stub setting templates,foundation bolts,U bolts etc using raw steel such as MS Angles,Plates,Channels, R.S. Joists, MS rounds, excluding cost of mild steel and transport charges to site (As per steel Quantity data)

0.17

-

17618.47

... More
Writing of letters in control room panels of lettering on panels marshalling boxes.

20

-

163.01

... More
Loading Charges at Strores, Kadapa

1

-

5318.66

... More
Unloading charges at Site

1

-

5126.81

... More
Transportation charges of equipments and materials

2

-

10663

... More
Transit Insuranace for transportation of material from Constructions stores, Kadapa to the Site.

1

-

14460.11

... More
Labour - Civil Protion

-

-

-

... More
Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable metraial to any remote place 1000 mts distance away from site with all leads and lifts includung cost of T&P ,labour and as per the directions of the Engineer-in - charge for finished item of work.

45

-

2531.5

... More
Dismantling of existing Brick masonry including clearing away and carefully stacking materials useful for re use and all debris 100M away from the site with labour charges, T&P complete as per the directions of the Engineer in charge for the finished item of work.

7

-

316.84

... More
Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work.

190

-

198.29

... More
Providing Crusher dust cushion for foundations and basement in layers, not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

35

-

1086.04

... More
Providing sand filling within cable ducts including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work

10

-

804.07

... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

15

-

4538.76

... More
Plain Cement concrete - Nominal Mix (1:3:6) with 12 to 20mm (50% each) HBG metal for bed concrete including cost and conveyance of all materials, machine mixing, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456)

8

-

5201.12

... More
Construction of RR Masonry in CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

2

-

4610.2

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work For SWITCH YARD WORKS

2.2

-

71647.8

... More
RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm & 12mm size machine crushed hard granite metal (in 2:1 ratio) (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

-

-

-

... More
RCC for Foundations

26

-

9814.73

... More
For RCC Cover Slabs with 50% 20mm & 50% 12mm HBG metal

2.5

-

8867.81

... More
CC (1:2:4)

1.5

-

6227.24

... More
Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

15

-

6958.86

... More
Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope and including cost & conveyance of all materials, labour charges, leads, lifts, complete as per the directions of the Engineer in charge for the finished item of work.

60

-

393.29

... More
Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

130

-

381.01

... More
White washing two coats with with white cement of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

140

-

49.58

... More
Supply and fixing of 90/105 lbs rails poles over the transformer plinth including cost & conveyance of all materials, labour charges for cutting and fixing charges with lead and lift etc, complete

900

-

77.83

... More
Supply and spreading of crusher dust in the switch yard area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..

25

-

1316.57

... More
Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

250

-

22

... More
Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

25

-

2391.37

... More
Picking and Removal of existing Hard Broken Granite metal 63 mm size in switch yard, including labour charges, at all leads, lifts complete as per the directions of the Engineer-in-charge for the finished item of work.

25

-

109.07

... More
WATER SUPPLY ARRANGEMENT TO EARTH PITS

-

-

-

... More
Supplying and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube Sizes 1/2" ton 2" Ashirvad flowguard SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for hot and cold water(IS 15778:2007) for water supply line to earth pits / toilets including cost and conveyance of pipe, CPVC specials such as elbows, Tees concealing same in walls and floors by cutting 34.9/ 28.6/ 22.2/15.9 mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
28.6 mm OD pipe SDR 13.5

50

-

150.82

... More
22.2 mm OD pipe SDR 13.5

150

-

104.25

... More
15.90 mm OD pipe SDR 13.5

50

-

65.43

... More
Providing and fixing in position at all levels of the buildings G.M. Gate (GM peet) Valve (Tata/ Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including jointing complete as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
20 mm dia

2

-

830.17

... More
15 mm dia

2

-

622.17

... More
Supply and fixing of 12.5mm/15mm dia N.P bib tap Indian make 3heavy duty Seiko or equivalent make including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

5

-

259.99

... More
Supplying &fixing of 450mm dia RCC Hume pipe for culvert with RCC plain ended pipe & collars required confirming to BIS 458/2003 NP - 2 Class including cost & conveyance of all materials, labour charges complete for finished item of work as per the directions of the Engineer-in-charge.

10

-

890.04

... More
Supply and fixing of Aluminium Partition cum Sliding Door with partly glazed & partly panelled using Al. section 20075 of size 101.60x 38.10x 1.65 @ 1.954kg/ mt for partition outer & vertical frames , 63.50x 38.10x 1.65 @0.942kg/m of Jindal section 20048 for sliding shutter, "G" channel section for sliding using Jindal section 17528 of size 39x40x 2.65 @0.828kg/m including Glazing clips , Butter fly handles24.60x101.60 of Jindal section 18604,5mm thick plain glass,12mm thick prelaminated cement particle board , "U" rubber beading,bearing wheels(heavy) for sliding,heavy aluminium hinges, Tower bolts, "L" brackets ,Hard ware locks 6 levers (PC/CP handle) etc., necessary hardware and labour charges complete for finished item of work, as directed by the Engineer in charge.

32

-

4888.55

... More
Sub Total I+II+III

-

-

-

... More
Rupees Thirty Two Lakh Fourteen Thousand Nine Hundred Thirteen only

-

-

-

... More
CHIEF ENGINEER

-

-

-

... More
KADAPA ZONE : : APTRANSCO

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.