To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Electrical Generators And Transformers
Excavation
Electrical and Electronics
Opening Date6 Nov 2024
Closing Soon21 Nov 2024
Tender Amount₹ 6,74,511 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Dismantling the existing RCC by mannual means and carefully stacking the reuseful material at site and disposing the unserviceable material to any remote place 1000 mts distance away from site with all leads and lifts includung cost of T&P, labour and as per the directions of the Engineer-in-charge for finished item of work.

1.8

2253

4056.79

... More
Removal of existing 20mm size Hard Broken Granite metal in switch yard includng cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer-in-charge for the finished item of work.

2.6

49

128.49

... More
Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc., covering initial lead and lift etc., and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer-in-charge for the finished item of work.

12

180

2163.72

... More
Providing Sand cushion for foundations and basement in layers, not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc., complete as per the directions of the Engineer-in-charge for the finished item of work.

5.7

1315

7496.7

... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc., complete for finished item of work as per directions of the Engineer-in-charge.

1.5

4698

7047.23

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/SAIL/VSP make, different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work, For SWITCH YARD WORKS.

1.3

68951

89637.22

... More
RCC M-20 Nominal mix (Cement 400 kgs) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

-

-

-

... More
Switchyard Foundations

12

9569

114835.92

... More
Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope and painting two coats of white cement including cost & conveyance of all materials, labour charges, leads, lifts and curing including cost of white cement paint two coats, complete as per the directions of the Engineer in charge for the finished item of work.

24

406

9759.36

... More
Supply and fixing of 105 lb rail pole conforming to Indian Railway specification and fixing on RCC pedestal including the cost of all labour, materials, equipment fixing bolts, base plates etc., but excluding the cost of excavation, concrete, reinforcement, shuttering and guide angles as per specification and approved drawings (top of rail shall flush with top of concrete) complete as approved and directed by the Engineer-in- charge at site.

21

4980

104589.45

... More
For fixing of foundation bolts of 24mm dia on the existing transformer plinth by drilling holes on the plinth and applying Hilti RE 500 for anchoring the bolts on the existing plinth including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc., complete as per the directions of the Engineer-in-charge for the finished item of work.

50

2750

137500

... More
Supply and application of Fosroc make of NITOBOND EP on the existing repared concrete surfaces including cost and conveyance of all materials, labour chrges, Scaffolding charges., etc., complete as per the directions of the Engineer-in-charge for the finished Item of Work.

25

235

5888.24

... More
Supply and fixing in position M.S. Angles of required size of approved design and quality. (for PTR Plinth) and painting with two coats of synthetic enamel paint of approved quality, make, colour and shade over one coat of red oxide, complete as per the directions of the Engineer-in-charge for the finished item of work.

330

106

35201.1

... More
Fabrication charges for structural steel fixing in position of required size of approved design and quality,complete as per the directions of the Engineer-in-charge for the finished item of work.

55

41

2300.1

... More
Sub Total Rs.

-

-

525480.54

... More
Total

-

-

525480.54

... More
GST @ 18%

-

-

94586.5

... More
Grand Total Rs.

-

-

620067.04

... More
Or Say Rs.

-

-

620067



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.