Transmission Corporation Of Andhra Pradesh Limited Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Electrical and Electronics
Opening Date22 Feb 2024
Closing Date4 Mar 2024
Tender Amount₹ 1,80,42,069 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Spacer clamps (150 mm) suitable for Twin Moose

40

17015

425.39

... More
T clamps for Twin moose take off single moose with 150mm spacing

15

11525

768.38

... More
Spacer T clamps through zebra and take off Moose (150 mm spacing)

9

6326

702.9

... More
Pad clamps suitable for Dog

12

5346

445.5

... More
T clamps Dog to Dog

12

4752

396

... More
CT & PT stud clamps suitable for moose

15

7320

488

... More
Pad clamps suitable for moose

45

19260

428

... More
Rubber mats of size 2m x 1m x 12mm

4

14349

3587.49

... More
Supply and erection of LED lamps (120W) with fixture

4

32342

8085.5

... More
Lighting Pillar Box along with MCBs

1

11362

11362.96

... More
U Bolts (16 mm)

6

1081

180.25

... More
Supply of GI structure parts

6.37

636389

99935.8

... More
Supply of GI bolts & Nuts

0.37

41568

111510.89

... More
supply of 100x16mm MS flat

200

186328

931.64

... More
supply of 100x16mm GI flat

75

89971

1199.62

... More
supply of 75x8mm MS flat

300

104256

347.52

... More
supply of 75x8mm GI flat

250

111870

447.48

... More
Supply and fixing of GI Flexible Earth Bond

30

10197

339.9

... More
CO2 type portable fire extinguishers of 9Kgs capacity with trolley mounted

4

47314

11828.52

... More
CO2 portable fire extinguishers of 50 Lbs capacity and hose pipe

2

52402

26201.14

... More
Hoisting of Insulators and hardware, stretching the conductor and stringing of 33KV bus comprising of three conductors with twin zebra/Moose conductor to a tension of 900kgs.)Approximate length of bus section will be 20m).(Including auxilary buses)

1

11448

11448.98

... More
Erection of following equipment with Crane/Derrick at site including labour handling the material/equipment carefully at site including labour charges for all incidental and operational items of work. Under SHUTDOWN Condition

-

-

-

... More
33KV Isolator

2

11184

5592.44

... More
Setting of Stub with Stub Setting Template for Sub-Station Structure: Erection of Stub-Template, Fixing of Jacks for supporting the template, Alignment and leveling of exact location of stubs of stub setting template ,dismantling of template after completion of intial curing of CC

-

-

-

... More
33KV Breaker

2

3833

1916.69

... More
33 KV Tower (TC-4 Nos and TD-5 Nos)

9

9540

1060.03

... More
Erection of the main and auxilary structures etc, using bolts and nuts

6.3

28848

4579.82

... More
Erection of following equipment with Crane/Derrick at site including labour handling the material/equipment carefully at site including labour charges for all incidental and operational items of work.

-

-

-

... More
33KV Circuit Breaker including pole to pole cable wiring and terminations

2

18453

9226.67

... More
33KV Current Transformer(400/1-1 A) along with clamps

6

9332

1555.39

... More
33KV Lightning Arrestor

6

5576

929.37

... More
33KV Isolator including solid core insulators erection,alignment in full shape for smooth operation

5

14872

2974.44

... More
33 KV Potential Transformers

3

4666

1555.39

... More
Connection of equipment to bus and or another equipment with single zebra/Moose/Panther conductor including measuring, cutting,clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary including all T clamps,PG Clamps,suspension hardware where ever necessary except equipment clamps.

-

-

-

... More
Jumpers under shutdown conditions

12

10817

901.46

... More
Jumpers without shutdown conditions

45

21575

479.46

... More
Erection of Control and Relay panels, LTAC panels, annunciation panels,PTDB Panel etc,. in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts including man support to MRT wing for commissioning

2

8134

4067.42

... More
Erection of Marshalling Boxes

3

1993

664.65

... More
Laying control cables of all sizes (from 2 core 2.5/4.0sqmm to 12 core, 2.5/4.0sqmm, both copper and aluminium in cable trenches including cost of suitable metallic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

4050

64435

15.91

... More
Cable termination to the switchgear, Marshalling boxes/Panel terminal blocks/control & relay panels, LTAC panel including providing suitable ferrules and lugs as per specification ( including cost of ferrules and lugs).

-

-

-

... More
2.5 sqmm copper with copper lugs each core at both ends

200

9544

47.72

... More
Laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats/GI Flats.

-

-

-

... More
100x16mm MS flat

200

28404

142.02

... More
100x16mm GI flat

75

10651

142.02

... More
75x8mm MS flat

300

38175

127.25

... More
75x8mm GI flat

250

31812

127.25

... More
Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/74) of nominal dia 125mm and 2.75meters long in side the pit including supply and fixing RCC collars 1 meter dia and 0.6meters long in side the pit, backfilling the pit in the 25mm size granules of BH coke for full depth of the pit with alternate layers of BH coke and earth of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke and RCC collars, labour charges for all operational and incidental items of work etc., complete including cost of CI pipe

6

122465

20410.93

... More
Erection of Lighting Pillar Box in switchyard on foundation laid (Excluding pillar box)

1

1831

1831.47

... More
Marking as per approved Layout with the help of surveyor for Bay/Bays

1

19167

19167.99

... More
Writing of letters in control room panels of lettering on panels marshalling boxes

30

4158

138.61

... More
Loading of Material at stores Kadapa

1

9258

9258.75

... More
Trasportation of material from Kadapa stores to site

4

39952

9988.2

... More
Unloading of material at site

1

7407

7407

... More
Transit insurance for transportation of material from stores to site

1

31092

31092.35

... More
Clearing THIN jungle growth (less than 50 percent open space) including bushes up to 30 cm /parthenium and other weeds including burning or disposing off the same as directed by Engineer in charge for the finished item of work.

950

2204

2.32

... More
Clearing and grubbing the land including uprooting wild vegetation, grass, bushes, shurbs and trees of girth upto 300 mm removal of stums of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per technical specification clause 201 MORD/Morth, complete for finished item of work as per the directions of the Engineer in Charge.

45

126

2.8

... More
Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work.

175

30089

171.94

... More
Excavation in Hard Rock requiring controlled blasting where ever necessary for levelling. The rate includes labour charges by controlled blasting method and controlling fly-rock by muffling arrangements, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.

95

73496

773.65

... More
Levelling by cutting and filling by mechanical means including pre-watering of soil, excavation of soils, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per (Payment will be made based on level for finished item of work).

355

47268

133.15

... More
Providing Crusher dust/sand cushion for foundations and basement in layers, not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
crusher dust cushion

16

10554

659.68

... More
Sand cushion

8

9757

1219.71

... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

17

68777

4045.72

... More
P.C.C(1:3:6) cable duct

1

5241

5241.86

... More
Construction of RR Masonry in CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

32

123208

3850.27

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work For SWITCH YARD WORKS

1.1

76393

69448.19

... More
RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm & 12mm size machine crushed hard granite metal (in 2:1 ratio) (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (screened sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

-

-

-

... More
RCC for Foundations

34

297410

8747.36

... More
For RCC Cover Slabs with 50% 20mm & 50% 12mm HBG metal

2.5

19670

7868.36

... More
Brick Masonry in CM (1:6) with 2nd class Bricks traditional size 23 x 11 x 7 cms of approved quality, including cost & conveyance of all materials, labour charges, scaffolding leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work .

9

60313

6701.53

... More
Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope and including cost & conveyance of all materials, labour charges, leads, lifts, complete as per the directions of the Engineer in charge for the finished item of work.

25

9116

364.64

... More
Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

96

31713

330.35

... More
White washing two coats with with white cement of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental such as scaffolding, lift charges etc., complete for finished item of work

245

10390

42.41

... More
Painting with 2 coats of synthetic enamel paint over a primer for old iron work including cost and conveyance of all materials with lead and lift etc complete for finihsed item of work.

50

5633

112.67

... More
Removal and Re spreading of metal in the existing switch yard ncluding providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals labour charges leads lifts complete as per the directions of the Engineer in charge for the finished item of work

14

2880

205.78

... More
Supply and spreading of crusher dust in the switch yard area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard areaincludind cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..

90

78047

867.19

... More
Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

900

19800

22

... More
Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

90

175625

1951.39

... More
Supplying &fixing of 300 mm dia RCC Hume pipe for culvert with RCC plain ended pipe & collars required confirming to BIS 458/2003 NP - 2 Class including cost & conveyance of all materials, labour charges complete for finished item of work as per the directions of the Engineer-in-charge.

18

9256

514.24

... More
Levelling the low lying areas with excavated earth ( obtained from the foundations of Control house and Switch yard structures) with a lead up to 1 KM over initial lead, depositing the soils in filling areas , spreading soils in layers of 25cm before compaction, breaking clods, watering and compacting each layer by 8 to 10 MT static Road Roller including all hire and operational charges of T&P complete with lead upto 1km for water for finished item of work as per the directions of the Engineer in Charge. (Payment will be made based on final levels for the finished item of work).

95

9292

97.82

... More
Levelling by filling with borrowed earth (Other than Black cotton soil) by mechanical means including cost & conveyance of gravel, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per (Payment will be made based on level for finished item of work).

810

303490

374.68

... More
Providing & Placing on Terrace(at all floor levels) polyethylene water storage tank with Double layer approved brand & manufacture with cover and suitable locking arrangement & making necessary holes for inlet & outlets and over flow pipes but without fittings & base support for tanks etc complete as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
500 Lt capacity tank

1

4750

4750

... More
1000Lt capacity tank

1

9000

9000

... More
Providing and fixing in position at all levels of the building under floors and against walls 110mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such as junctions, with or without access doors as required and fixing cowls at top wherever necessary including excavation and refilling wherever required,, testing etc. complete as per the directions of the Engineer in charge for the finished item of work.

20

3310

165.5

... More
Supplying and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube Sizes 1/2" ton 2" Ashirvad flowguard SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for hot and cold water(IS 15778:2007) for water supply line to earth pits / toilets including cost and conveyance of pipe, CPVC specials such as elbows, Tees concealing same in walls and floors by cutting 34.9/ 28.6/ 22.2/15.9 mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
28.6 mm OD pipe SDR 13.5

100

14155

141.55

... More
22.2 mm OD pipe SDR 13.5

80

7827

97.84

... More
15.90 mm OD pipe SDR 13.5

60

3684

61.41

... More
Providing and fixing in position at all levels of the buildings G.M. Gate (GM peet) Valve (Tata/ Zenith make)as per IS-778 class- 1, Indian make heavy type for water services with hand wheel at all elevations for following sizes including jointing complete as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
25 mm dia

2

2343

1171.81

... More
20 mm dia

4

3275

818.81

... More
15 mm dia

4

2443

610.81

... More
Supply and fixing of 12.5mm/15mm dia N.P bib tap Indian make 3heavy duty Seiko or equivalent make including cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work .

-

-

-

... More
15mm dia

20

5049

252.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.