Transmission Corporation Of Andhra Pradesh Limited Tender

... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender

Works
Civil And Construction
Building Construction
Opening Date25 May 2024
Closing Date15 Jun 2024
Tender Amount₹ 89,17,679 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Single suspension H/W suitable for Moose (Pilot)

6

-

1569.72

... More
5 bolted twin Zebra/moose tension h/w 400 mm spacing for 132 KV bus

6

-

5021.25

... More
3 Bolted Tension H/W for twin moose with 150 mm spacing to 33 KV Bus

6

-

4403.25

... More
Spacer clamps with 400 mm spacing for twin moose

15

-

632.42

... More
Spacer clamps (150 mm) suitable for Twin Moose

20

-

425.39

... More
T-Clamps single Moose all three ways

24

-

849.75

... More
Spacer T-Clamps suitable for Twin moose to moose single(150mm)

6

-

768.38

... More
T clamps for twin moose to single moose with 400 mm spacing

12

-

1001.16

... More
Post type insulator clamps for single conductor for 132 KV

3

-

708.64

... More
T Clamps suited for Zebra through and take off Moose

3

-

495

... More
CT Stud clamps suitable for moose

6

-

2379.3

... More
CT Stud clamps suitable for twin moose

6

-

2379.3

... More
Pad Clamps suitable for twin moose

15

-

590

... More
Pad Clamps suitable for single moose

15

-

428

... More
Bolted earth wire tension clamps

12

-

760.14

... More
Rubber mats of size 2m x 1m x 10mm thick Neoprine Rubber mats of ISI Quality

4

-

3587.49

... More
Supply and erection of 120 W LED Lamps

4

-

8085.5

... More
CO2 portable fire extinguishers of 15lbs capacity without trolley and hose pipe

1

-

6373.64

... More
CO2 type portable fire extinguishers of 50 lbs capacity with trolley mounted

1

-

26201.14

... More
Supply and erection of Fire buckets (06 Nos) along with stand as per local market rates

1

-

4200.1

... More
70KN Porcelin Normal Disc Insualtors

138

-

418.18

... More
Supply of GI Structure parts including cost of Steel, Galvanisation, Fabrication and Transportation to Tirupati SS Site

15.81

-

99592.8

... More
Supply of GI bolts & Nuts

0.73

-

111510.89

... More
U Bolts (16mm)

12

-

180.25

... More
100x16mm MS Flat

150

-

931.64

... More
100x16mm GI Flat

200

-

1194.87

... More
75x8mm MS Flat

250

-

347.52

... More
75x8mm GI flat

300

-

445.7

... More
Supply and fixing of CT & PT operated, ABT electronic energy meter, 3 phase, 150/1 A of secure APEX/L&T make (Yard Meter)

1

-

178666.67

... More
Erection of the main and auxilary structures etc, using bolts and nuts

15.22

-

5587.57

... More
Erection of following equipment with Crane/Derrick at site including labour handling the material/equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from Dept. stores to the site).

-

-

-

... More
132KV Circuit Breaker

1

-

27933.69

... More
33KV Circuit Breaker

1

-

11256.92

... More
132 KV Current Transformer

3

-

6143.42

... More
33KV Current Transformer

3

-

1897.64

... More
132KV Lightning Arrestor

3

-

2901.21

... More
33KV Lightning Arrestor

3

-

1133.87

... More
33KV PT's

3

-

1897.64

... More
132KV Isolator without earth switch

1

-

10048.2

... More
Erection of following equipment with Crane/Derrick at site including labour handling the material/equipment carefully at site including labour charges for all incidental and operational items of work. (excluding cost of transport charges from Dept. stores to the site) Under Shutdown Conditions

-

-

-

... More
33KV Isolator

1

-

4937.94

... More
Hoisting of Insulators and hardware, stretching the conductor and stringing of 132KV bus comprising of three phases with twin zebra/Moose conductor to a tension of 1800 kgs including fixing of spacer clamps (Maximum length or up to a length of bus section 45m)

1

-

22341.97

... More
Hoisting of Insulators and hardware, stretching the conductor and stringing of 33KV bus comprising of three phases with twin zebra/Moose conductor to a tension of 900kgs including fixing of spacer clamps. (Maximum length or up to a length of bus section 20m)

1

-

13968.23

... More
Fixing of spacers for twin moose conductor

35

-

220.4

... More
Fixing of hardware, stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinnacle to pinnacle

12

-

1668.92

... More
Fixing of hardware, stretching the ground wire and stringing of earth wire to a tension of 450kgs from pinnacle to Ground

120

-

112.28

... More
Connection of equipment to bus and or another equipment with single zebra/moose conductor including measuring , cutting , clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

21

-

584.96

... More
Connection of equipment to bus and or another equipment with single zebra/moose conductor including measuring , cutting , clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. (Under shutdown)

3

-

795.96

... More
Connection of equipment to bus and or another equipment with twin zebra/moose conductor including measuring , cutting , clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary. (Under shutdown)

6

-

1233.54

... More
Connection of equipment to bus and or another equipment with twin zebra/moose conductor including measuring , cutting , clamping and hoisting of suspension insulator assembly to support the conductor wherever necessary.

12

-

906.54

... More
Erection of Control and Relay panels, LTAC panels, annunciation panels,PTDB Panel etc,. in the control room duly mounting them on channels and grouting them with foundation bolts excluding cost of channels & foundation bolts including man support to MRT wing for commissioning

2

-

4962.42

... More
Erection of Marshalling Boxes on the structures of equipment (132KV CTMB, 33KV CTMB and 33KV PTMB)

2

-

810.9

... More
Laying control cables of all sizes (from 2 core 2.5/4.0sqmm to 12 core, 2.5/4.0sqmm, both copper and aluminium in cable trenches including cost of suitable metallic cable glands with rubber lining. Note: This includes running of cables in control room where cables are run on cable racks in cable duct.

3900

-

19.41

... More
Cable termination to the switchgear, Marshalling boxes/Panel terminal blocks/control & relay panels, LTAC panel including providing suitable ferrules and lugs as per specification ( including cost of ferrules and lugs).

-

-

-

... More
2.5 sqmm copper with copper lugs each core at both ends

300

-

58.22

... More
Laying of earth mat including excavation of trenches, welding, connecting to equipment and connecting lightning shield to earth mat and earthing of fence posts, drilling and connecting earth rods including connecting cast iron pipes as per Drg.No.SET(P)/149/82 with the following sizes of MS Flats/GI Flats.

-

-

-

... More
100x16mm MS Flat

150

-

173.27

... More
100x16mm GI Flat

200

-

173.27

... More
75x8mm MS Flat

250

-

155.25

... More
75x8mm GI flat

300

-

155.25

... More
Excavation of earth pit, putting cast iron pipe with flange on one end (as per ISS7181/74) of nominal dia 125mm and 2.75meters long in side the pit including supply and fixing RCC collars 1 meter dia and 0.6meters long in side the pit, backfilling the pit in the 25mm size granules of BH coke for full depth of the pit with alternate layers of BH coke and earth of 300mm thick around the earth pipe of 150mm on all the sides of the pipe including cost and conveyance of BH coke and RCC collars, labour charges for all operational and incidental items of work etc., complete including cost of CI pipe

9

-

24902.18

... More
Setting of Stub with Stub Setting Template for Sub-Station Structure: Erection of Stub-Template, Fixing of Jacks for supporting the template, Alignment and leveling of exact location of stubs of stub setting template ,dismantling of template after completion of initial curing of CC

-

-

-

... More
For 132KV TNS/TND Towers

6

-

5178.66

... More
For 33KV Towers(TD,TC,TB) and 132KV CPL's,

11

-

1293.28

... More
For 132KV Breakers

1

-

3508.35

... More
33KV Breakers

1

-

2338.44

... More
For 132KV Isolators

1

-

3882.61

... More
Loading & Unloading charges

2

-

17070.44

... More
Transportation charges from Kadapa to 132 KV Tirupati substation

5

-

11338.2

... More
Marking as per approved layout with the help of surveyor for 132/33KV PTR bay

1

-

23385.74

... More
Providing of "Caution Boards" of size 12"x8" painted as Load Relief, Line Clear, Break down, Danger including cost of paint, brushes and labour charges etc., complete as directed by the engineer in charge.as per Loacl Market rate

4

-

649.5

... More
Lettering of C&R panels & Equipment painting of RYB colours on outdoor equipment with superior quality enamel paint including cost of brushes, labour charges etc., coplete as directed b the enginer incharge.

10

-

169.11

... More
Supply of 12"x8" size 18swg sheet boards with spikes 0.75mts for fixing on the ground at earth pit to display the earth pit No. including cost of sheet,MS rod and redoxide painting and two coats enamel blue paint and writing the details of earth pit including all cost of labour charges complete.

9

-

649.5

... More
Supply and fixing of GI metering box and construction of brick masonry plinth of suitable size plastering plinth 12 mm thick with CM 1:4 and white washing 2 coats with suryacem, fixing of foundation bolts and drilling of 2 mm dia holes to terminal cover bolts for sealing of 132 KV CTs & PTs etc., complete as per APSPDCL specification

1

-

52250

... More
At single frequency testing/calibration charges for trivector energy meter

1

-

53581.63

... More
Earthwork excavation in all types of soils (up to stone matrix)which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete and disope excess soil out side as per the the directions of the Engineer in charge for the finished item of work.

625

-

204.88

... More
Excavation in Ordinary rock (HDR, soft rock ) (not requiring blasting), The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge

33

-

282.36

... More
Providing Crusher dust cushion for foundations and basement in layers, not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.

77

-

955.63

... More
Providing sand filling within cable ducts including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work

6.5

-

909.96

... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.

43

-

4533.53

... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works , including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work For SWITCH YARD WORKS

11

-

69765.22

... More
PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc., complete

5.5

-

7396.92

... More
RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm size graded machine crushed hard granite metal (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work.

-

-

-

... More
Switchyard foundations

100

-

9953.08

... More
RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm and 12mm size machine crushed hard granite metal (50% each) (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and steel centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work(Sand 0.45 cum and Metal 0.90 cum) as directed by the Engineer in charge for finished item of work. For PRE CAST SLABS

32

-

8929.94

... More
Plain Cement concrete - Nominal Mix (1:2:4) with 12 to 20mm HBG metal with necessary form work including cost and conveyance of all materials, labour charges, water charges, tools and tackles, all leads & lifts etc., complete for finished item of work as per directions of the Engineer-in-charge. (IS-456) FOR CABLE DUCT WALL & RETAINING WALL TOPS including walls both sides shuttering

8

-

7654.62

... More
Construction of RR Masonry in CM (1:6) using hard CRS, rough granite stone and bond stones (0.16 cum) including cost and conveyance of all materials., labour charges, water lead , Curing, all leads and lifts etc., complete for finished item of work as per directions of the Engineer-in-charge.

75

-

4608.72

... More
Brick Masonry in CM (1:6) with Fly ash cement/ lime solid blocks with compressive strength not less than 50kg/sqcm confirming to IS: 12894-1990 class 5 of size 225 X 100 X 60 mm of approved quality, including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work . For Masonry works below 1.2m height

6.5

-

7664.11

... More
Plastering with CM (1:3), 12 mm thick and finishing smooth to the required slope including cost & conveyance of all materials, labour charges, leads, lifts and curing etc. complete as per the directions of the Engineer in charge for the finished item of work.

130

-

409.25

... More
Plastering with CM (1:5), 12 mm thick to the even wall surfaces including cost & conveyance of all materials, labour charges, leads, lifts and curing complete as per the directions of the Engineer in charge for the finished item of work.

180

-

396.97

... More
White washing two coats with white cement of approved quality to give an even shade after thoroughly brushing the surface to remove all dirt and remains of loose powdered materials including cost of all materials, labour charges and incidental charges such as scaffolding, lift charges etc., complete for finished item of work.

380

-

51.37

... More
Supply and spreading of crusher dust in the switch yard area including Suitable antiweed treatment after completion of final levelling and grading including disposal of surplus earth and filling within switch yard area including cost of all materials, all leads and lifts, labour charges complete as per the directions of the Engineer in charge for the finished item of work..

35

-

1191.76

... More
Supply and laying of 180 GSM LDPE sheet of approved make in the switch yard including laying the sheet neatly in between layers of crusher dust without folds to avoid the vegetation and weed growth, cutting and jointing the sheet properly including cost & conveyance of all materials, all leads , labour charges for laying complete as per the directions of the Engineer in charge for the finished item of work.

700

-

22

... More
Supply and Spreading of 20mm size Hard Broken Granite metal in switch yard including providing suitable PCC guage block of size 100x100x100mm at 2m x2m intervals , cost & conveyance of all materials, labour charges, leads, lifts complete as per the directions of the Engineer in charge for the finished item of work

70

-

2264.36

... More
Supply and fixing of 90/ 105 lbs rails poles over the transformer plinth including cost & conveyance of all materials, labour charges for cutting and fixing charges with lead and lift etc, complete

1450

-

76.63

... More
WATER SUPPLY ARRANGEMENTS TO EARTH PITS

-

-

-

... More
Supplying and fixing of Ashirvad/Ajay/Astral flowguard or equivalent CPVC pipes and fittings to meet the requirement of ASTM-D 2846 and are produced in CTS(Copper Tube Sizes 1/2" ton 2" Ashirvad flowguard SDR 13.5 pipes are made from idential CPVC compounds having the same physical properties for hot and cold water(IS 15778:2007) for water supply line to earth pits / toilets including cost and conveyance of pipe, CPVC specials such as elbows, Tees concealing same in walls and floors by cutting 34.9/ 28.6/ 22.2/15.9 mm dia to be included grooves, packing, finishing after laying pipe in position as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
34.9 mm OD pipe SDR 13.5

40

-

240.98

... More
28.6 mm OD pipe SDR 13.5

60

-

153.14

... More
22.2 mm OD pipe SDR 13.5

50

-

105.85

... More
Providing and fixing in position at all levels of the buildings PPR Ball Valve confirming to DIN standards 8077/8092 for water services for following sizes including jointing etc complete as per the directions of the Engineer in charge for the finished item of work.

-

-

-

... More
32 mm dia Nominal Bore

1

-

240.86

... More
25mm dia Nominal Bore

1

-

228.86

... More
20mm dia Nominal Bore

10

-

184.86

... More
Construction of Brick masonry chamber over the gully trap or peet valves & fitted with 304.8mm X 228.6mm size CI frame & Hinged cover as including cost & conveyance of all materials, labour charges complete for finished item of work as per the directions of the Engineer-in-charge

1

-

515.48

... More
Levelling by filling with borrowed earth (Other than Black cotton soil) by mechanical means including cost & conveyance of earth, depositing the soils in filling areas , spreading soils, breaking clods, sectioning and consolidation with three wheel 8 to 10 MT static Road Roller @ OMC to meet requirement as per standard specification , including all hire and operational charges of T&P and seigniorage charges, complete for finished item of work as per (Payment will be made based on level for finished item of work).

420

-

380.67

... More
Supply and planting of plants like flowering plants fruit bearing plants etc., including excavation of pits of size 0.6x0.6x0.6m., filling the pit with a mixture of red earth, sand, manure in the ratio of 2:1:1 including cost and conveyance of all materials with all leads and lifts including watering the plants for a period of six months, complete as per the directions of the Engineer in charge for the finished item of work.

20

-

287.96

... More
Providing and fixing in position at all levels of the building under floors and against walls 110mm dia (4kg/cm2) PVC pipes of prince / sudhakar or any ISI brand make with specials such as junctions, with or without access doors as required and fixing cowls at top wherever necessary including excavation and refilling wherever required,, testing etc. complete as per the directions of the Engineer in charge for the finished item of work.

6.5

-

165.5



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.