Transmission Corporation Of Andhra Pradesh Limited Tender
... More
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Transmission Corporation Of Andhra Pradesh Limited - APTRANSCO Tender
Civil And Construction
Electrical and Electronics
Water Storage And Supply
Electrical Works
Opening Date26 Jun 2024
Closing Date5 Jul 2024
Tender Amount₹ 39,74,045
Costs
EMD
₹ 79,481Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
739439Bid Award Id
ViewTender No
APT-e-09(CE/Zone/Kadapa)/2024-25Tender Authority
Transmission Corporation Of Andhra Pradesh Limited ViewPurchaser Address
-Website
http://www.aptransco.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Duoube Tension Hardware
7
-
4280.68
... More
Single tension Hardware
13
-
2066.18
... More
Midspan compression joints
20
-
512.94
... More
Repair sleeves
20
-
250.29
... More
vibration Dampers for panther ACSR
30
-
573.71
... More
Tension Hardware with earth bond
4
-
884.77
... More
Suspension Hardware with earth bond
2
-
861.08
... More
Midspan compression joints
4
-
117.42
... More
Supply of GI Tower parts including cost of Steel, Galvanisation, Fabrication and Transportation to Ramasamudram SS Site
12
-
107142.8
... More
Supply of GI bolts & Nuts
0.5
-
111510.89
... More
Danger Boards with Bolts & Nuts and washers
1
-
237.93
... More
Number plates with Bolts & Nuts and washers
1
-
214.24
... More
Phase plates (1 set = 3 Nos) with Bolts & Nuts and washers
1
-
251.32
... More
Anti climbing devices
1
-
3683.28
... More
Check survey,peg marking the tower positions on ground ,confirming to the approved profile and tower schedules using GPS,Total stations, Digital theodolites,etc.,
1
-
8015.56
... More
Setting of stubs with stub setting template:-Erection of stubs, stub template, fixing of jacks for supporting template, allignment and levelling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of CC movement of template from one location to other location( A minimum lead of 1KM is adopted) of 132 KV Narrow based tower
-
-
-
... More
132 KV Narrow based tower
1
-
23449.43
... More
Erection of all types of narrow based tower structures,including all types of extensions except JC Type towers up to 12 meters in full towers completed with all accessories such as step bolts number plates and punching the bolts after full tightening and check the tower vertically, phase plates and anticlimbing devices are also to be fixed wherever necessary. Under SHUTDOWN Condition
12
-
23195.63
... More
Dismantling of 6 Nos Panther Conductors Under SHUTDOWN Condition
0.96
-
134136.48
... More
Stringing of Power conductor:-Hoisting of tension insulators and suspension insulators,paving out the conductor,rough sagging,jointing, tensioning, clipping and fixing of preformed armour rods, fixing of vibration dampers etc., complete of 6 Nos. panther ACSR conductors and measuring ground clearance wherever necessary. Under SHUTDOWN Condition
1
-
178848.64
... More
Dismantling of 7/3.15 HTGS earth wire Under SHUTDOWN Condition
0.96
-
16949.94
... More
Stringing of Earthwire : Fixing hardware, paving out earthwire, jointing,tensioning, stringing and clamping of 7/3.15 mm high tensile galvanised steel wire Under Shutdown condition
0.96
-
22599.92
... More
Earthing of towers including cost of excavation,back filling, including cost of 25mm dia 2.5mm thick,class 'C'G.I.Pipe of 3mtrs length with 50x6mm GI Flat 4.05 mtrs long,char coal salt etc., and measuring tower footing resistance.
1
-
8218.66
... More
Half round welding of G.I.Bolts and nuts of towers in the section between ground level and upto bottom x-arm level including all boltsconnecting the bracings at bottom x-arm level and painting the welded portion with one coat of zinc rich paint.
1460
-
58.4
... More
Dismantling and re-stringing of 33 KV conductor for crossing of 33 KV lines during stringing of EHTlines
10
-
9127.34
... More
Dismantling and re-stringing of 11 KV conductor for crossing of 11 KV lines during stringing of EHTlines
15
-
4994.69
... More
Dismantling and re-stringing of LT line conductor/cables for crossing of LT lines during stringing of EHTlines
10
-
3144.46
... More
Transport of materials from Line store site to TLC Stores, kadapa
2
-
10663.2
... More
Loading and unloading charges of materials
1
-
7912.68
... More
Earthwork excavation in all types of soils (up to stone matrix) which can be excavated by mechanical means and manual means with pick axe and crow bar and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated suitable earth in 600mm thick layers, consolidation and constructing of platforms 150mm height around foundations utilizing the excavated earth, including labour charges for disposing surplus earth within initial lead away from site etc. complete as directed by Er - In - Charge.
270
-
207.93
... More
Excavation in Ordinary rock (including HDR, Soft rock, F&F rock ) (not requiring blasting) for foundations. The rate includes labour charges, cost of tools and tackles, disposing of unuseful excavated materail at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge
74
-
273.21
... More
Excavation in HDR, Soft Rock, F&F requiring blasting wherever necessary for foundations including dressing bed and sides to required level and profile. Th erate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavated material at all leads and lifts, complete for finihsed item of work as per directions of the Engineer-in-charge.
70
-
273.04
... More
Hard rock (requiring blasting) for foundations. The rate includes labour charges, cost of blasting materials, tools and tackles, safety measures, disposal of unuseful excavted material at all leads and lifts, complete for finished item of work as per directions of the Engineer-in-charge.
30
-
1079.9
... More
Extra towards dewatering charges over and above the excavation rate for the quantity of earth excavated below water table only, Where water table met between 0.75 to 1.50 m depth below Ground Level.
200
-
103.8
... More
Providing Crusher dust cushion for foundations and basement in layers, not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost & conveyance of all materials, operational, incidental, labour charges, hire charges of T&P at all leads, lifts etc. complete as per the directions of the Engineer in charge for the finished item of work.
1
-
1087.33
... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG metal Machine crushed for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
7
-
4534.8
... More
Providing High Yield Strength Deformed (HYSD)/ Thermo Mechanically Treated (TMT) (Fe 415 grade as per IS 1786-1979) of TISCO/ SAIL/ VSP make, different diameters for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap-splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars, including all wastages such as overlaps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work.
2.1
-
71647.8
... More
RCC M- 20 Nominal mix (Cement 400 kgs ) using 20mm & 12mm size graded machine crushed hard granite metal (in 2:1 ratio) (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc.,complete but excluding cost of steel and its fabrication charges for finished item of work.(cement 400 kg , sand 0.45 cum and metal 0.90 cum)
34
-
9577.47
... More
PCC M- 20 Nominal mix (Cement 330 kgs ) using 20mm & 12mm size graded machine crushed hard granite metal (in 2:1 ratio) (coarse aggregate) from approved quarry including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site and including Seigniorage charges, sales & other taxes on all materials including all operational, incidental and labour charges such as machine mixing, laying concrete, curing and centering, etc., complete
15
-
7344.37
... More
Plastering in CM (1:4), 12 mm thick including cost and conveyance of all materials, labour charges , water lead, curing, all leads and lifits etc complete for finished item of work as per directions of the Engineer-in-charge .
60
-
385.61
... More
PROTECTION WORKS
-
-
-
... More
Earthwork excavation in all types of soils (up to stone matrix) which can be excavated with pick axe and crow bars and do not require blasting in all conditions such as dry, wet and slushy etc. covering initial lead and lift etc and backfilling the foundations (after laying foundations) with excavated earth complete as per the the directions of the Engineer in charge for the finished item of work. .
25
-
198.29
... More
Laying of Cement Concrete (1:4:8) mix using 40mm size HBG Machine crushed metal for foundations including cost and conveyance of all materials at all leads and lifts, ramming, consolidating, curing etc,complete. for finished item of work as per directions of the Engineer-in-charge.
1
-
4534.8