Tirumala Tirupati Devasthanams Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Opening Date22 Jan 2020
Closing Date5 Feb 2020
Tender Amount₹ 30,49,056 This is an estimated amount, exact amount may vary.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
310338Bid Award Id
ViewTender No
104/EE-VI/TTD/VJA/2019-20Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filling of foundations and basement with Best river sand in layers of not more than 15 cms. Thick each well watered to saturation and consolidated including cost and conveyance of all materials, incidental charges etc., complete
20
-
1336.98
Filling with useful available excavated earth (excluding rock) in trenches,sides of foundations and basement with initial lead in layers not exceeding 15cm thick, consolidating each deposited layer by watering and ramming including cost and conveyance of water to work site and all operational, incidental, labour charges hire charges of T & P etc., complete for finished item of work.
2574.9999999999995
-
24.9
Plain Cement Concrete (1:4:8) using 40mm (0.54 cum) and 20mm (0.27 cum) and 12 mm (0.09 cum) HBG crushed metal from approved quarry for foundations etc., laid in layers of not more than 15cm thick well compacted including curing cost and conveyance of all materials etc., complete - using concrete mixer
20
-
4722.16
Cement Concrete (1:2.5:5) using 20 mm ( 0.54 cu.m) and 12 mm (0.36cu.m) nominal size hard broken granite crushed metal from any source conforming to the relevant ISI standards for foundations etc., laid in layers of not more than 15 cms thick well compacted including curing, ,machine mixing, cost and conveyance of all materials etc., complete.
6
-
5456
for Rafts & Footings
3
-
8265.5
for RCC Walls
5.5
-
10961.59
For Roof Slabs in F.F.excluding centering charges
2.4999999999999996
-
6096.1
-do-Centring Charges for Roof slab up to 150mm Thickness in 1st Floor
20
-
524.9
Construction of Brick Masonry in CM (1:6) using well burnt Bricks 2nd class or ground moulded ( Non- modular or traditional size) from Cherlopalli kilns/ approved kilns ( 230 x 110 x 70mm)including curing, cost and conveyance of all materials as directed during execution and complying with standard specifications etc., complete. For up to Basement
10
-
5974.29
-do- 65mm dia
2725
-
577.7
-do- 32mm dia
7.5
-
296.88
Laying and jointing of 65mm dia G.I. Pipes and G.I Specials of approved make such as tees, couplings(sockets), reducing tees, reducing sockets, reducing elbows, hex nipples, GI cross, long couplings and nipples where ever necessary including jointing the pipes or running along the walls/floor including making holes/grooving the walls and making it good with C.M (1:3) including cost of wooden plugs, cleats, clamps and screws as directed during execution including cost and conveyance of all materials etc.,complete. (Labour Charges Only )
2725
-
142.02
Supply and fixing of 65mm dia G.I. Reducing Tees to any smaller size of approved make./ISI marked
10
-
345.39
Labour charges for CUTTING of G.I Pipes. 32mm dia
15
-
21.59
Labour charges for THREADING of G.I Pipes. 32mm dia
30
-
40.9
Supply and ficing of 32 mm dia G.I. Tees of approved make/ISI mark
10
-
87.48
Supplying, laying, jointing, testing and commissioning the PVC pipes including couplers/ bends/ tees etc any diameter including fixing necessary fittings like bends, plugs, couplers,junctions, tees, etc with solvent jointing as per standard practice etc., complete as directed during execution.
110mm dai single socket PVC / SWR pipe 6 Kg/Sq.cm, Prince / Sudhakr or any ISI Brand
200
-
345.01
--do--In CM(1:3) 12mm thick
40.00000000000001
-
194.91
--do--In CM(1:5) 12mm thick
35
-
182.02
--do--In CM(1:5) 20mm thick
110
-
279.65
Providing impervious coat to exposed RCC roof slab surface with CM (1:3), 20mm thick with 500 ml of liquid concentrated micronized cement water proof compound complies with IS:2645-2003 of approved make per 50 kg bag of cement laid over roof when it is green including cost of all materials, conveyance charges of materials and all operational, incidental and labour charges for mixing mortar, laying, rendering smooth and thread lining, curing, rounding off junctions of wall and slab etc., complete for finished item.
55
-
388.98
for precast slabs 50 mm thick
15
-
358.56
Providing High Yield Strength deformed bars Fe 500 (HYSD)/ Thermo mechancially treated (TMT) steel bars of specified grade (as per IS 1786 - 1979) of different diametres for RCC works, including labour charges for straightening, cutting, bending to required sizes and shapes, placing in position with cover blocks of approved materials and size and tying and lap splicing with binding wire of 18 SWG, forming grills for reinforcement work as per approved designs and drawings, including cost and conveyance of steel bars including all wastages such as over laps, couplings, chairs, spacer bars including cost and conveyance of binding wire, cover blocks and all incidental, operational, labour charges such as cutting, bending, placing in position, tying including sales and other taxes on all materials etc., complete for finished item of work in all floors. (APSS NO.126)
1.6
-
55108.96
Machine mixed and vibrated design mix concrete M30 for pavement works for durability consideration with necessary reinforcement using 0.425 cum of 19mm to 22mm HBG crused metal, 0.425 cum of 12mm to 14mm IRC HBG crushed metal, 0.406 cum of sand of any approved quarry and cement 415kgs with water cement ratio of 0.38(158 lit/cum of C.C) well compacted including centring with steel or wooden frames, preferably steel frames in straight position casting, curing cost and conveyance of all materials including centring charges, form work,etc., complete but excluding cost of steel and binding wire, fabrication charges etc., complete as directed during execution and neat finishing of top surface and also providing expansion joints construction joints wherever found necessarry excluding cost of asphalt pad tetc., complete.
20
-
6771.6
Supply and Transportation of 5.00HP(80x80mm) Three phase ISI self priming Mono block IP44 motor pumpset . Makes: Kirloskar / Crompton / Texmo / CRI / KSB/Lubi/Aryen Varsha.
2
-
26358.68
Supply and Transportation of 4C x 4 sq.mm XLPE/PVC insulated & PVC sheathed armoured cables of 1.1 KV grade with copper conductor as per IS 7098 Part-I -1988 etc complete Make: Torrent / Universal / Unicab / Havells / KEI /Polycab/Gloster/Orbit/Avocab
60
-
249.95
Upto 7.5 HP with DOL Starter of.Make C&S.Crompton / L&T / Siemens/BCH.
1
-
9089.2
Un skilled Workmen
20
-
477.18
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements