Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Works
Publishing and Printing
Opening Date11 Jun 2024
Closing Date26 Jun 2024
Tender Amount₹ 12,69,489 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
do for 30 days

730

114631

157.03

... More
do for 3 days

350

38496

109.99

... More
Hire charges for erection and removal of temporary dias at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor / Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for Three (3) Days.

144

71184

494.34

... More
Hire charges for erection and removal of Shamiyanas with required posts, rope etc., including anchoring the ropes to the ground with suitable anchoring and incidental charges etc., complete as directed during execution. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete The rate is for One (1) days

1200

19608

16.34

... More
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustvam period and should be removed after the same is over and should be repaired or replaced as and when tornout by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days . Note:If, there is any deviation in the usage of good quality of cloth effecting the pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, a penalty will be imposed by the Engineer in charge.

-

-

-

... More
-do- for 30 days for Phalgunamasa Ustavams

1650

74860

45.37

... More
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days . the relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
-do- for 1 day

5210

211213

40.54

... More
-do- for 3 day

1500

63240

42.16

... More
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals.

820

87871

107.16

... More
The barrication provided such that it shall be 2m above ground level and 0.45 m pipe embeded in the ground with necessary earth work excavation in all soils upto 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals.

-

-

-

... More
The barrication shall be strongly fixed with out any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc., duly refilling the pits and levelling the surface et c., complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to aviod exposure of sharp edges.

-

-

-

... More
The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for Thirty (30) days.

-

-

-

... More
Hire charges for providing spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accedents,repairs and replacement etc., complete during the said period.

800

9112

11.39

... More
Hire charges for providing Plastic/Aluminium/Stainless steel water drums of storing capacity not less than 200 Ltrs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period.

100

7760

77.6

... More
Labour for attending the required works etc. complete as directed during execution

50

41989

839.78

... More
Man & Woman Mazdoors

-

-

-

... More
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for One (1) Day. (The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

2270

208544

91.87

... More
Hire charges for erection and removal of digital design flex boards with back support of frame work made with 25mm x 25mm M.S. square pipe (light weight) and to erect boards at specified places as directed by the department. The rate is including cost of required materials, labour for printing, erection and removal of square pipe (light weight) after completion of function.

4650

117226

25.21

... More
Hire Charges for erection and removal of steps to landing works using country wood/ Sliver Wood planks of size 3'x 2'l required size runners, nails fixing etc., and spreading red colour coir mat with two sides hand rails, etc., complete. The rate quoted is including conveyance of all materials such as nails and coir puri required for the work and labour charges for fixing and removal carefully after festival as directed, etc., complete, excluding scaffolding charges, but including supporting structure for steps. For each Festival/ Function

35

11846

338.48

... More
Labour charges for fixing various sizes of G.I Chain links and tying in position to the posts / angles or supports with G.I wire including the cost of the G.I wire etc., complete as directed during execution (excluding cost of G.I chain links angles, posts, bolts and nuts) and fixing with bolts and nuts to the angles.

135

1908

14.14



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.