Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Works
Civil And Construction
Civil Works Others
Opening Date24 Jul 2024
Closing Date7 Aug 2024
Tender Amount₹ 50,63,306 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
for 3 days

1000

33200

33.2

... More
Hire charges for providing & fixing of good quality GI sheets ( 22 to 26 gauge) ( plain or corrugated ) sheets to the available frame work for roof or sides for function/festival pendals.The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
For 10 days

3000

181920

60.64

... More
For 3 days

1000

50980

50.98

... More
For 1 days

3000

141600

47.2

... More
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the Festival/ Function etc., and the colour carpets should be cleaned every day and to keep neat appearance as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calendar days .* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
For 10 days

3000

138300

46.1

... More
For 3 days

1000

41500

41.5

... More
For 1 days

3000

119670

39.89

... More
Hire charges for providing Rain proof shelters of different spans with clear height of 14' at the ends and suitable height at center with central unsupported span of ranging 30' to 60'. The shelter shall be provided with adequate MS girders, trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheest/Aluminum sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drainedoff. (This rate is applicable when structure is provided using roof trusses.) Necessary rain water collection facility and drainage arrangement shall be made. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. .(The rate for pendals will be paid as per area of pendals measured on covering plan area). The rate is for below mentioned calendar days.. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
For 10 days

1000

231910

231.91

... More
For 3 days

250

48732

194.93

... More
For 1 days

1000

180480

180.48

... More
Hire charges for supply, spreading and removing of PVC chairs including loading and unloading. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

1000

11760

11.76

... More
Hire charges for providing of banquet chairs for VIPs including loading, unloading, transportation etc., complete. The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc., complete *The relevant conditions of the foot note mentioned at the end of these items/chapter applies .

100

4518

45.18

... More
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40mm diameter using 2.45 m long verticals and 3 to 6 metres horizontals. The barrication provided such that it shall be 2m above ground level and 0.45 m pipe embeded in the ground with necessary earth work excavation in all soils upto 0.45m to 0.60 m depth (except rock requiring chiselling). The Horizontals shall be in 3 rows one at 0.50 metres from bottom and balance two rows at 0.70 metres intervals leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals. The barrication shall be strongly fixed with out any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading unloading erection, removal etc., including conveyance charges to site (both ways ) and removing the same after completion of the festival and taking away the material etc., duly refilling the pits and levelling the surface et c., complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges.The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.

-

-

-

... More
for 45 days

2500

330050

132.02

... More
for 10 days

5000

456300

91.26

... More
for 3 days

500

38340

76.68

... More
for 1 days

3500

248465

70.99

... More
Hire charges for erection and removal of temporary dias at a height of 60 cms to 120 cms(2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
for 10 days

100

60207

602.07

... More
for 3 days

100

50600

506

... More
for 1 day

100

46852

468.52

... More
Hire charges for erection and removal of temporary Platform at a height of 15 cms to 30 cms (6" to 12") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made without undulation and without shaking. The rate quoted is including conveyance of all materials, hire charges and labour charges for fixing etc., complete . The rate is for below mentioned calendar days. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies

-

-

-

... More
for 10 days

500

113495

226.99

... More
for 3 days

100

19073

190.73

... More
for 1 day

3000

529770

176.59

... More
Hire charges for erection & removal of side wall up to required height with frill type cloth of approved make and colour with back supporting cloth fixed to frame as directed during execution for the function, the Side curtains should be neat and with good appearance in all days , if spoiled in any manner and the same should be replaced immediately. The rate quoted is including all incidental charges & other taxes as applicable etc., complete. The rate is for below mentioned calendar days .The rate is for below mentioned calendar days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies- for 1 day

100

5377

53.77

... More
Hire charges for supply of steel dining tables of size 1’6” x 6’0” including loading and unloading. *The rate is including maintenance, watch and ward, against theft and fire accidents, repairs and replacement etc., complete during the said period. Rate is including all taxes, Transportation etc.,complete *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

10

629

62.98

... More
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution .

-

-

-

... More
For 10 days

3000

553320

184.44

... More
For 3 days

100

15338

153.38

... More
for 1 day

4000

567440

141.86

... More
Hire charges for erection and removal of side curtains with water proof PVC coated Lacquered Finish Fabric/ any other suitable material on both sides of the sloped gallery or any other Shelter with M.S pipe frame work including necessary bolts, nuts, etc., complete as directed during execution. The rate is for below mentioned calendar days.

-

-

-

... More
For 3 days

250

43237

172.95

... More
For 10 days

350

62345

178.13

... More
Supply of Synthetic colour carpet  Red / Green colour for VVIPs visitings  (sundaram or opt or any equivalent brand/make)

600

218928

364.88

... More
Hire charges for Crane – 80 Tonnes lifting purpose

60

100902

1681.71

... More
Hire charges for MS Pipe Scaffolding -  using  MS pipes of 40mm diameter and special type gripper clamps  ("Nandu" clamps) and  after completion of work scaffolding should be removing carefully . The rate quoted is including conveyance of  all materials  and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies. up to 15 Mtrs height 

100

52518

525.18

... More
Hire charges for erection and removal of flat/sloped roof M.S pipes pendals using 40mm MS pipes for verticals. horizontals and roof supports etc., fixing with, special type gripper MS clamps (Nandu clamps) , extra horizontal bracings should be provided from at 2.40 m to roof level and jointing with special type gripper MS clamps ( Nandu clamps)for horizontal bracings and column roofing including earth work excavation in all soils (Except rock requiring blasting) to a depth of 0.40m to 0.60m. The vertical posts are to be fixed strongly without any shaking. The entre roof shall be made of one layer of nylon net with opening of size 100 x 100 mm .The nylon net must be provided with suitable openings alround for stiffness and for tying at the ends and over that the entire roof shall be covered suitably with Green shade net 125 GSM. The rate including conveyance and hire charges of all materials such as MS pips, Clamps, Green shade net and safety net etc. and labor charges for fixing and removal etc., complete. The rate is for below mentioned calendar days. *The relevant conditions of the foot note mentioned at the end of this items/chapter apply.

-

-

-

... More
For 3 days 

150

27358

182.39

... More
For 10 days 

100

22277

222.77

... More
Hire charges for providing Pagodas of 20ft x 20ft size with clear height of 10' at the ends and 14' height at centre. The pagodas shall be provided with adequate MS trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The entire roof shall be covered suitably with Fabric firmly fixed to the purlins etc., The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. *The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
For 3 days 

5

71877

14375.52

... More
For 10 days 

10

165454

16545.41

... More
Note: 

-

-

-

... More
1.     Erection should be completed before two days of Festival/ Utsavam as directed during execution for Pendals,  Barrication and Dias.  2. Suitable tying arrangements shall be made such that the pendals/shelters laid shall withstand heavy wind & rain. 3. Proper slopes shall be maintained for smooth drainage of rain water. 4. The shelter provided shall be capable to support necessary illumination, PA system, decoration work, display TVs etc., 5. The agency shall allow the electrical / flower decoration/ PA system etc., over the shelter/barrication/ ceiling cloth etc., without any extra cost. 6. Adequate watch and ward shall be provided by the agency at his cost and dept. will not be responsible for any loss due to thefts/accidents etc., 7. All the sharp projections shall be adequately covered with rubber sheet to avoid possible injuries. 8. The rain proof shelters provided shall be leak proof.

-

-

-

... More
Rupees fifty lakhs sixty three thousands three hundred and six and paise ten only

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.