Tirumala Tirupati Devasthanams Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Opening Date30 Jun 2020
Closing Date13 Jul 2020
Tender Amount₹ 4,59,199
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
339640Tender No
48/DE(Elec)-Tml/TTD/2020-21Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Filteration of transformer oil as per ISS specifications filters to die electric strength above 40 K.V at site. (per Ltr)
-
-
-
at site.
10300
-
10.71
Carryout routine maintenance, servicing and testing of 630A to 1000A L.T.ACB by cleaning fixed contacts, moving contacts and arcchutes including servicing and putting the ACB in perfect working condition after detting all relay and ON, OFF mechanism etc done with only manufacturing companies
1
-
5355.75
Carryout routine maintenance and servicing of LT.Cubical pannel board having approximately 15 to 22 Nos of switches cleaning with power blower and servicing the contacts, tightning the connection of incoming and outgoing cables, and checking the operating machanism for smooth functioning of switches and putting them in smooth working condition.
1
-
3213.45
Removing the existing transformer from the plinth / Pole and refixing the standby transformer of following capacity including connections etc., complete.
-
-
-
Upto 315 KVA
2
-
3749.03
Removing the existing transformer from the plinth / Pole and refixing the standby transformer of following capacity including connections etc., complete. -
-
-
-
500 / 1000 KVA
2
-
4820.18
Replacing old and unserviceable gasket of top cover plate of transformer having following capacity.
-
-
-
Upto 315 KVA
2
-
803.36
Replacing old and unserviceable gasket of top cover plate of transformer having following capacity.
-
-
-
500 / 1000 KVA
2
-
1071.15
Replacing old and unserviceable gasket of H. T bushing for the following Transformer capacity.
-
-
-
Upto 315 KVA
2
-
374.9
Replacing old and unserviceable gasket of H. T bushing for the following Transformer capacity. -500 / 1000 KVA
-
-
-
500 / 1000 KVA
2
-
803.36
Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity.
-
-
-
Upto 315 KVA
2
-
964.04
Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity.
-
-
-
500 / 1000 KVA
2
-
1606.73
Replacement the H T / L. T burntout winding coils of distribution transformer including rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the Contractor / Firm
-
-
-
For copper coils
25
-
642.69
Replacement the H T / L. T burntout winding coils of distribution transformer including rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the Contractor / Firm
-
-
-
For aluminium coils
20
-
428.46
Insulating HT / LT copper / aluminium coils for Transformers.
1
-
348.12
Painting to transformer with 2 coats Zinchromate red oxide duly scraping existing paint followed by 2 coats of hammerton grey paint etc., complete.
-
-
-
Upto 500 KVA
5
-
3749.03
Replacing H.T bushing for distribution Transformer by new one.
1
-
374.9
Replacing H.T bushing metal parts for distribution Transformer by new one.
1
-
428.46
Replacing L.T bushing for distribution Transformer by new one for the following capacities. - Upto 315 KVA
2
-
214.23
Replacing L.T bushing for distribution Transformer by new one for the following capacities.- 500 / 1000 KVA
2
-
267.79
Replacing L.T bushing rod metal parts for distribution Transformer by new one for the following capacities. -upto 315 KVA
2
-
535.58
Replacing L.T bushing rod metal parts for distribution Transformer by new one for the following capacities. -500 KVA
2
-
1981.63
Drying the repaired transformer with appropriate heat / air of following capacity of transformers.
-
-
-
Upto 315 KVA
2
-
4713.06
500 / 1000 KVA
2
-
5891.33
Loading and Unloaidng of transformer from site to Workshop or vice verse.
-
-
-
Upto 500 KVA
2
-
4329.58
Supply and fixing of distribution type lightning arrester 11 KV 5 kA as per IS 3070 with mounting base on the existing DP structure
1
-
2677.88
Supply and erecting porcelain disc type insulator suitable for 11KV line with suitable hardware on existing cross arms.
2
-
577.35
Supply and fixing of 11 KV pin Insulator (IS 731/1971 ) with minimum creepage distance of 300 mm on existing cross arm including all accessories like Hot dip GI spindle and nuts etc.,
2
-
214.23
Supply and erecting porcelain post type insulator suitable for 11KV line with suitable hardware on existing cross arms.
2
-
649.12
Supply and fixing of LT pocelain pininsulator as per IS 1447-1997 suitable for working voltage 1100 V including all accessories like Hot dip GI spindle and nuts etc.,.
-
-
-
100 x 65 mm
2
-
85.69
100 x 85 mm
2
-
96.4
Supply and fixing of 11 KV ,400 A 3 phase central post rotating double break type AB switch(isolator) as per IS 9921) without earth blade,gang operated ,Hozizontal type,operating mechanism with GI spring loaded reverse loop type fixed contact,solid HD electrolytic copper tubular moving contact with silver/Nicle plated at end points,9 Nos post insulators of 12 Kv(IS 2594 and IS 5350) ,Hot Dip galvenizing hardware,GI pipe,Nuts and bolts etc., complete
1
-
19280.7
Dismantling charges of old AB switch
1
-
1440
Erection charges of new AB switch
1
-
2880
Supply of new and tested transformer oil as per IS-335 - 1972 (per Ltr)
250
-
128.54
Supply and fixing the 1.0 KG Transporent Silicagel breather
15
-
1483.05
Supply and fixing of 11 KV danger plates on the existing poles
10
-
107.12
Supply of 11 KV / 22 KV Hand gloves
10
-
200
Supply of First Aid box 18" x 12" x 8"
5
-
1075
Cable root Indicators of size 152mm round / 102mm x 102mm /
152mm x 152mm
5
-
85
Supply and fixing of PVC synthetic elastomer electrically insulated mat conforming to IS: 15652-2006 with
-
-
-
Class A insulation having 2mm thickness upto 3.3KV
5
-
4070.37
Class B insulation having 2.5mm thickness upto 11KV
5
-
4177.49
Supply of round bottom G.I sheet bucket of 9 Ltrs. Capacity as per IS:2546 made out of 24 gauge GI sheet with extra handle at bottom duly painted inside and red out side with printed with FIRE Mark for stand and hook and filled with sand and arranged to existing stand or hook. ( MR )
2
-
289.21
Providing floor mounting stand for keeping 4No of fire bucket 1500mm length, 900mm height made out of 40x40x6mm angle iron welded with 4 hooks and duly painted with one coat of red lead and two coats of enamel paint.
2
-
1178.27
Less buy back offer for old oil from existing transformer
150
-
-25
NOTE
(i)The rates are of basic rates excluding GST.
(ii) The applicable GST will be reimbursed/paid as peractuals on
production of proof.
(iii)Statutory deductions will be made as per norms, if applicable. Any modalities imposed on GST by the Government from time to time, the same will be implemented.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements