Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Works
Electrical and Electronics
Electrical Works
Opening Date2 Jul 2024
Closing Date18 Jul 2024
Tender Amount₹ 34,11,665 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
For Three Days

40

1714

42.85

... More
For Five Days

530

27819

52.49

... More
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges)

-

-

-

... More
For one Day

35

824

23.57

... More
For Three Days

35

1687

48.2

... More
For Five Days

40

2142

53.56

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

4

1178

294.57

... More
For Three Days

4

1949

487.37

... More
For Five Days

26

15456

594.49

... More
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

3

941

313.85

... More
For Three Days

3

1847

615.91

... More
For five Days

3

2461

820.5

... More
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

2

4498

2249.42

... More
For Three Days

2

8483

4241.75

... More
For five Days

3

17513

5837.77

... More
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

35

749

21.42

... More
For Three Days

35

1274

36.42

... More
For Five days

50

2142

42.85

... More
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges)

-

-

-

... More
For one Day

35

599

17.14

... More
For Three Days

35

3561

101.76

... More
For five Days

40

5570

139.25

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

10

117

11.78

... More
For Three Days

10

192

19.28

... More
For five Days

10

224

22.49

... More
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

250

335

1.34

... More
For Three Days

250

670

2.68

... More
For five Days

400

1456

3.64

... More
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed.

-

-

-

... More
For one Day

250

510

2.04

... More
For Three Days

250

1165

4.66

... More
For five Days

250

1540

6.16

... More
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. ii) 30/60 Amps TPST / TPIC switch with pilot lamp and neutral link

-

-

-

... More
For one Day

2

34

17.14

... More
For Three Days

2

79

39.63

... More
For five Days

4

207

51.95

... More
Erection and removal of 12’ to 25’ insulated iron / insulated GI pipe / wooden post for fixing of LED thoranams / MH fittings / LED fittings / Halozen fittings etc, as directed during execution. Per programe maximum upto ten days.

18

578

32.13

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
For Srivari Brahmotsavams / Sri K.T.Temple Brahmotsavams

-

-

-

... More
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days.

10900

782293

71.77

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days.

300

47880

159.6

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Ten days

6000

395280

65.88

... More
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design. 2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS. 3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Ten days.

10100

400263

39.63

... More
Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required.2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Figures wherever necessary as directed during execution including providing necessary struts, ties, bracings etc, from bottom to 10 meter.

-

-

-

... More
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident.

-

-

-

... More
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates. 5. The measurements shall be given for the front view of the scaffoldings. 6. 10% extra will be paid for 4-mada streets at Tirumala.

-

-

-

... More
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)

-

-

-

... More
8. The above rates are excluding GST.

-

-

-

... More
From bottom to 10 meter.

500

68125

136.25

... More
From bottom to 20 meter.

300

42417

141.39

... More
Hire Charges for Erection and removal of scaffolding for erection of Electrical illumination Road Arches wherever necessary as directed during execution including providing necessary struts, ties, bracings etc. for single side arch

200

34726

173.63

... More
Note:- 1. TTD Lorry to be arranged on Free of cost for transportation of scaffolding materials To and Fro exclusive for scaffolding works for erection of electrical cutout at Tirumala except for works at Tirupati and Tirchanoor and transportation charges will be paid separately for outside places, 2. Erection should be completed before Two days of commencement of the Festival / Utsavam. 3. The TTD has not responsible for theft and fire accident.

-

-

-

... More
4. The existing scaffolding shall be reused are continued upto 2 Months and the rate shall be allowed for such extension at 25% less over the above rates.

-

-

-

... More
5. The measurements shall be given for the front view of the scaffoldings.

-

-

-

... More
6. 10% extra will be paid for 4-mada streets at Tirumala.

-

-

-

... More
7. Transportation charges will be paid for outside places 15% extra for Tirupati rates (beyond 18 KMs)

-

-

-

... More
8. The above rates are excluding GST.

-

-

-

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days

595

458881

771.23

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days

20

749

37.49

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Labour charges for arranging focus lighting and dragging of portable / small generator for vahanam procession during night times on occasion of festivals. For Ten days

3

22815

7605.17

... More
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral. For Ten days

10

2410

241.01

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day

4

17995

4498.83

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast aluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Ten days

175

206197

1178.27

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Ten days

100

26779

267.79

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days

450

2412

5.36

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days

450

3613

8.03

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Ten days

35

318

9.1

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
For Sri K.T.Temple / SVBC Studio for Karthikamasam Homas/ Vrathams etc.,

-

-

-

... More
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of festival decorative Series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days.

175

34588

197.65

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for creeping type LED Navara Patty Set which consisting 100 Nos. LED lamps of RED, YELLOW, GREEN, BLUE and WHITE colours with creeping/ ordinary. The LED’s are accommodated in a small box with control resistance wherever necessary. The supply will be fed to the LED with Electronic circuit wire connection. The rate is inclusive of transport to the site, erection and removal (Note: The rate should inclusive of transportation, erection and removing charges) - For Thirty days.

35

15384

439.55

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for providing LED Design boards of different deities / designs etc, as directed during execution with different colours & Lights to operate at 230V, Single phase supply. The boards should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connections. (Note: The rate should inclusive of transportation, erection and removing charges) - For Thirty days

35

6350

181.43

... More
Note:- 1) The specified designs board should have made with painting on the front side so that in day times, the design is appears as painting board, and in night times the replica of design is to be appear with colour LEDs so as to lit the natural colour of the deity / design. 2) The LED's are to be arranged to the board with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS. 3) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 4) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for providing LED Lamps / LED rope Bamboo stick designs of different deities, Arches & designs etc., as directed during execution with different colours & Lights to operate at 230 V, Single/Three phase supply. The deites, Arches & designs etc, should be fixed firmly on existing scaffolding / as directed during execution and giving necessary connection. (Note: The rate should be inclussive of transportation, erection, testing and removing charges etc) - For Thirty days.

35

3820

109.15

... More
Note:- 1) The 6.2 V Bamboo stick designs of different dieties, Arches & designs etc., where ever necessary are to be arranged the deties, Arches & designs etc., with / without creeping circuits. Each circuit is connected through a step down transformer / SMPS if required. 2) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins. 3) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 150 / 200 / 240W LED Flood Light Fitting with all accessories including suitable wire and controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

85

180540

2124

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supply, Fixing, Wiring, Servicing & Maintaining of 4’ - 40Watt Strip type fluorescent fitting / T5 / LED batten fitting with all accessories including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials, loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

10

1032

103.25

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying wiring and maintaining suitable size LT panel board with pilot lamp arrangements and the following switches wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. i) 100/200 Amps TPST / TPIC switch with pilot lamp and neutral. For Thirty days

5

3318

663.75

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying, fixing, wiring and 62.5 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day

32

143962

4498.83

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Transportation charges for DG set of 62.5 KVA to 125 KVA for Tirumala including loading and unloading charges. The distance for transportation is to be accounted from the place of hiring to the workspot.

28

599

21.42

... More
Supply, Transportation of Diesel Oil for DG set

1800

175590

97.55

... More
Hire charges for temporary illumination, consisting of 54W LED RGB Parcan light fitting non integral weather proof die cast alluminium housing with IP66 protection wih control gear box, control gear with required cables, holder, mains duly erected with required scaffolding and dismantled on existing poles including cost and conveyance of all materials and labour charges etc., complete. For Thirty days

10

32450

3245

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire Charges for Supplying, Fixing, Wiring, Servicing and Maintaining of LED, RGB PIXEL series Sets consisting of 50 to 100 Nos of Bulbs including suitable wire & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., complete. (The work includes drawing of GI wire for tightening of the sets) - For Thirty days

10

7375

737.5

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 2 of 2.5 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm PVC insulated sheathed Aluminium / copper wire, PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

70

1032

14.75

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 4 of 2 Sq.mm / 4sq.mm / 6sq.mm / 10 sq.mm / 16sq.mm PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

70

1445

20.65

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for Supplying and running circuit service mains with 4 of 7/16 PVC insulated sheathed Aluminium / copper wire PVC tape, Clips etc., wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

10

250

25.08

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying, fixing, wiring and 125 KVA DG set with suitable change over switch, cables and connections. The DG set should be maintained for all the 24 hours for running the set with operator wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed (Excluding the cost of Diesel Oil) - For One day

10

56235

5623.54

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying, fixing, wiring, servicing and maintaining pedestal fan / Pedestal 18/24” Air circulators with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

10

27258

2725.8

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-

... More
Hire charges for supplying, fixing, wiring, servicing and maintaining Jumbo Air cooler Heavy duty with suitable wires & controls wherever necessary as directed during execution and removal, transportation of all materials loading and unloading after end of the programme (Festivals / Utsavams) and all labour charges etc., completed. For Thirty days

4

96760

24190

... More
Note:- 1) Erection and Testing should be completed before one day of the Festival / Utsavam etc., begins.

-

-

-

... More
2) Necessary watch and ward against fire accident, safety measures and without interruption should be maintained during the Programme / Festival functions.

-

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.