Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Works
Electrical Generators And Transformers
Electrical and Electronics
Electrical Works
Opening Date5 Jul 2024
Closing Date22 Jul 2024
Tender Amount₹ 9,31,179 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) Checking of oil leakage at Tank, bushing and cleaning etc.,

-

-

-

... More
(b) Checking oil level in conservator tank

-

-

-

... More
(c) Checking of Earth Flat connections at transformers.

-

-

-

... More
(d) Checking colour of Silica-gel and reactivating or replacing.

-

-

-

... More
(e) Checking the diaphragm for cracks.

-

-

-

... More
(f) Maintenance Reports to be submitted.

-

-

-

... More
Quarterly

-

-

-

... More
(a) Measurement of Voltages at Transformer and tail ends of the feeder.

-

-

-

... More
(b) Measurement of loads in ampehers on earth

-

-

-

... More
(c) Taking IR values of the winding.

-

-

-

... More
(d) Above Maintenance Reports to be submitted.

-

-

-

... More
Yearly

-

-

-

... More
(a) Collecting oil samples for di-electric strength

-

-

-

... More
(b) Above Reports to be submitted.

-

-

-

... More
For 1st year 2024-2025

9

43381

4820.18

... More
For 2nd year 2025-2026

9

43381

4820.18

... More
For 3rd year 2026-2027

9

43381

4820.18

... More
Testing of Transformer oil for dielectric breakdown strength.

-

-

-

... More
For 1st year 2024-2025

9

5784

642.69

... More
For 2nd year 2025-2026

9

5784

642.69

... More
For 3rd year 2026-2027

9

5784

642.69

... More
Filteration of transformer oil as per IS specifications to die electric strength above 40 K.V at site. (per Ltr) (Excluding Transportation)

-

-

-

... More
at site.

-

-

-

... More
For 1st year 2024-2025

3500

37485

10.71

... More
For 2nd year 2025-2026

3500

37485

10.71

... More
For 3rd year 2026-2027

3500

37485

10.71

... More
Carryout routine maintenance and servicing of LT.Cubical pannel board having approximately 15 to 22 Nos of switches cleaning with power blower and servicing the contacts, tightning the connection of incoming and outgoing cables, and checking the operating machanism for smooth functioning of switches and putting them in smooth working condition.

-

-

-

... More
For 1st year 2024-2025

9

28921

3213.45

... More
For 2nd year 2025-2026

9

28921

3213.45

... More
For 3rd year 2026-2027

9

28921

3213.45

... More
Removing the existing transformer from the plinth / Pole and refixing the standby transformer of following capacity including connections etc., complete.

-

-

-

... More
Upto 315 KVA

2

7498

3749.03

... More
500 / 1000 KVA

2

9640

4820.18

... More
Replacing old and unserviceable gasket of top cover plate of transformer having following capacity.

-

-

-

... More
Upto 315 KVA

2

1606

803.36

... More
Replacing old and unserviceable gasket of top cover plate of transformer having following capacity.

-

-

-

... More
500 / 1000 KVA

2

2142

1071.15

... More
Replacing old and unserviceable gasket of H. T bushing for the following Transformer capacity.

-

-

-

... More
Upto 315 KVA

2

749

374.9

... More
Replacing old and unserviceable gasket of H. T bushing for the following Transformer capacity. -500 / 1000 KVA

-

-

-

... More
500 / 1000 KVA

2

1606

803.36

... More
Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity.

-

-

-

... More
Upto 315 KVA

2

1928

964.04

... More
Replacing old and unserviceable gasket of L.T bushing for the following transformer capacity.

-

-

-

... More
500 / 1000 KVA

2

3213

1606.73

... More
Replacement the H T / L. T burntout winding coils of distribution transformer including rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the Contractor / Firm

-

-

-

... More
For copper coils

3

1928

642.69

... More
Replacement the H T / L. T burntout winding coils of distribution transformer including rewinding, varnishing and vaccuming etc.,duly retaining the removed burnt winding coils by the Contractor / Firm

-

-

-

... More
For aluminium coils

5

2142

428.46

... More
Insulating HT / LT copper / aluminium coils for Transformers.

5

1740

348.12

... More
Painting to transformer with 2 coats Zinchromate red oxide duly scraping existing paint followed by 2 coats of hammerton grey paint etc., complete.

-

-

-

... More
Upto 500 KVA

1

3749

3749.03

... More
Replacing H.T bushing for distribution Transformer by new one.

1

374

374.9

... More
Replacing H.T bushing with metal parts for distribution Transformer by new one.

1

428

428.46

... More
Replacing L.T bushing for distribution Transformer by new one for the following capacities. - Upto 315 KVA

2

428

214.23

... More
Replacing L.T bushing for distribution Transformer by new one for the following capacities.- 500 / 1000 KVA

2

535

267.79

... More
Replacing L.T bushing rod with metal parts for distribution Transformer by new one for the following capacities. -upto 315 KVA

2

1071

535.58

... More
Replacing L.T bushing rod with metal parts for distribution Transformer by new one for the following capacities. -500 KVA

1

1981

1981.63

... More
Drying the repaired transformer with appropriate heat / air of following capacity of transformers.

-

-

-

... More
Upto 315 KVA

1

4713

4713.06

... More
500 / 1000 KVA

1

5891

5891.33

... More
Loading and Unloaidng of transformer from site to Workshop or vice verse.

-

-

-

... More
Upto 500 KVA

1

4820

4820.17

... More
Supply and fixing of distribution type lightning arrester 11 KV 10 kA as per IS 3070 with mounting base on the existing DP structure

12

32134

2677.88

... More
Supply and erecting porcelain disc type insulator suitable for 11KV line with suitable hardware on existing cross arms.

2

1154

577.35

... More
Supply and fixing of 11 KV pin Insulator (IS 731/1971 ) with minimum creepage distance of 300 mm on existing cross arm including all accessories like Hot dip GI spindle and nuts etc.,

2

428

214.23

... More
Supply and erecting porcelain post type insulator suitable for 11KV line with suitable hardware on existing cross arms.

2

1298

649.12

... More
Supply and fixing of LT pocelain pininsulator as per IS 1447-1997 suitable for working voltage 1100 V including all accessories like Hot dip GI spindle and nuts etc.,.

-

-

-

... More
100 x 65 mm

2

171

85.69

... More
100 x 85 mm

2

192

96.4

... More
Supply and fixing of 11 KV ,400 A 3 phase central post rotating double break type AB switch(isolator) as per IS 9921) without earth blade,gang operated ,Hozizontal type,operating mechanism with GI spring loaded reverse loop type fixed contact,solid HD electrolytic copper tubular moving contact with silver/Nicle plated at end points,9 Nos post insulators of 12 Kv(IS 2594 and IS 5350) ,Hot Dip galvenizing hardware,GI pipe,Nuts and bolts etc., complete

1

19280

19280.7

... More
Dismantling charges of old AB switch

2

2880

1440

... More
Erection charges of new AB switch

1

2880

2880

... More
Supply of new and tested transformer oil as per IS-335 - 1972 (per Ltr)

150

19281

128.54

... More
Supply and fixing the 1.0 KG Transporent Silicagel breather

8

11864

1483.05

... More
Supply and fixing of 11 KV danger plates on the existing poles

10

1071

107.12

... More
Supply of 11 KV / 22 KV Hand gloves

10

2142

214.23

... More
First Aid box 18" x 12" x 8"

5

5757

1151.49

... More
Cable root Indicators of size 152mm round / 102mm x 102mm / 152mm x 152mm

5

455

91.05

... More
Supply and fixing of PVC synthetic elastomer electrically insulated mat conforming to IS: 15652-2006 with

-

-

-

... More
Class A insulation having 2mm thickness upto 3.3KV

10

40703

4070.37

... More
Class B insulation having 2.5mm thickness upto 11KV

6

25064

4177.49

... More
Supply of round bottom G.I sheet bucket of 9 Ltrs. Capacity as per IS:2546 made out of 24 gauge GI sheet with extra handle at bottom duly painted inside and red out side with printed with FIRE Mark for stand and hook and filled with sand and arranged to existing stand or hook. ( MR )

8

2313

289.21

... More
Providing floor mounting stand for keeping 4No of fire bucket 1500mm length, 900mm height made out of 40x40x6mm angle iron welded with 4 hooks and duly painted with one coat of red lead and two coats of enamel paint.

2

2356

1178.27

... More
Danger Notice Plates of size shall comply with IS:2551-1982

-

-

-

... More
250x200mm

10

2410

241.01

... More
200x150mm

15

3213

214.23

... More
150x100mm

20

2142

107.12

... More
Shock instrution chart in English / Hindi / Telugu duly framed with front glass

8

3856

482.02

... More
Supply of Danger sticker size of 6" x 6" - Make :PROLITE HSN / SAC Code : 49.11.9990

100

8300

83

... More
Supply of Danger sticker size of 2" x 2" - Make :PROLITE HSN / SAC Code : 49.11.9990

500

4125

8.25

... More
Supply of Danger sticker size of 3" x 3" - Make :PROLITE HSN / SAC Code : 49.11.9990

50

873

17.46

... More
Supply of Lockout Tags - Made from semi-rigid plastic of 0.5mm thickness all tages have a right on surface. They with stand moisture / grease & dirt ( Pack of 10 Nos) Make: ESQUARE HSN / SAC Code : 84.66.9400

5

1115

223.1

... More
Supply of ES-DEL-KD+M De Electric safety lock outpadlock with nylon shackle -key different Make:ESQUARE HSN / SAC Code : 83.01.4090 (set of 10 nos + 1master Key)

10

5771

577.15

... More
Supply of First Aid treatment chart with 8mm thickness MDF photo lamination - Multi color Size of 18" x24" HSN / SAC Code : 44.11.9429

2

1513

756.6

... More
Supply ES-KC-CF -60 key cabinet with fascia - 60 keys Make:ESQUARE HSN / SAC Code : 84.66.9400

1

4171

4171

... More
Supply of Warning - Glo signages made of robust & Durable self adhesive sheet & Best photoluiminescent materials which will Glo intensily in the dark. Size : 200mm X 200mm Sign: Danger (word & Pictogram) Model: W17 Make : PROLITE - HSN/SAC CODE :39.20.9999

30

11058

368.6

... More
Providing earthing as per IS 3043/ 1987 with 100mm (ID), 13mm thick C.I. Pipe of 3.0 mtr. length after excavating an earth pit of size1.5 m X 0.9 M X 3.00M(Top 1.50 m X 1.20 m X 0.9m & bottom 1.20 M X 1.20 M X 1.65 M) and filling with a homogenous layer of 40 Kgs. of Coke/ Char Coal, 20 Kgs. of Salt and the required quantity of sand around 100mm pipe from the bottom of the pipe to a height of 2.7mtr. and filling the remaining excavated portion with earth and consolidation/ Settlement of the trench should be done by filling with sufficient quantity of water.

4

33952

8488.2

... More
A concrete bed of size 0.8 M X 0.8 M X 0.1 M thick and an inspection chamber having inside measurements of 0.4 M X0.4 M X 0.4 M with wall thickness of 100 mm with cement concrete CC (1:2.5:5) using 20 mm HBG Metal is to be constructed with side wall 100 mm above ground level and plastering the exposed walls neatly with CM 1:3 with 12 mm thick. The Top of the Inspection Chamber is to be provided with reinforced precasted RCC Slab with 40mm thick with lifting hook. The top of C.I. Pipe is to be fixed & welded with suitable G.I. Wire mesh funnel 50mm x 6mm G.I. Strip having length of 300mm is to be fixed to the top of C.I. Pipe with G.I. Clamps fabricated with 50 x 3mm G.I. Flats with necessary bolts and nuts and necessary welding to be done to the clamps and C.I. Pipe. 2 Nos. of holes are to be drilled on either side of G.I. Flat for Extending earth connections.

-

-

-

... More
65mm dia PVC Pipe is to be embedded at the pit entry for earth. After laying earth from earth conductor bus to Electrode trough PVC Pipe, the surface should be covered with bitumen and grease. The cost of GI/Copper flat to be run from CI Pipe electrode to the equipment is to be made separately on running meter basis. The work shall be executed strictly as per IS 3043 - 1987. The rate includes cost and conveyance of all materials, labour charges, incidental charges etc., complete (Note:- Necessary meggaring testing is to be carried out in the presence of concerned Engineers and measurement of resistance shall be as per ISI standards)

-

-

-

... More
Providing of Independent Earthing as per IS 3043 of 1987 with Copper Plate of 600 mm X 600 mm X 3.15 mm thick of Electrolytic grade buried the top of the plate below 2 M from ground level after excavating an Earth pit of 1.5 x 0.9 x 2.55 m (Top 1.50m X 0.90m X 0.90m) and Bottom (1.20mX 0.90m X1.65 m) rigidly fixed to 40 mm dia GI pipe of 2 m long with 3 Nos. of 25 mm X 6 mm Clamps with suitable bolts, & nuts. 2 Nos. of 25 mm X 6 mm Copper Flats of 2 M long are to be fixed with brass bolts & nuts and brazed at bottom side to the copper plate on either side of the GI pipe. A concrete bed of size 0.8 M X 0.8 M X 0.10 M thick and an inspection chamber having inside measurements of 0.4m X0.4 m X 0.4 m with wall thickness of 100 mm with cement concrete CC 1:2.5:5 using 20 mm HBG Metal is to be constructed with side wall 100 mm above ground level and plastering the exposed walls neatly with CM 1:3 with 12 mm thick. The Top of the inspection chamber is to be provided with reinforced precasted RCC slab with 40 mm thick with lifting hook. The top of the 40 mm dia GI pipe is welded with reducer and 0.3 M , 20 mm dia GI pipe. the top of the 20 mm GI pipe is to be fixed with funned & wire mesh.

4

65864

16466.02

... More
The top of the 25 X 6 mm copper flats are to be fixed with brass bolts, nuts, washers & brazed with 0.2 M of 50 X 6 mm copper flat across and the same is to be fixed with suitable GI strip to the 40 mm GI pipe. The Entire set is to be placed in the Earth pit , the mixture of 40 Kgs of Hard coke/charcoal , 20 Kgs of salt, & sand is spread around the copper plate and around to the 40 mm GI pipe and the remaining is to be back filled. consolidation / settlement of filled earth pit is to be done by filling water. After giving earth connections to the 50 X 6 mm copper flat with brass bolts, nuts & washers.A pre- casted RCC slab cover with 50 mm thick with lifting hook is to be provided on top of the Earth pit. The rate includes cost and conveyance of all materials, labour charges, incidental charges etc., complete. ( Note: Necessary meggaring testing is to be done in the presence of the concerned Engineers, and the reading should be as per IE standards)

-

-

-

... More
Supply and run of 25mm X 6mm Copper Strip for earth electrode to required places by Surface on walls, flooring including cost of all accessories and giving necessary connection with 3/8"x2" Brass Bolts, Nuts and Washers wherever joints has to be done. The strip has to be either riveted (or) bolted (or) gas welding neatly and all labour charges etc., complete.

5

4796

959.21

... More
Supply and run of 50mm X 6mm Copper Strip for earth electrode to required places by Surface on walls, flooring including cost of all accessories and giving necessary connection with 3/8"x2" Brass Bolts, Nuts and Washers wherever joints has to be done. The strip has to be either riveted (or) bolted (or) gas welding neatly and all labour charges etc., complete.

5

9346

1869.26

... More
Supply and run of 50mm X 6mm G.I Strip for earth electrode to required places by Surface on walls, flooring including cost of all accessories and giving necessary connection with 3/8"x2" GI Bolts, Nuts and Washers wherever joints has to be done. The strip has to be either riveted (or) bolted (or) gas welding neatly and all labour charges etc., complete.

20

4269

213.48

... More
Supply and run of 25mm X 6mm G.I Strip for earth electrode to required places by Surface on walls, flooring including cost of all accessories and giving necessary connection with 3/8"x2" GI Bolts, Nuts and Washers wherever joints has to be done. The strip has to be either riveted (or) bolted (or) gas welding neatly and all labour charges etc., complete.

20

2626

131.32

... More
Aggregates 20 mm nominal size (SS5) (M-053)

5

8857

1771.47

... More
Aggregates 40 mm nominal size (SS5) (M-055)

5

6018

1203.76

... More
Quarry Rubbish (35a)

8

2901

362.64

... More
Measuring of earth resistance in the sub-station yard and building upt to the required level if necessary by suitable methods, necessary instruments for measuring the resistance shall be arranged by the contractor at his cost. The resistance value shall be within the permissible limit prescribed. A certificate for testing of earth resistance shall be furnished.(8TX x 4 Pits x 3 =96 Nos)

96

150342

1566.07

... More
Supply and fixing of 100 A 11 KV Horn Gap fuse set as per IS 9385 on existing DP structure with 6 nos 24 KV /22 KV post Insulators( IS 5350, Hot dipped Hard ware, fuse wire of required size etc., complete

2

11782

5891.33

... More
Supply of 50 mm G.I.Nut and Bolts.

500

8035

16.07

... More
Less buy back offer for old oil from existing transformer

100

-2500

-25



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.