Tirumala Tirupati Devasthanams Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
Tirumala Tirupati Devasthanams Tender
Opening Date12 Jun 2024
Closing Date27 Jun 2024
Tender Amount₹ 7,19,598
Costs
EMD
0Document Cost
Refer DocumentsTender Fee
₹ 255
Summary
Providing Arrangements For Various Festivals At Sri Padmavathi Sametha Sri Venkateswara Swamy Temple,
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
737164Tender No
07/EE-VI/TTD/VJA/2024-25Tender Authority
Tirumala Tirupati Devasthanams ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
.do. For 4 ( four) days
80
15836
197.96
Hire charges for erection and removal of Flat roof pendals or Sloped roof pendals as found necessary with Casurinas or Eucalyptus posts girth of 250 mm to 300 mm measured at one metre above ground level after erection of posts, Bamboos double bamboo mats or coconut leaves with thick covering with necessary frame work, coir rope etc., including providing watch and ward and storing water in tubs etc., complete as directed during execution. The posts should be vertical and not curved, should be uniform size without much knots and should be strong (The rate for pendals will be paid as per area of pendals measured on covering plan area) . The rate quoted is including conveyance of all materials and labour charges for fixing, removal, etc., complete . The rate is for below mentioned calendar days.
-
-
-
.do. For 1 ( One) day
150
2296
15.31
.do. For 4 ( four) days festivals
150
2572
17.15
.do. For Seveen ( 7 ) days festivals
400
7408
18.52
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustvam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days .
-
-
-
.do. For 1 ( One) day
150
4830
32.2
.do. For 4 ( four) days festivals
150
5407
36.05
.do. For Seveen ( 7 ) days festivals
200
7790
38.95
Hire charges for erection and removal of barricading with MS pipes at required places with MS pipes of 40 mm diameter using 2.45m long verticals and 3 to 6 metres horizontals. The barrication provided such that it shall be 2 m above ground level and 0.45 m pipe embedded in the ground with necessary earth work excavation in all soils upto 0.45 m to 0.60 m depth (except rock requiring chiselling ). The horizontals shall be in 3 rows one at 0.50 metres from bottom and balnce two rows at 0.70 metres intervels leaving top gap of 0.10 m to 0.15 m and using vertical pipes at a spacing of 2.40 mts to 2.70 mts using special type gripper clamps ("Nandu" clamps) for keeping the both horizontal and vertical intact and joining pins for horizontals. The barrication shall be strongly fixed with out any shaking including providing inclined struts wherever necessary including labour labour charges for all the operations such as loading unloading erection, removal etc., incuding conveyance charges to site ( both ways) and removing the same after completion of the festival and taking away the materials etc., Duly refilling the pits and levelling the surface etc., complete as directed during the execution. All the clamps shall be covered with rubber sheet for safety, so as to avoid exposure of sharp edges.The rate Quoted is including conveyance of all materials and labour charges for fixing etc., complete. The rate is for below mentioned calender days. The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-
-
-
.do. For 1 ( One) day
60
4186
69.77
.do. For 4 ( four) days festivals
60
4687
78.13
.do. For Seveen (7) days festivals
60
5064
84.41
Hire charges for erection and removal of digital design flex boards with frame work made with of 25mm X 25mm MS square pipe (Light weight) with required back support to erect boards at specified places as directed by the department. The rate is inclusive of materials, labour for printing, erection and removal square pipe (light weight ) after completion of the function.
1600
40336
25.21
Labour for attending the required works etc., complete as directed during execution
-
-
-
II class Labour such as Carpenters / Masons / Plumbers / Welders
30
23329
777.65
Mazdoors
30
21594
719.81
Hire charges of colour carpets including cost of charges for spreading and folding after completion of the festival/function etc., as directed during execution. The rate quoted is including conveyance of all materials. The rate is for below mentioned calender days. The revelant conditions of the foot note mentioned at the end of these items/chapter applies.
-
-
-
.do. For 1 ( One) day
1700
68918
40.54
.do. For 4 ( four) days festivals
1700
73049
42.97
.do. For Seven ( 7) days festivals
2400
108024
45.01
Writing slogans, Rangolies around the temple, over the compound wall and inside the Dhyanamandiram etc.,with two coats of back ground one coat primary & one coat synthetic enamel paint over the sign boards with printing two coats with synthetic enamel paint over the back ground. The rate includes cost of paint , labour charges, scaffolding etc., required for the work. The paint should be done with first quality synthetic enamel paint of approved colour and make as directed during execution.
100
19816
198.16
Polishing the Old wood work with best French Sprit polish of two or more coats of approved quality and make including brushes to have an even shade and including linseed oil, boiled, stopping cloth, cost and conveyance of all materials as directed during execution etc., complete.
200
34686
173.43
Painting with Synthetic enamel paint Single coat for Old wood work. of grade-I approved colour and make including brushes to have an even shade including cost and conveyance of all materials as directed during execution complying with standard specifications etc., complete.
70
3336
47.66
Painting Single coat for old plastered surface with Ready mixed Synthetic Enamel paint in all shades -Grade-I approved colour and make including brushes to have an even shade including cost and conveyance of all materials as directed during execution complying with standard specifications etc., complete.
60
2642
44.04
Painting single coat for old iron with Ready mixed Synthetic Enamel paint in all shades Grade-I having VOC (Volatile Organic Compound) content less than 50 grams/liter approved colour and make including brushes to have an even shade including cost and conveyance of all materials as directed during execution complying with standard specifications etc., complete.
15
660
44.04
Hire charges for erection and removal of Shamiyanas with required posts, rope etc., including anchoring the ropes to the ground with suitable anchoring and incidental charges etc., complete as directed during execution. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete The rate is for below mentioned calendar days.The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-
-
-
for one (1) days
630
10294
16.34
for (3) days
500
8815
17.63
for (7) days
625
12343
19.75
Hire charges for erection and removal of MS pipes Pendals with MS pipes 40 mm dia for veridical, horizontals bracings and roofing. The pendals are firmly fixed with bracings and with necessary frame work/rope etc., and the roof covered with thick white ceiling cloth along with all round frills (jallars) including anchoring to the ropes to the ground with suitable anchoring and necessary watch and ward against theft and fire accidents and incidental charges etc. complete as directed during execution. The rate quoted is including conveyance of all materials (Transportation charges) and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.(The rate for pendals will be paid as per area of pendals measured on covering plan area). Note:- If, there is any deviation in the usage of good quality of cloth effecting pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer-in-Charge.
* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.
-
-
-
for one (1) days
640
58796
91.87
for (3) days
700
69447
99.21
for (7) days
700
77798
111.14
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements