Tirumala Tirupati Devasthanams Tender

To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.

Tirumala Tirupati Devasthanams Tender

Works
Opening Date31 Jan 2025
Closing Soon13 Feb 2025
Tender Amount₹ 6,02,439 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
-do-For 7 days

305

45

13728.05

... More
Hire charges for providing Rain proof shelters of different spans with clear height of 14' at the ends and suitable height at centre with central unsupported span of ranging 30' to 60'. The shelter shall be provided with adequate MS girders, trusses, purlins, bracings, tie rods, anchorages, bolts & nuts etc., suitably designed with necessary anchors to the ground to withstand heavy wind and rain. The shelter shall be firmly tied with cross anchors at all required places using MS strands etc., using necessary bolts, nuts, etc., The entire roof shall be covered suitably with GI sheets/Aluminium sheets/Galvalume sheets firmly fixed to the purlins etc., with necessary bolts/screws, washers etc., so as to have perfect rain proof roof. Covering shall be made such that the shelter shall be totally rain proof during heavy rains and the rain water shall be properly drained off.(This rate is applicable when structure is provided using roof trusses.) Necessary rain water collection facility and drainage arrangement shall be made.The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. The rate is for below mentioned calendar days.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
-do-for 7 days

1000

213

213860

... More
Hire charges for providing White ceiling cloth for decorating the pendals and Mandapam with necessary frame work with decorative frills (jallars) around and border and decorative frills (jallars) at the centre with red or green colour or any other attractive colour wherever necessary etc., complete as directed during execution. The ceiling cloth should be pure white in colour and with out any patches and preferably new or neatly washed and should be in good condition through out the Festival or Ustavam period and should be removed after the same is over and should be repaired or replaced as and when torn out by any means including due to rain with out any extra cost .The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete. The rate is for below mentioned calendar days .(The rate for pendals will be paid as per area of pendals measured on covering plan area) Note: If, there is any deviation in the usage of good quality of cloth effecting the pleasing appearance and if the contractor fails to rectify it as per the directions of Engineer in charge, suitable penalty shall be imposed by the Engineer in charge. * The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
-do-For 7 days

300

38

11685

... More
Hire charges for erection and removal of flat / sloped roof M.S pipes pendals using 40mm MS pipes using special type gripper MS clamps (Nandu clamps) for fixing horizontal bracings and at 2.40m to 2.70m level and jointing pins for horizontal bracings etc. The height of the roof should be between 10' to 12'. The entire roof shall be made of one layer of nylon net with opening of size 100 x 100 mm .The nylon net must be tied alround for stiffness and for tying at the ends. The entre roof is to be covered with PVC coated lacquered finish fabric of approved GSM (750 to 850) over the nylon net for providing shelter. Necessary tying arrangements to be made to the PVC fabric with nylon rope or any other suitable material to keep the same in position. The rate is including earth work excavation in all soils (except rock requiring blasting) to a depth of 0.40m to 0.60m the vertical posts are to be fixed strongly with out any shaking and including labour charges for all the operations such as loading, unloading, erection, watch, ward and conveyance etc., complete.*.Necessary rain water collection facility and drainage arrangement shall be made. *The rate quoted is including conveyance of  all materials  and labour charges for fixing etc., complete. The rate is for below mentioned calendar days. *The relevant conditions of the   foot note mentioned at the end of these items/chapter applies. The rate is for below mentioned calendar days. -do- 7 days

150

216

32430

... More
Hire charges for erection and removal of temporary Dias at a height of 60 cms to 120 cms (2' 0" to 4' 0") from the floor/Ground level using MS pipe vertical supports with adjustable jockey and four sides supporting MS pipe bracing and top covering 19mm ply wood laid on M.S pipes frame work and should be made with out undulation. The rate quoted is including conveyance of all materials and labour charges for fixing etc., complete . The rate is for below mentioned calendar days.* The relevant conditions of the foot note mentioned at the end of these items/chapter applies.

-

-

-

... More
-do-For 7 days

81

553

44859.42

... More
Hire charges for erection and removal of barricading with M.S. frames made with MS hallow square tubes. The barrication provided such that it shall be 1.20m height above the ground level and fixed to the ground (Earth/CC road/B.T road )with base anchors made with MS angle/channels true to alignment. The barrication shall be strongly fixed without any shaking including providing inclined struts wherever necessary including labour charges for all the operations such as loading, unloading ,erection, removal etc., including conveyance charges to site both ways)and removing the same after completion of the festival and taking away the material etc., complete as directed during the execution.

-

-

-

... More
-do-For 7 day

180

178

32095.8

... More
Hire Charges for erection and removal of steps and Landing works using country wood/ Sliver Wood planks of required sizes &thickness using runners, reapers and nails for fixing etc, as directed during execution and spreading Red /Green Colour Carpet on Steps, Landings along with two sides hand rails of required height made with M.S.Pipes and fixing with suitable Clamps without any shakes, etc., complete. The rate is inclusive of Hire charges, conveyance of all materials such as Planks, reapers, Runners Nails, Clamps and Coir Puri as required for the work and labour charges for fixing of entire structure and removal carefully after completion of festival as directed during execution etc., complete but excluding cost of hire charges for supporting structure for steps, Landings etc., For each Festival/ Function. Note: Measurements shall be taken for Treads, Risers & Landings along the Centre line

100

338

33848



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.