State Warehousing Corporation Tender
To know what Andhra Pradesh government has posted about any AP etender, Bidassist helps us to get a one-stop platform where a registered bidder can have access to the details on each and every eprocurement tender. There is no need to provide the details on the AP E-procurement website i.e. https://www.apeprocurement.gov.in as BidAssist helps us find the specific etender we're looking for. BidAassist has collated each and every Eproc Andhra Pradesh Tender on its website.
State Warehousing Corporation Tender
Civil And Construction
Road Construction
Opening Date19 Dec 2024
Closing Date6 Jan 2025
Tender Amount₹ 54,10,199
Costs
EMD
₹ 54,200Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
775145Tender No
1/SWC/AGC58-LC0AW/10/2024-EnggTender Authority
State Warehousing Corporation ViewPurchaser Address
-Website
http://tender.apeprocurement.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Dismantling of existing RR masonry in Cement Mortar and removal of damaged/partially collapsed basement and disposal of debris at 2km lead including loading & unloading, conveyance, hire charges of tools & tackles, all incidental, operational and labour charges etc., for finished item of work as directed by the Engineer-in-charge.for G.No.4&5.
145
910
131950
... More
Dismantling of existing Unreinforced Cement Concrete upto 15cm thickness structure including loading & unloading, conveyance, hire charges of tools & tackles, all incidental, operational and labour charges, all leads & lifts, carting the debris to low lying areas etc., complete for finished item of work as directed by the Engineer-in-charge.for G.No.4&5.
196
2115
414540
... More
Supply, collection & filling of stone dust for filling basement including cost & conveyance of all materials, all leads & lifts, labour charges, watering, consolidation etc., complete.
330
1426
470580
... More
Filling foundations with cement concrete (1:5:10) Prop. using 40 mm gauge (HBG) metal including cost and conveyance of all materials to site of work, labor charges, shoring, strutting, machine mixing and laying of concrete, compacting including curing etc., complete.
18
4796
86328
... More
Providing Masonry work in Cement Mortar (1:6) Prop. with fly ash cement solid blocks of size 290x225x140 mm for manufacturing of fly ash solid blocks using fly ash 80kgs, cement of 15kg gypsum of 5 kg and stone dust including cost & conveyance of all materials, lead & lifts, labour charges, water leads, scaffolding, machine mixing & curing etc., complete with compressive strength not less than 50kgs for 225mm thick walls for superstructure.
155
8654
1341370
... More
Plastering 12mm thick to Brick Masonry in single coat with CM (1:6) Prop. with sponge finishing including cost and conveyance of materials to site of work, curing including all water leads machine mixing etc., complete for finished item of work.
560
425
238000
... More
Flooring with Cement Concrete (1:2:4) prop. 50mm thick using 20mm HBG metal and top finishing in Cement Mortar (1:3) with 8mm thick including cost & conveyance of all materials, leads & lifts, all incidental, operational & labour charges, hire charges of machinery/tools, mixing charges & curing etc., complete for finished item of work as directed by the Engineer-in-charge.
1280
640
819200
... More
Supply & Fixing of PVC coated welded wire mesh and Aluminum wire mesh including cost & conveyance of all materials, hire charges of tools& tackles, all operational & incidental charges, complete for finished item of work. for Air inlets of size 0.75m x 0.75m
204
820
167280
... More
Supply & Fixing of PVC coated welded wire mesh and Aluminum wire mesh including cost & conveyance of all materials, hire charges of tools& tackles, all operational & incidental charges, complete for finished item of work. for Ventilators of size 0.90m x 0.45m.
246
720
177120
... More
Servicing to the existing Rolling Shutters including tensioning of load springs, applying grease to the bearings, guides including cost & conveyance of all materials and labour charges etc., for finished item of work.
88
1000
88000
... More
Supply & application of one coat primer and one coat of synthetic enamel paint for stack plans over the flooring in all compartments of Godown including stack marking, cost & conveyance of all materials, all incidental, operational & hire charges, all leads & transportation charges, proper cleaning & drying the surface before applying the prime coat, etc., (inclusive of all taxes, cess etc.,) complete for finished item of work as directed by the Engineer-in-charge of work. for STACK PLANNING & DENOTATION.For Godown No.1.
1
7690
7690
... More
Supply & application of one coat primer and one coat of synthetic enamel paint for stack plans over the flooring in all compartments of Godown including stack marking, cost & conveyance of all materials, all incidental, operational & hire charges, all leads & transportation charges, proper cleaning & drying the surface before applying the prime coat, etc., (inclusive of all taxes, cess etc.,) complete for finished item of work as directed by the Engineer-in-charge of work. for STACK PLANNING & DENOTATION.For Godown No.3.
1
8036
8036
... More
Supply & application of one coat primer and one coat of synthetic enamel paint for stack plans over the flooring in all compartments of Godown including stack marking, cost & conveyance of all materials, all incidental, operational & hire charges, all leads & transportation charges, proper cleaning & drying the surface before applying the prime coat, etc., (inclusive of all taxes, cess etc.,) complete for finished item of work as directed by the Engineer-in-charge of work. for STACK PLANNING & DENOTATION.For Godown No.4.
1
13074
13074
... More
Supply & application of one coat primer and one coat of synthetic enamel paint for stack plans over the flooring in all compartments of Godown including stack marking, cost & conveyance of all materials, all incidental, operational & hire charges, all leads & transportation charges, proper cleaning & drying the surface before applying the prime coat, etc., (inclusive of all taxes, cess etc.,) complete for finished item of work as directed by the Engineer-in-charge of work. for STACK PLANNING & DENOTATION.For Godown No.5.
1
9805
9805
... More
Electrification to Godowns: Supply and Fixing of 25mm dia 1.8mm thick surface P.V.C. pipe (ISI MARK) with all accessories fixing on chromium plated metallic base saddles including all labour charges etc., complete for run of mains. SSR Item No.1.3.2
1020
121
123420
... More
Supply and run of 2 of 14/0.3mm (1.0 Sq.mm) Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe for mains including all labour charges etc., complete SSR Item No.3.1.1. For wiring to all electrical points from circuit to light points.
1820
70
127400
... More
Supply and run of 2 of 36/0.3mm (2.5 Sq.mm) F.R P.V.C. insulated flexible copper cable in existing pipe for mains inlcuding all labour charges etc., complete.SSR Item No.3.1.4.
1920
112
215040
... More
Wiring with 2 runs (excluding cost of wire )Fire Retardant (FR) P.V.C. insulated flexible copper cable (ISI MARK) in existing pipe with 6A switch, Ceiling rose and 3mm thick hylam sheet covering to switch control box including all labour charges etc., complete for finished item of work.
110
493
54230
... More
Supply and Run of No.14 SWG G.I wire including cost of all accessories and labour charges etc., complete.SSR Item No.5.2.4.
35
21
735
... More
Supply and run of 1 of 14 /0.3mm (1.0 Sq.mm) FR P.V.C. insulated flexible copper cable in existing pipe for earth continuity including all labour charges etc., complete.SSR Item No.3.1.2.
1920
35
67200
... More
Supply and fixing of 6A 3 pin wall plug socket with 6A switch control on a common switch board with earth continuity including wire leads, earth connections along with all labour charges etc., complete.SSR Item No.2.1.4.
30
183
5490
... More
Supply and fixing SPN Distribution board with IP-20 protection suitable for single phase Earth Leakage Circute Braker (ELCB) / Residual Current Circute Braker (RCCB) / Double Pole (DP) Isolator as incomer and 6-32A 10kA SP MCBs as out going including internal connections.
3
4658
13974
... More
Fixing of 40W street light luminaire to the wall with 1.0 Mtr., 25mm dia GI pipe bracket and anti tilting MS flat etc., including giving connections and labour charges etc., complete.SSR Item No.7.9.5.
9
2833
25497
... More
Supply and Transportation of 40W LED tube light luminaire , etc., including 1No 40W tube etc., complete.SSR Item No.8.2.4.
100
551
55100
... More
R&M to Roads: Hiring an Excavator (JCB) for Scarifying, Levelling the uneven surface as directed by the Engineer incharge of work, including cost of all materials, overhead charges & contractor's profit and seigniorage charges but excluding GST etc, complete for finished item of work.
12
1500
18000
... More
Providing, laying, spreading and compacting stone aggregates to wet mix macadam specification including premixing the material with water OMC in mechanical mixer ( Pug Mill),carriage of mixed material by tipper to site,laying in uniform layers in sub-base course on a well prepared sub-base and copacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintanance of diversion etc., complete as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD including all overheads, contractor's profit but excluding GST and seigniorage charges.
240
2950
708000
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements